Auto body / collision or auto repair
2707 WEST 16 STREET
BROOKLYN · BIN 3188474
💬 Discuss this project
1935Year Built
1Stories
G2Building Class
M1-2Zoning
1,790 sfGross Floor Area
1Units
6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Auto body / collision or auto repair · Owner of record: 2707 W 16TH LLC · 2,375 sf lot · 0.75 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
MezzanineUnder Construction8p · 1 filing · 20 docs
1 job · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026——Sprinkler System
1 job · most recent 08/20/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPGas, Plumbing-Sprinkler, Water/Sanitary
1 job · most recent 09/14/2026
FiledStatusContractorScope
09/14/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 job · most recent 08/20/2026
Steel
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPSteel
3 jobs · most recent 08/20/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPSidewalk Shed
08/14/2026Permit IssuedTITAN SERVICES USA INCSidewalk Shed
07/28/2026——Fence
Building Lifecycle
All (53)Filed (8)Permit Issued (3)Violation (6)Objection (6)Special Inspection (30)
09/15/2026
Permit issued — Sidewalk Shed
B01445977-I1-SH
08/21/2026
Special inspection requirement — Sprinkler Systems
Ashish Patel
08/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-P3
08/18/2026
Special inspection requirement — Sprinkler Systems
Ashish Patel
08/14/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01445977-I1
08/06/2026
Violation issued (ECB, open)
Unknown
08/06/2026
Violation issued (ECB, open)
Unknown
08/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-S3
08/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Ashish Patel
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
08/03/2026
Special inspection requirement — Concrete - Precast
Ashish Patel
08/03/2026
Special inspection requirement — Masonry
Ashish Patel
08/03/2026
Special inspection requirement — Structural Steel - Details
Ashish Patel
08/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Ashish Patel
08/03/2026
Special inspection requirement — Structural Steel - Welding
Ashish Patel
08/03/2026
Special inspection requirement — Sprayed fire-resistant materials
Ashish Patel
08/03/2026
Special inspection requirement — Subgrade Inspections
Ashish Patel
08/03/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Ashish Patel
08/03/2026
Special inspection requirement — Final
08/03/2026
Special inspection requirement — Structural Cold-Formed Steel
07/28/2026
Filed — Alteration
8FT High Wood Construction Fence with Man Doors and Gate.
B01437185-I1
07/18/2026
Objection resolved — Resolved
07/18/2026
Objection resolved — Resolved
07/17/2026
Violation issued (ECB, open)
Unknown
07/17/2026
Violation issued (ECB, open)
Unknown
07/17/2026
Violation issued (ECB, open)
Construction
07/17/2026
Violation issued (ECB, open)
Site Safety
07/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-P2
07/09/2026
Special inspection requirement — Sprinkler Systems
Ashish Patel
07/07/2026
Objection raised — Other
07/07/2026
Objection raised — Other
07/06/2026
Permit issued — Plumbing
B01229208-S2-PL
07/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-P1
06/23/2026
Special inspection requirement — Masonry
Ashish Patel
06/23/2026
Special inspection requirement — Post-installed Anchors
Ashish Patel
06/23/2026
Special inspection requirement — Sprayed fire-resistant materials
Ashish Patel
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
06/23/2026
Special inspection requirement — Lowest Floor Elevation
Ashish Patel
06/23/2026
Special inspection requirement — Fenestration areas
Ashish Patel
06/23/2026
Special inspection requirement — Air barrier - visual inspection
Ashish Patel
06/23/2026
Special inspection requirement — Interior lighting power
Ashish Patel
06/23/2026
Special inspection requirement — Insulation placement and R values
Ashish Patel
06/23/2026
Special inspection requirement — Exterior lighting power
Ashish Patel
06/23/2026
Special inspection requirement — Lighting controls
Ashish Patel
06/23/2026
Special inspection requirement — Protection of exposed foundation insulation
Ashish Patel
06/23/2026
Special inspection requirement — Fenestration air leakage
Ashish Patel
06/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-S2
06/01/2026
Permit issued — General Construction
B01229208-I1-GC
07/01/2025
Objection resolved — Addressed
06/09/2025
Objection raised — Admin
05/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT1 CO FILING FOR THE PROPOSED INSTALLATION OF A PRE-FABRICATEDAND PAINT SPRAY BOOTH ON FIRST FLOOR AND THE ADDITION OF MEZZANINE FLOOR.
