← Back
BuildNYC
Elevator apt, semi-fireproof with stores
272 SOUTH 1ST STREET
BROOKLYN · BIN 3256384
💬 Discuss this project
2024Year Built
7Stories
D7Building Class
R6Zoning
19,576 sfGross Floor Area
17Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 272 South 1st · 4,000 sf lot · 4.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofYisroel Greenfeld Sunshine Plaza LLC36p · 3 filings · 20 docs
BulkheadNeedle beams and system beams installation7p · 2 filings · 20 docs
Floor 7Temporary platform installation39p · 2 filings · 20 docs
Floor 6Temporary platform installation38p · 2 filings · 20 docs
Floor 5Temporary platform installation64p · 2 filings · 20 docs
Floor 4Temporary platform installation67p · 2 filings · 20 docs
Floor 3Temporary platform installation69p · 2 filings · 20 docs
Floor 2Temporary platform installation66p · 2 filings · 20 docs
Floor 1Interior partition work, 1st floor commercial spaceUnder Construction71p · 3 filings · 20 docs
Cellar64p · 1 filing · 20 docs
Site & exteriorYisroel Greenfeld Sunshine Plaza LLC30p · 5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Smart Consulting NY707/08/2026
415 Manhattan203/21/2026
272 South 1st103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2023$4.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sierra Safety403/21/2026
YG Expediting1603/21/2026
Millennium Designs of New York303/21/2026
Lombardo Building Consultants103/21/2026
Millennium Designs303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Success DevelopersGeneral Contractor1710/07/2026
GWT EnterprisesScaffold707/08/2026
Success DevelopersScaffold407/08/2026
Edge Construction & ConcreteScaffold303/21/2026
M.R. Electrical ServiceElectrical103/22/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941303/24/2025
Skyline Rigging7880106/10/2024
Building Lifecycle
All (129)Filed (25)Permit Issued (22)Signed Off (15)Violation (7)Inspection (10)Objection (20)Special Inspection (30)
10/15/2026
Signed off — Alteration
Proposed interior partition work for the existing commercial space at the 1st floor.
B01426778-I1
10/06/2026
Permit issued — General Construction
B01426778-I1-GC
07/15/2026
Filed — Alteration
Proposed interior partition work for the existing commercial space at the 1st floor.
B01430733-I1
07/14/2026
Special inspection requirement — Final
07/13/2026
Filed — Alteration
Proposed interior partition work for the existing commercial space at the 1st floor.
B01426778-I1
04/08/2025
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S2
04/08/2025
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S1
03/24/2025
Filed — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-P6
03/12/2025
Objection resolved — Resolved
02/24/2025
Objection raised — Other
02/11/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Other
01/27/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
12/12/2024
Filed — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-P5
12/09/2024
Permit issued — General Construction
B00851344-I1-GC
12/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01063936-I1
09/26/2024
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S5
09/19/2024
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S6
08/28/2024
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S7
08/28/2024
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S4
08/26/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01004542-I1
08/16/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/14/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/09/2024
Special inspection requirement — Sprinkler Systems
Paul Raymond
08/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
08/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
08/07/2024
Special inspection requirement — Maintenance information
Paul Raymond
08/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
08/05/2024
Filed — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-P4
07/31/2024
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/30/2024
Filed — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-P3
07/29/2024
Signed off — Alteration
Installation of Construction Fence in Conjunction with NB #B00851344-I1
B00886121-I1
07/29/2024
Signed off — Alteration
Filing of engineer enclosure system in conjunction with new building, in compliance with 3309.17
B00940680-I1
07/29/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01004556-I1
07/23/2024
Signed off — Alteration
Install pump jack scaffold
B01002367-I1
07/22/2024
Permit issued — Supported Scaffold
B01002367-I1-SF
07/15/2024
Special inspection requirement — Maintenance information
Paul Raymond
07/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
07/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
06/27/2024
Signed off — New Building
Plumbing work type filed in conjunction with NB#B00851344-I1
B00851344-S3
06/27/2024
Permit issued — Curb Cut
B00851344-S7-CC
06/26/2024
Permit issued — Protection and Mechanical Methods
B00940680-I1-PMM
06/25/2024
Signed off — Alteration
B00994339-I1
06/11/2024
Permit issued — Suspended Scaffold
B01063936-I1-SC
06/10/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01063936-I1
06/10/2024
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01004556-P1
06/10/2024
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
06/05/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers10/06/2026
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers12/09/2024
DOB NOWSupported ScaffoldSigned-offSuccess Developers07/22/2024
DOB NOWCurb CutSigned-offSuccess Developers06/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offSuccess Developers06/26/2024
DOB NOWSuspended ScaffoldSigned-offDoria06/11/2024
DOB NOWMechanical SystemsSigned-offSuccess Developers05/29/2024
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers04/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offEdge Construction & Concr03/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT Enterprises02/28/2024
DOB NOWSidewalk ShedSigned-offGWT Enterprises02/14/2024
