← Back
One family attached or semi-detached
2715 GRAVESEND NECK ROAD
BROOKLYN · BIN 3254181
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4Zoning
2,190 sfGross Floor Area
1Units
One family attached or semi-detached · 1,300 sf lot · 1.68 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2021$768K—Private party → Private party$351/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LI ARCHITECT ASSOCIATE, PLLC105/20/2025
Building Lifecycle
All (81)Filed (1)Objection (59)Special Inspection (21)
07/29/2026
Objection raised — Zoning
07/21/2026
Objection raised — Other
07/21/2026
Objection resolved — Addressed
07/20/2026
Objection raised — Admin
07/20/2026
Objection resolved — Addressed
07/09/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Admin
06/25/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Admin
06/19/2026
Objection resolved — Addressed
12/01/2025
Objection raised — Admin
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Fire_Protection
10/14/2025
Objection raised — Structural
10/03/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Zoning
05/30/2025
Objection raised — Zoning
05/30/2025
Objection raised — Plumbing
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Fire_Protection
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Zoning
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Fire_Protection
05/30/2025
Objection raised — Fire_Protection
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Fire_Protection
05/20/2025
Filed — Alteration CO
Converting existing one family to two family with Horizontal Enlargement. Obtain new C of O.
B01227416-I1
Latest 60 of 81 events.
Nothing on file for this building.
1 project · most recent 05/20/2025
FiledStatusContractorScope
05/20/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/16/2025Concrete - Cast-In-Place—special
05/16/2025Fire-Resistant Penetrations and Joints—special
05/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/16/2025Structural Stability – Alterations of existing buildings—special
05/16/2025Subgrade Inspections—special
05/16/2025Energy Code Compliance Inspections—progress
05/16/2025Fire-Resistance Rated Construction—progress
05/16/2025Final—progress
05/16/2025Footing and Foundation—progress
05/16/2025HVAC-R and service water piping design and insulation—energy_progress
05/16/2025Fenestration and door U-factor and product ratings—energy_progress
05/16/2025Maintenance information—energy_progress
05/16/2025Insulation placement and R values—energy_progress
05/16/2025HVAC-R and service water heating equipment—energy_progress
05/16/2025Lighting in dwelling units—energy_progress
05/16/2025Metering—energy_progress
05/16/2025HVAC-R and service water heating system controls—energy_progress
05/16/2025Electric vehicle service equipment requirements—energy_progress
05/16/2025Permanent certificate—energy_progress
05/16/2025Fenestration air leakage—energy_progress
05/16/2025Air barrier - visual inspection—energy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01227416-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B01227416-I1Open ↗
08/13/2026B01227416-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01227416-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01227416-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01227416-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01227416-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/21/2026B01227416-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01227416-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01227416-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01227416-I1Open ↗