B01229208-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA109/16/2026
EXPRESS AUTO GROUP909/13/2026
2707 WEST 16TH STREET203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2025$1.6M—— → —$866/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/708/20/2026
FL&M ENGINEERING DESIGN &INSPECTION108/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER G CONSTRUCTION CORPGeneral Contractor107/08/2026
TITAN SERVICES USA INCGeneral Contractor109/16/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027608/20/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC09/15/2026
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP07/06/2026
DOB NOWGeneral ConstructionPermit IssuedSUPER G CONSTRUCTION CORP06/01/2026
BISOTISSUEDD. DONNCO LTD.10/27/1992
BISEQISSUEDD. DONNCO LTD.10/27/1992
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/21/2026Sprinkler SystemsAshish Patelspecial
08/18/2026Sprinkler SystemsAshish Patelspecial
08/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Ashish Patelspecial
08/03/2026Concrete - Cast-In-PlaceAshish Patelspecial
08/03/2026Concrete - PrecastAshish Patelspecial
08/03/2026MasonryAshish Patelspecial
08/03/2026Structural Steel - DetailsAshish Patelspecial
08/03/2026Structural Steel - High Strength BoltingAshish Patelspecial
08/03/2026Structural Steel - WeldingAshish Patelspecial
08/03/2026Sprayed fire-resistant materialsAshish Patelspecial
08/03/2026Subgrade InspectionsAshish Patelspecial
08/03/2026Subsurface Conditions – Fill Placement & In-Place DensityAshish Patelspecial
08/03/2026Final—progress
08/03/2026Structural Cold-Formed Steel—special
07/09/2026Sprinkler SystemsAshish Patelspecial
06/23/2026MasonryAshish Patelspecial
06/23/2026Post-installed AnchorsAshish Patelspecial
06/23/2026Sprayed fire-resistant materialsAshish Patelspecial
06/23/2026Structural Stability – Alterations of existing buildingsAshish Patelspecial
06/23/2026Energy Code Compliance InspectionsAshish Patelprogress
06/23/2026Fire-Resistance Rated ConstructionAshish Patelprogress
06/23/2026Lowest Floor ElevationAshish Patelprogress
06/23/2026Fenestration areasAshish Patelenergy_progress
06/23/2026Air barrier - visual inspectionAshish Patelenergy_progress
06/23/2026Interior lighting powerAshish Patelenergy_progress
Latest 25 of 33.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01229208-P3Request digital key ↗
08/21/2026B01229208-S3Request digital key ↗
08/21/2026B01229208-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/19/2010320048088Open ↗
09/16/2009320048088Open ↗
09/15/2009320048088Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
08/27/2026B01229208-P1Open ↗
08/27/2026B01229208-P1Open ↗
08/27/2026B01229208-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B01229208-P3Open ↗
08/28/2026B01229208-S2Open ↗
08/27/2026B01229208-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01229208-P3Open ↗
08/21/2026B01229208-S3Open ↗
08/21/2026B01229208-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/23/2009320048088Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/24/2009320048088Open ↗
▸BISSCHEDULE B - PLUMBING1
07/24/2009320048088Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/23/2009320048088Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01229208-I1Open ↗
08/21/2026B01229208-P3Open ↗
08/21/2026B01229208-S3Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/23/2009320048088Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE3
09/16/2009320048088Open ↗
07/24/2009320048088Open ↗
09/15/2009320048088Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/24/2009320048088Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/23/2009320048088Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/24/2009320048088Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/21/2026B01229208-I1Open ↗
08/15/2026B01229208-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026B01229208-P1Open ↗
08/13/2026B01229208-I1Open ↗
▸BISPLOT DIAGRAM1
07/24/2009320048088Open ↗