DOB NOWSidewalk ShedSigned-offGWT Enterprises02/14/2024
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers01/25/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating01/10/2024
DOB NOWSprinklersSigned-offAmb Mechanical01/09/2024
DOB NOWSupport of ExcavationSigned-offSuccess Developers12/14/2023
DOB NOWConstruction FenceSigned-offSuccess Developers12/13/2023
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers10/30/2023
DOB NOWEarth WorkSigned-offSuccess Developers10/19/2023
DOB NOWSupport of ExcavationSigned-offSuccess Developers10/19/2023
DOB NOWStructuralSigned-offSuccess Developers10/18/2023
DOB NOWConstruction FenceSigned-offSuccess Developers08/23/2023
1 project · most recent 03/24/2025
Storm Water/Sanitary
FiledStatusContractorScope
03/24/2025Signed-offPrime Piping & HeatingStorm, Water/Sanitary
3 projects · most recent 09/17/2024
General Wiring
FiledStatusContractorScope
09/17/2024CompleteM.R. Electrical ServiceGeneral Wiring
05/17/2024CompletePower Direct Electric—
02/08/2024CompleteSolas Electrical—
1 project · most recent 03/24/2025
Concrete
FiledStatusContractorScope
03/24/2025Permit IssuedSuccess DevelopersConcrete
1 project · most recent 03/24/2025
Earthwork
FiledStatusContractorScope
03/24/2025Permit IssuedSuccess DevelopersEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/16/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - UndergroundPassView ↗
01/22/2024Pass-Final PL - UndergroundPassView ↗
01/17/2024Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
07/14/2026Final—progress
08/09/2024Sprinkler SystemsPaul Raymondspecial
08/09/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/07/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
08/07/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
08/07/2024Maintenance informationPaul Raymondenergy_progress
08/07/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
08/07/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/07/2024Energy Code Compliance InspectionsPaul Raymondprogress
07/31/2024Sprinkler SystemsPaul Raymondspecial
07/31/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/15/2024Maintenance informationPaul Raymondenergy_progress
07/15/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
07/15/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
07/15/2024Energy Code Compliance InspectionsPaul Raymondprogress
07/15/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/15/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
06/10/2024Post-installed AnchorsZELJKO STEVANOVICspecial
01/04/2024Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
01/04/2024Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
01/04/2024Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
01/04/2024Concrete - Cast-In-PlacePaul Raymondspecial
01/04/2024Subgrade InspectionsPaul Raymondspecial
01/02/2024Concrete - Cast-In-PlacePaul Raymondspecial
01/02/2024Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
Latest 25 of 53.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/27/2026B00886121-P1Request digital key ↗
08/26/2026B00940680-I1Request digital key ↗
08/26/2026B01004542-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/14/2023340896579Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/18/2023340896579Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00851344-I1Open ↗
08/13/2026B00851344-P6Open ↗
08/13/2026B00851344-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00851344-P6Open ↗
08/13/2026B00851344-P5Open ↗
08/13/2026B00851344-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00851344-I1Open ↗
▸Seals & Professional Certifications79
▸DOB NOWSpecial Inspector Seal & Signature30
09/26/2026B00851344-S2Open ↗
09/22/2026B00851344-S4Open ↗
09/22/2026B00851344-S4Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/27/2026B00886121-P1Open ↗
08/27/2026B00886121-I1Open ↗
08/26/2026B00940680-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/26/2026B00851344-S2Open ↗
09/22/2026B00851344-S4Open ↗
09/22/2026B00851344-S4Open ↗
Showing 3 of 22 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/18/2023340896579Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/18/2023340896579Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00851344-I1Open ↗
08/13/2026B00851344-P5Open ↗
08/13/2026B00851344-P6Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/24/2026B00851344-P6Open ↗
08/15/2026B00851344-I1Open ↗
08/14/2026B00851344-P5Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/26/2023340896579Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/14/2023340896579Open ↗
▸BISSTREET TREE CHECKLIST1
09/18/2023340896579Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00851344-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00851344-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00851344-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00851344-S5Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B00851344-P2Open ↗
08/13/2026B00851344-S3Open ↗
08/13/2026B00851344-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00851344-S3Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/30/2024340896579Open ↗
▸BISBPP - Forwarding Letter to DEP1
11/14/2023340896579Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/18/2023340896579Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/14/2023340896579Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026B00851344-P6Open ↗
08/13/2026B00851344-P5Open ↗
08/13/2026B00851344-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00851344-P6Open ↗
08/13/2026B00851344-I1Open ↗
08/13/2026B00851344-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026B00851344-P6Open ↗
08/15/2026B00851344-I1Open ↗
08/14/2026B00851344-P5Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00851344-S3Open ↗
08/13/2026B00851344-S1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/26/2023340896579Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00851344-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01063936-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01063936-I1Open ↗