← Back
BuildNYC
Two family brick
2703 FENTON AVENUE
BRONX · Pelham Gardens · BIN 2054489
💬 Discuss this project
1940Year Built
1Stories
B1Building Class
R4Zoning
1,575 sfGross Floor Area
2Units
0 Active Violations
Two family brick · 2,000 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 19p · 1 filing · 19 docs
Basement10p · 1 filing · 19 docs
Filed — no permit issuedAlteration to convert 1 dwelling unit to 29p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2015$360K—Private party → Private party$229/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
St Design & Consulting305/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H Drummond Exp603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L J Electrical ServiceElectrical103/22/2026
Lal-Ita ConstructionGeneral Contractor104/09/2026
Cape PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asr Engineering8404202/26/2025
Building Lifecycle
08/26/2026
Signed off — Alteration CO
Application filing for conversion of an exist 1 story building from 1 family DU to 2 family DU with interior renovation on Basement as required as per plan submitted herewith and apply a new C of O. No change in bulk, egress or use.
X01186354-S2
01/11/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01186354-I1-GC
11/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
40 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCape Plumbing08/13/2025
DOB NOWGeneral ConstructionPermit IssuedLal-Ita Construction07/22/2025
1 project · most recent 05/15/2025
Water/Sanitary
FiledStatusContractorScope
05/15/2025Signed-offCape PlumbingWater/Sanitary
2 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026CompleteAL-Lectric Elect'l Contracting—
06/24/2026CompleteL J Electrical ServiceGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/10/2025HVAC-R and service water piping design and insulationMD SHAMIM AKONDenergy_progress
03/11/2025Permanent certificateMD SHAMIM AKONDenergy_progress
02/25/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
02/25/2025Energy Code Compliance InspectionsMD SHAMIM AKONDprogress
02/25/2025Fire-Resistance Rated ConstructionMD SHAMIM AKONDprogress
02/25/2025Electric vehicle service equipment requirementsMD SHAMIM AKONDenergy_progress
02/25/2025Interior lighting powerMD SHAMIM AKONDenergy_progress
02/25/2025MeteringMD SHAMIM AKONDenergy_progress
02/25/2025Maintenance informationMD SHAMIM AKONDenergy_progress
11/06/2024Energy Code Compliance Inspections—progress
11/06/2024Fire-Resistance Rated Construction—progress
10/27/2024Metering—energy_progress
10/27/2024Maintenance information—energy_progress
10/27/2024Interior lighting power—energy_progress
10/27/2024Fire-Resistant Penetrations and JointsAKM RAHMANspecial
10/27/2024Electric vehicle service equipment requirements—energy_progress
10/17/2024Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account