Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUnder Construction45p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Structural
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 7 drawing sheets
BulkheadUnder Construction2p · 1 filing · 20 docs
ArchitectureMechanicalStructural
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 2 drawing sheets
Floor 4Interior demolition of non-structural partitionsUnder Construction85p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 6 drawing sheets
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents
INSTALLATION OF TEMPORARY 12' HIGH PIPE SCAFFOLD ORIGINATING (ABOVE SECOND FLOOR ROOF OFF SHED)FOR EXISTING BUILDING REMEDIAL WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION#M00063731.
On file for this project
2 documents
Floor 3Interior demolition of non-structural partitionsUnder Construction83p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 4 drawing sheets
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY 12' HIGH PIPE SCAFFOLD ORIGINATING (ABOVE SECOND FLOOR ROOF OFF SHED)FOR EXISTING BUILDING REMEDIAL WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION#M00063731.
On file for this project
2 documents
Floor 2Interior demolition of non-structural partitionsUnder Construction82p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 5 drawing sheets
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents
Floor 1Interior demolition of non-structural partitionsUnder Construction84p · 3 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sprinklers · Structural
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 4 drawing sheets
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
CellarInterior demolition of non-structural partitionsUnder Construction81p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Support of Excavation
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 4 drawing sheets
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents
BasementUnder Construction83p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT A NEW R-3BUILDING.
On file for this project
103 documents · 7 drawing sheets
Sub-BasementInterior demolition of non-structural partitions2p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND FINISHES. NO EXTERIOR DEMOLITION. NO STRUCTURAL DEMOLITION. THERE IS TO BE NO CHANGE OF USE OR OCCUPANCY.
On file for this project
5 documents
Site & exteriorTemporary site specific engineered enclosure systemUnder Construction34p · 7 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Installation of temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 8 drawing sheets
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 5 drawing sheets
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.