Elevator apt, fireproof without stores
2705 SCHLEY AVENUE
BRONX · BIN 2080423
💬 Discuss this project
1978Year Built
6Stories
D3Building Class
R4Zoning
74,543 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 109,375 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof9p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 311p · 1 filing · 9 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 16p · 1 filing · 9 docs
Cellar4p · 1 filing · 9 docs
1 job · most recent 03/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/23/2026——Gas, Storm, Water/Sanitary
8 jobs · most recent 04/01/2024
Boiler Controls General Wiring
FiledStatusContractorScope
04/01/2024CompleteN.Y.C. HOUSING AUTHORITYGeneral Wiring
11/26/2022Permit IssuedN.Y.C. HOUSING AUTHORITY—
09/17/2021Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
11/10/2020Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
11/15/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
04/24/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
04/23/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
03/27/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 jobs · most recent 01/29/2026
Steel Masonry
FiledStatusContractorScope
01/29/2026Signed-offMICHAEL S. KAPLAN1 scope_items
04/04/2025——Steel, Masonry
1 job · most recent 01/29/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/29/2026Signed-offMICHAEL S. KAPLANTenant Protection Plan 72 Hour
Building Lifecycle
All (123)Filed (23)Permit Issued (13)Signed Off (6)Violation (29)Inspection (4)Objection (18)Special Inspection (30)
04/29/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/30/2026
Objection raised — Other
03/30/2026
Objection resolved — Addressed
03/23/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363476-S1
03/20/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363476-S2
03/20/2026
Special inspection requirement — Post-installed Anchors
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363476-I1
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Chimneys and vents
03/19/2026
Special inspection requirement — Post-installed Anchors
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
03/13/2026
Special inspection requirement — Shutoff dampers
03/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/13/2026
Special inspection requirement — Maintenance information
03/13/2026
Special inspection requirement — Heating Systems
03/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/06/2026
Special inspection requirement — Lighting in dwelling units
03/06/2026
Special inspection requirement — Lighting controls
03/06/2026
Special inspection requirement — Vestibules
03/06/2026
Special inspection requirement — Insulation placement and R values
03/06/2026
Special inspection requirement — Interior lighting power
03/06/2026
Special inspection requirement — Exterior lighting power
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/06/2026
Special inspection requirement — Fenestration air leakage
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/26/2026
Special inspection requirement — Mechanical Systems
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/26/2026
Special inspection requirement — Final
02/23/2026
Special inspection requirement — Final
02/18/2026
Permit issued — Boiler Equipment
X01329580-I1-BE
02/18/2026
Permit issued — Boiler Equipment
X00763679-I1-BE
01/29/2026
Filed — Alteration
Registration of a temporary trailer-mounted steam boiler, which will be used to provide steam for heating purposes when required on demand at NYCHA facilities.
X01329580-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2025
Special inspection requirement — Structural Steel - Details
04/04/2025
Filed — Alteration
SCOPE OF WORK INCLUDES BUT NOT LIMITED TO REPLACINF THE PRECAST CONCRETE ROOF PLANKS, AND ROOFING, THE INSTALLATION OF NEW HANDRAILS, REPAIROF DETERIORATED CONCRETE, MASONRY REPAIR AND DUNNAGE BEAM REPLACEMENT.
X00970250-P3
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Other
06/26/2024
Filed — Alteration
SCOPE OF WORK INCLUDES BUT NOT LIMITED TO REPLACINF THE PRECAST CONCRETE ROOF PLANKS, AND ROOFING, THE INSTALLATION OF NEW HANDRAILS, REPAIROF DETERIORATED CONCRETE, MASONRY REPAIR AND DUNNAGE BEAM REPLACEMENT.
X00970250-P2
05/16/2024
Permit issued — Boiler Equipment
X00763679-I1-BE
04/24/2024
Filed — Alteration
SCOPE OF WORK INCLUDES BUT NOT LIMITED TO REPLACINF THE PRECAST CONCRETE ROOF PLANKS, AND ROOFING, THE INSTALLATION OF NEW HANDRAILS, REPAIROF DETERIORATED CONCRETE, MASONRY REPAIR AND DUNNAGE BEAM REPLACEMENT.
