← Back
BuildNYC
Two family brick
2715 CRUGER AVENUE
BRONX · BIN 2053574
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,165 sfGross Floor Area
2Units
Rent Stabilized14 Active Violations ▸
Two family brick · Owner of record: 2715 Cruger Ave · 3,125 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 20 docs
Floor 225p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar22p · 1 filing · 20 docs
Basement10p · 1 filing · 20 docs
Filed — no permit issuedFacade repair works2p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bagad Realty2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2024$999K—768 BECK HOLDINGS LLC → 2715 CRUGER AVE LLC$461/sf building
04/29/2024$774K—MORGAN STANLEY CAPITAL I INC TRUST 2007-HE5 → 768 BECK HOLDINGS LLC$357/sf building
02/25/2020$1.1M—Private party → DEUTSCHE BANK NATIONAL TRUST COMPANY$505/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RI Consulting Services111/05/2026
Adb Associates601/16/2026
Vasilios Artemiou PE109/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB Builders NYspecialty_contractor203/21/2026
Mabe GroupGeneral Contractor107/08/2026
A. M. Plumbing CompanyPlumbing107/08/2026
S & J IndustrialFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616701/16/2026
Building Lifecycle
11/05/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01478965-I1
11/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/25/2026
Engineers report requested due to facade in state of disrepair.
DOB violation · open
08/25/2026
At time of inspection observed facade in state of disrepair ,at exp.#1 cracks at multiple locations., repair and/replace
ECB violation · open
86 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & J Industrial02/03/2025
DOB NOWMechanical SystemsSigned-offAB Builders NY01/22/2025
DOB NOWGeneral ConstructionPermit IssuedAB Builders NY10/08/2024
DOB NOWPlumbingSigned-offA. M. Plumbing Company09/27/2024
1 project · most recent 01/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
01/16/2026Signed-offAB Builders NYHeating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteS&R Electrical—
02/25/2025CompleteS&R ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
11/05/2026Tenant Protection Plan Compliance—special
11/05/2026Structural Stability – Alterations of existing buildings—special
02/11/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
02/11/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/11/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/11/2026MeteringFAHAD FATEHenergy_progress
02/11/2026Interior lighting powerFAHAD FATEHenergy_progress
02/11/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/11/2026Maintenance informationFAHAD FATEHenergy_progress
02/11/2026Fenestration areasFAHAD FATEHenergy_progress
02/11/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
02/11/2026Permanent certificateFAHAD FATEHenergy_progress
02/11/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/11/2026Fenestration air leakageFAHAD FATEHenergy_progress
02/11/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/11/2026Structural Stability – Alterations of existing buildings—special
12/31/2025Structural Stability – Alterations of existing buildings—special
10/28/2025MeteringFAHAD FATEHenergy_progress
10/28/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
10/28/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/28/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
10/28/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/28/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/28/2025Interior lighting powerFAHAD FATEHenergy_progress
10/28/2025Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 66.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account