← Back
Primarily 1 family with 1 store or office
2712 GERRITSEN AVENUE
💬 Discuss this project
1920Year Built
2Stories
S1Building Class
R4Zoning
2,256 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: LAFAI REALTY, LLC · 1,260 sf lot · 1.79 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAFAI REALTY, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES CALLAHAN512/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&M PIPING & HTG INCPlumbing307/08/2026
Building Lifecycle
All (14)Filed (5)Permit Issued (3)Signed Off (1)Violation (2)Inspection (3)
12/04/2025
Filed — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01113902-P2
11/24/2025
Permit issued — Plumbing
B01113902-I1-PL
02/27/2025
Signed off — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01113902-S1
02/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/06/2025
Permit issued — Boiler Equipment
B01113902-S1-BE
01/28/2025
Filed — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01113902-S1
01/23/2025
Filed — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01167221-I1
11/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/06/2024
Filed — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01113902-P1
10/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2024
Permit issued — Plumbing
B01113902-I1-PL
09/19/2024
Filed — Alteration
INSTALLATION OF NEW BOILER EQUIPMENT TO SERVE HEATING / HOT WATER SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01113902-I1
09/18/2024
Violation issued (ECB, closed)
Construction
09/17/2020
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC11/24/2025
DOB NOWBoiler EquipmentSigned-offR&M PIPING & HTG INC02/06/2025
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC10/01/2024
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM04/03/2001
BISPLISSUEDD,D PLMBING INC11/16/2000
BIS—ISSUEDGERRITSEN CONTRACTING08/04/2000
1 project · most recent 12/04/2025
Gas
FiledStatusContractorScope
12/04/2025Signed-offR&M PIPING & HTG INCGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01113902-P2Request digital key ↗
08/24/2026B01113902-S1Request digital key ↗
08/24/2026B01113902-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01113902-P2Open ↗
08/24/2026B01113902-S1Open ↗
08/24/2026B01113902-P1Open ↗
Showing 3 of 5 on file for this type