← Back
BuildNYC
Two family brick
2715 WALLACE AVENUE
BRONX · BIN 2053693
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,680 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Two family brick · 2,500 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte111/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patriot Energy Solutions203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Patriot Energy Sol CoGeneral Contractor303/21/2026
Mak Electrical ContractingElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116111/20/2024
Building Lifecycle
12/10/2024
Permit issued — Solar
X01140912-I1-SL
11/20/2024
Filed — Alteration
X01140912-I1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPatriot Energy Sol Co12/10/2024
1 project · most recent 03/20/2025
FiledStatusContractorScope
03/20/2025CompleteMak Electrical Contracting—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/12/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
11/12/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
11/12/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
11/12/2024FinalVYACHESLAV NECHAYEVprogress
11/12/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account