← Back
BuildNYC
Over six families without stores
272 EAST 237TH STREET
BRONX · BIN 2019148
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R5BZoning
—Gross Floor Area
17Units
48 Active Violations 47 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 272 Summit · 2.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
272 Summit203/22/2026
Summit Realty103/21/2026
Building Lifecycle
06/25/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE KITCHEN LOCATED AT APT D, 1st STORY,…
HPD violation · open
06/25/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BY METHOD OF PORCELINE ENAMEL FINISH IN THE BATHROOM LOCATED AT…
HPD violation · open
06/25/2026
§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT…
HPD violation · open
06/25/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED…
HPD violation · open
06/25/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM EAST…
HPD violation · open
207 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFBISSUEDG. Bauer03/25/1996
2 projects · most recent 06/01/2022
General Wiring
FiledStatusContractorScope
06/01/2022Permit IssuedAmerican Power ElectricGeneral Wiring
01/14/2022CompleteLightwire Electric—
Nothing on file for this building.
Nothing on file for this building.