← Back
BuildNYC
Multi-story retail building (2+)
2704 EAST TREMONT AVENUE
BRONX · BIN 2041960
💬 Discuss this project
1909Year Built
2Stories
K2Building Class
R6Zoning
7,318 sfGross Floor Area
9Units
5 Active Violations 1 unresolved · 4 paperwork only ▸
Multi-story retail building (2+) · Owner of record: 3269 Third Avenue Trust · 6,911 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofKitchen exhaust ductwork and interior renovation1p · 1 filing · 5 docs
Floor 1Restaurant Renovation and Canopy RemovalUnder Construction11p · 5 filings · 20 docs
CellarReplace existing commercial gas meterUnder Construction7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LLTS Fairmount Co503/22/2026
3269 Third Avenue Trust103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2023$3.9M—L.L. & S. FAIRMONT CO. LLC → 3269 THIRD AVENUE TRUST$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 Engineering202/03/2026
Zheng & Associates612/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Designworks Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Watson's Plumbing, Heating, & BuildingPlumbing407/08/2026
Symmetrical ConstructionGeneral Contractor307/25/2026
YX ConstructionGeneral Contractor307/08/2026
Domenici MichaelElectrical103/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252202/03/2026
Zheng & Associates7330612/20/2021
Building Lifecycle
All (66)Filed (8)Permit Issued (7)Violation (6)Inspection (7)Objection (10)Special Inspection (28)
07/23/2026
Permit issued — Mechanical Systems
X01354991-I1-GC
04/17/2026
Permit issued — General Construction
X01354991-I1-GC
04/17/2026
Permit issued — Mechanical Systems
X01354991-I1-MS
03/30/2026
Permit issued — Plumbing
X01355028-I1-PL
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/02/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Mechanical
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Energy
02/26/2026
Objection raised — Inspections
02/26/2026
Objection raised — Fire_Protection
02/06/2026
Violation issued (ECB, open)
Construction
02/03/2026
Filed — Alteration
RENOVATE EXISTING RESTAURANT, BUILD HALF PARITION WITH COUNTER, MOVE EXISTING NON-LOAD BEARING, REMOVE HVAC UNIT, ADD STAINLESS STEEL PANELS IN KITCHEN. PLASTER AND PAINTING, REMOVE EXTERIOR CANOPY, NEW HOOD WITH VENTILATION DUCT TO ROOF.
X01354991-I1
02/03/2026
Filed — Alteration
X01355028-I1
02/03/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
02/03/2026
Special inspection requirement — Final
NAVEEN KUMAR
12/29/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/22/2021
Special inspection requirement — Metering
Jinfar Liu
12/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
12/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
12/22/2021
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
12/21/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/20/2021
Filed — Alteration
Interior renovation for existing restaurant @ 1st. Floor. No change in use, egress and occupancy.
X00538938-P1
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
12/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
12/20/2021
Special inspection requirement — Metering
Jinfar Liu
12/20/2021
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
12/10/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/30/2021
Filed — Alteration
PUMBING WORK FOR EXISTING RESTAUTRANT @ 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00542995-P2
11/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
11/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
11/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
11/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
11/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
11/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
11/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
11/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
11/18/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2021
Filed — Alteration
PUMBING WORK FOR EXISTING RESTAUTRANT @ 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00542995-P1
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
10/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
10/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
10/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
09/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/22/2021
Permit issued — Plumbing
X00542995-I1-PL
07/07/2021
Permit issued — General Construction
X00538938-I1-GC
07/01/2021
Permit issued — Mechanical Systems
X00543001-I1-MS
06/22/2021
Filed — Alteration
INSTALL KITCHEN HOOD AND REFRIGERATION SYSTEM @ 1ST. FLOOR. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
X00543001-I1
06/22/2021
Filed — Alteration
PUMBING WORK FOR EXISTING RESTAUTRANT @ 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00542995-I1
06/21/2021
Filed — Alteration
Interior renovation for existing restaurant @ 1st. Floor. No change in use, egress and occupancy.