X00970250-P1
01/19/2024
Objection resolved — Addressed
01/19/2024
Objection resolved — Addressed
01/19/2024
Objection resolved — Addressed
Latest 60 of 123 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY1708/28/2026
NYCHA3507/08/2026
N Y C HOUSING AUTHORITY303/22/2026
NYC HA 9103/22/2026
DESIGN DEPT NYCHA1203/21/2026
NYHA303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IMEG CONSULTING CORP.203/23/2026
CURTIS + GINSBERG ARCHITECTS LLP103/19/2026
KEMS ENGINEERING AND CONSTRUCTION101/29/2026
NYCHA404/04/2025
RLM ENGINEERING PLLC1509/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCHA403/21/2026
LEWSAN CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMG INDUSTRIAL CHIMNEY INGeneral Contractor303/21/2026
HARRYNARINE MAHARAJElectrical103/21/2026
RAVINDRA DIADATElectrical103/21/2026
RYBURN PHILLIPSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355101/29/2026
RLM ENGINEERING PLLC69131509/08/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN02/18/2026
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN02/18/2026
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC05/16/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC11/23/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC11/23/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC11/23/2022
DOB NOWGeneral ConstructionSigned-offEMG INDUSTRIAL CHIMNEY IN08/31/2022
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I12/20/2021
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I12/20/2021
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I12/20/2021
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I12/10/2021
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I10/25/2021
DOB NOWBoiler EquipmentSigned-offBOILERMATIC WELDNG INDS I04/02/2021
BISPLISSUEDRICHARDS P AND H CO, INC12/10/2010
BISPLISSUEDI.M.P. PLBG. & HTG. CORP04/03/2008
BISBLISSUEDI.M.P. PLBG. & HTG. CORP06/29/2007
BISBLISSUEDI.M.P. PLBG. & HTG. CORP10/08/2004
BISOTISSUEDPYTHAGORAS GENERAL CONTRACTING03/22/2002
BISBLISSUEDI.M.P. PLBG. & HTG. CORP01/29/2002
BISPLISSUEDPYTHAGORAS GENERAL CONTRACTING12/24/2001
BISBLISSUEDI.M.P. PLBG. & HTG. CORP01/29/2001
BISMHISSUEDG & T MECHANICAL CO INC07/02/1998
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/29/2026Pass-Final Boiler Equipment InspectionPassView ↗
12/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/21/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
03/20/2026Fire-Resistant Penetrations and Joints—special
03/20/2026Post-installed Anchors—special
03/19/2026Chimneys and vents—special
03/19/2026Post-installed Anchors—special
03/19/2026Fire-Resistant Penetrations and Joints—special
03/13/2026Maintenance information—energy_progress
03/13/2026Energy Code Compliance Inspections—progress
03/13/2026Heating Systems—special
03/13/2026Shutoff dampers—energy_progress
03/13/2026HVAC-R and service water heating system controls—energy_progress
03/13/2026HVAC-R and service water heating equipment—energy_progress
03/13/2026HVAC-R and service water piping design and insulation—energy_progress
03/06/2026Fenestration air leakage—energy_progress
03/06/2026Insulation placement and R values—energy_progress
03/06/2026Fenestration and door U-factor and product ratings—energy_progress
03/06/2026Lighting controls—energy_progress
03/06/2026Lighting in dwelling units—energy_progress
03/06/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Energy Code Compliance Inspections—progress
03/06/2026Fire-Resistance Rated Construction—progress
03/06/2026Vestibules—energy_progress
03/06/2026Exterior lighting power—energy_progress
03/06/2026Interior lighting power—energy_progress
02/26/2026Mechanical Systems—special
02/26/2026Tenant Protection Plan Compliance—special
Latest 25 of 104.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/25/2026X00484013-I1Request digital key ↗
08/25/2026X00523612-P1Request digital key ↗
08/25/2026X00523612-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
07/29/2013220289523Open ↗
07/26/2013220252401Open ↗
05/13/2013220289523Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
12/10/2010220090229Open ↗
04/04/2008210023972Open ↗
▸BISPLACE OF ASSEMBLY1
05/11/2017220593285Open ↗
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature31
09/28/2026X00763679-I1Open ↗
09/28/2026X00763679-I1Open ↗
09/28/2026X00763679-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026X00523612-I1Open ↗
08/25/2026X00523612-P1Open ↗
08/25/2026X00523540-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/28/2026X00763679-I1Open ↗
09/28/2026X00763679-I1Open ↗
09/23/2026X00484013-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/11/2017220593285Open ↗
11/04/2010220090229Open ↗
11/21/2007210023972Open ↗
▸Trade Schedules & Equipment6
▸BISFA - FDNY APPROVAL : FD-FAA2
12/22/2014220252401Open ↗
08/28/2014220289523Open ↗
▸BISSCHEDULE B - PLUMBING2
11/04/2010220090229Open ↗
11/21/2007210023972Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/25/2008210023972Open ↗
06/25/2008210023972Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/13/2013220289523Open ↗
02/13/2013220252401Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00742410-P1Open ↗
08/24/2026X00742410-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/04/2010220090229Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.5
08/13/2026X00523503-I1Open ↗
08/13/2026X00523540-I1Open ↗
08/13/2026X00523587-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification5
08/13/2026X00523503-I1Open ↗
08/13/2026X00523612-I1Open ↗
08/13/2026X00484013-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
11/21/2007210023972Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/25/2026X00523540-I1Open ↗
08/25/2026X00523540-P1Open ↗
08/24/2026X00523587-I1Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/21/2015220252401Open ↗
12/22/2014220252401Open ↗
12/22/2014220289523Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/13/2013220252401Open ↗
11/04/2010220090229Open ↗
11/21/2007210023972Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/10/2017210023972Open ↗
12/22/2014220252401Open ↗
12/22/2014220289523Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
05/13/2013220289523Open ↗
02/13/2013220252401Open ↗
11/04/2010220090229Open ↗
▸BISADDITIONAL INFORMATION1
08/30/2018220593285Open ↗
▸BISBOROUGH INTAKE FORM1
08/15/2017210023972Open ↗