Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofYisroel Greenfeld Sunshine Plaza LLC36p · 3 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 3 drawing sheets
Filing of engineer enclosure system in conjunction with new building, in compliance with 3309.17
On file for this project
2 documents · 1 drawing sheet
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
BulkheadNeedle beams and system beams installation7p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 7 drawing sheets
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Floor 7Temporary platform installation39p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 7 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 6Temporary platform installation38p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 6 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 5Temporary platform installation64p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 7 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 4Temporary platform installation67p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 6 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 3Temporary platform installation69p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 8 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 2Temporary platform installation66p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 5 drawing sheets
Application for the installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.
On file for this project
2 documents
Floor 1Interior partition work, 1st floor commercial spaceUnder Construction71p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Curb Cut · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed interior partition work for the existing commercial space at the 1st floor.
On file for this project
2 documents · 1 drawing sheet
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 5 drawing sheets
Proposed interior partition work for the existing commercial space at the 1st floor.
On file for this project
2 documents · 3 drawing sheets
Cellar64p · 1 filing · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Earth Work · General Construction · Mechanical Systems · Plumbing · Sprinklers · Support of Excavation
Structural work type filed in conjunction with NB #B00851344-I1
On file for this project
112 documents · 5 drawing sheets
Site & exteriorYisroel Greenfeld Sunshine Plaza LLC30p · 5 filings · 14 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Install pump jack scaffold
On file for this project
2 documents · 7 drawing sheets
Filing of engineer enclosure system in conjunction with new building, in compliance with 3309.17
On file for this project
2 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.