X00538938-I1
06/18/2021
Special inspection requirement — Mechanical Systems
Jinfar Liu
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSymmetrical Construction07/23/2026
DOB NOWGeneral ConstructionPermit IssuedSymmetrical Construction04/17/2026
DOB NOWMechanical SystemsPermit IssuedSymmetrical Construction04/17/2026
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing03/30/2026
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building07/22/2021
DOB NOWGeneral ConstructionPermit IssuedYX Construction07/07/2021
DOB NOWMechanical SystemsPermit IssuedYX Construction07/01/2021
BISOTISSUEDForeview Construction10/11/2012
BISPLISSUEDBarmor Rehab10/11/2012
BISPLISSUEDL.L. & S. Fairmount Co10/01/2010
BISFPISSUEDMaster Fire Systems02/27/2007
BISFPISSUEDMaster Fire Systems09/07/2002
BISOTISSUEDWKL Construction09/10/1996
BISFPISSUEDMaster Fire Prevention Systems08/12/1991
1 project · most recent 06/22/2021
Others Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2021Permit IssuedYX ConstructionOthers, Refrigeration Systems
Refrigeration
Tecumseh ASHR9460ZNAFS1 4,600 BTU · Refrigeration Unit ×2
Other
Pantin ZF120N24R2A1BAA1A3 7,200 CFM · Kitchen Exhaust ×1
1 project · most recent 11/30/2021
Gas Water/Sanitary
FiledStatusContractorScope
11/30/2021Permit IssuedWatson's Plumbing, Heating, & BuildingGas, Water/Sanitary
1 project · most recent 02/16/2026
FiledStatusContractorScope
02/16/2026CompleteTriple H Electrical—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/29/2021Fail-Final General Construction Non-Directive 14FailView ↗
12/21/2021Fail-Final General Construction Non-Directive 14FailView ↗
12/10/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/10/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/03/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
02/03/2026FinalNAVEEN KUMARprogress
12/22/2021MeteringJinfar Liuenergy_progress
12/22/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
12/22/2021Energy Code Compliance InspectionsJinfar Liuprogress
12/22/2021Lighting in dwelling unitsJinfar Liuenergy_progress
12/20/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
12/20/2021Energy Code Compliance InspectionsJinfar Liuprogress
12/20/2021MeteringJinfar Liuenergy_progress
12/20/2021Lighting in dwelling unitsJinfar Liuenergy_progress
11/30/2021HVAC-R and service water heating equipmentJinfar Liuenergy_progress
11/30/2021Energy Code Compliance InspectionsJinfar Liuprogress
11/30/2021HVAC-R and service water heating system controlsJinfar Liuenergy_progress
11/30/2021HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
11/30/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
11/29/2021Energy Code Compliance InspectionsJinfar Liuprogress
11/29/2021HVAC-R and service water heating system controlsJinfar Liuenergy_progress
11/29/2021HVAC-R and service water heating equipmentJinfar Liuenergy_progress
11/29/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
11/29/2021HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/27/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
10/27/2021Energy Code Compliance InspectionsJinfar Liuprogress
10/27/2021HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/27/2021HVAC-R and service water heating equipmentJinfar Liuenergy_progress
Latest 25 of 28.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026X00543001-I1Request digital key ↗
08/25/2026X00542995-P2Request digital key ↗
08/25/2026X00542995-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
10/12/2012220228741Open ↗
10/11/2012220228741Open ↗
10/01/2010220080631Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/12/2012220228741Open ↗
09/03/2010220080631Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026X00542995-P2Open ↗
09/28/2026X00542995-P2Open ↗
09/23/2026X01354991-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00543001-I1Open ↗
08/25/2026X00542995-P1Open ↗
08/25/2026X00542995-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/28/2026X00542995-P2Open ↗
09/23/2026X01354991-I1Open ↗
09/23/2026X01354991-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/12/2012220228741Open ↗
09/03/2010220080631Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/12/2012220228741Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/12/2012220228741Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
11/27/2012220228741Open ↗
11/17/2012220228741Open ↗
▸BISSCHEDULE B - PLUMBING1
09/12/2012220228741Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026X00543001-I1Open ↗
08/25/2026X00542995-I1Open ↗
08/25/2026X00542995-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/03/2010220080631Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/12/2012220228741Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/12/2012220228741Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
09/12/2012220228741Open ↗
09/03/2010220080631Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/12/2012220228741Open ↗
09/03/2010220080631Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/12/2012220228741Open ↗
09/03/2010220080631Open ↗