← Back
Public elementary, junior or senior high
Kipp Bronx Charter School II
2720 JEROME AVENUE · BIN 2129749
💬 Discuss this project
2021Year Built
6Stories
W1Building Class
R8Zoning
94,388 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Public elementary, junior or senior high · Owner of record: JEROME 2720, LLC · 22,112 sf lot · 4.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof12p · 8 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 62p · 2 filings · 8 docs
Floor 51p · 1 filing · 3 docs
Floor 41p · 1 filing · 3 docs
Floor 32p · 2 filings · 8 docs
Floor 24p · 4 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar7p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEROME 2720703/22/2026
KIPP 2720 SCHOOL203/22/2026
ALBA SERVICES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2020$12.8M—2720 JEROME AVENUE INC. → JEROME 2720, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.5103/21/2026
A1 EXPEDITING SERVICE1803/21/2026
HOWARD I SHAPIRO ASSOCIATES1003/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARVEL ARCHITECTSGeneral Contractor503/22/2026
MFS CONSULTING ENGINEERSGeneral Contractor403/22/2026
SUFFOLK CONSTRUCTION COMPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2542509/23/2024
Building Lifecycle
All (196)Filed (51)Permit Issued (1)Signed Off (22)Violation (14)Objection (78)Special Inspection (30)
09/07/2025
Signed off — Alteration
X01051959-I1
02/07/2025
Signed off — Alteration
Install Boilers as per plans filed. No change to use, egress, or occupancy.
X00503492-I1
01/29/2025
Signed off — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB #210182345.
X00459198-I1
12/09/2024
Signed off — Alteration
Mechanical work as per plans filed. Filed in conjunction with NB #210182345.
X00459141-I1
12/02/2024
Signed off — Alteration
APPLICATION FILED TO ADD EUP NUMBERS IN SCOPE OF WORK. FILED IN CONJUNCTION WITH MS JOB # X00459141 AND NB #210182345.
X01107095-I1
10/25/2024
Permit issued — Mechanical Systems
X01107095-I1-MS
09/23/2024
Filed — Alteration
APPLICATION FILED TO ADD EUP NUMBERS IN SCOPE OF WORK. FILED IN CONJUNCTION WITH MS JOB # X00459141 AND NB #210182345.
X01107095-I1
08/15/2024
Special inspection requirement — Public Assembly Emergency Lighting
MAURICIO ANDRADE
08/02/2024
Filed — No Work
X08037464-P1
08/02/2024
Filed — No Work
X08037420-P1
07/29/2024
Special inspection requirement — Public Assembly Emergency Lighting
MAURICIO ANDRADE
07/17/2024
Signed off — Alteration
Use of mini crane as per plans submitted herewith. Plans are filed in conjunction with NB#210182345
X08005459-I1
05/16/2024
Filed — Alteration
X01051959-I1
05/15/2024
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Exterior lighting power
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Lighting controls
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Final
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Sprayed fire-resistant materials
MAURICIO ANDRADE
05/15/2024
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
05/03/2024
Objection raised — Scope
05/03/2024
Objection raised — Inspections
04/24/2024
Filed — Alteration
Alteration to provide additional supports for netting at 3rd floor play terrace, as per plans filed.
X01037764-I1
04/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
04/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
04/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/10/2024
Objection raised — Other
04/10/2024
Objection resolved — Addressed
03/29/2024
Filed — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB #210182345.
X00459198-P3
01/30/2024
Signed off — Alteration
Install temporary construction fence as per plans filed. No change to use, egress or occupancy.Filed in conjunction with NB#210182345
X00540484-I1
12/13/2023
Signed off — Alteration
Install standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#210182345
X00541196-I1
12/07/2023
Signed off — Alteration
X00467960-I1
12/07/2023
Signed off — Alteration
Provide support of excavation (SOE) as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# 210182345.
X00453699-S2
11/27/2023
Signed off — Alteration
Fuel storage tank and associated piping for an emergency generator. No change in occupancy, use or egress. Filed in conjunction with NB #210182345.
X00554919-I1
11/27/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB #210182345
X00548902-I1
11/27/2023
Signed off — Alteration
Fuel storage tank and associated piping for an emergency generator. No change in occupancy, use or egress. Filed in conjunction with NB #210182345.
X00554919-S1
10/27/2023
Signed off — Alteration
X00667683-I1
10/27/2023
Signed off — Alteration
INSTALLATION OF SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
X00698060-I1
10/27/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00633103-I1
08/29/2023
Filed — No Work
X08037605-P1
08/23/2023
Signed off — Alteration
X00464143-I1
08/16/2023
Signed off — Alteration
Temporary installation of supported scaffold as per plans filed herewith. This application is filed in conjunction with NB-210182345.
X00614576-I1
07/27/2023
Signed off — Alteration
Structural work as per plans filed.
X00450823-I1
07/27/2023
Signed off — Alteration
Provide support of excavation (SOE) as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# 210182345.
X00453699-I1
07/25/2023
Signed off — Alteration
Provide support of excavation (SOE) as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# 210182345.
X00453699-S1
07/11/2023
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
07/03/2023
Filed — Alteration
Install Boilers as per plans filed. No change to use, egress, or occupancy.
X00503492-P3
06/30/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00630952-I1
06/30/2023
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MAURICIO ANDRADE
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUFFOLK CONSTRUCTION COMP10/25/2024
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP09/05/2023
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP04/19/2023
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP05/04/2022
BIS—RE-ISSUEDSUFFOLK CONSTRUCTION COMP05/04/2022
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP12/16/2021
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP12/16/2021
13 projects · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024CompleteLOWY & DONNATH INC.—
03/15/2024CompleteLOWY & DONNATH INC.General Wiring
02/23/2024CompleteLOWY & DONNATH INC.General Wiring
11/08/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
08/31/2023CompleteLOWY & DONNATH INC.General Wiring
08/24/2023CompleteLOWY & DONNATH INC.General Wiring
08/22/2023CompleteLOWY & DONNATH INC.—
08/17/2023CancelledLOWY & DONNATH INC.General Wiring
08/04/2023CompleteLOWY & DONNATH INC.General Wiring
08/04/2023CompleteLOWY & DONNATH INC.General Wiring
07/31/2023CancelledLOWY & DONNATH INC.General Wiring
03/31/2023CompleteLOWY & DONNATH INC.—
04/13/2022CompleteLOWY & DONNATH INC.—
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
08/15/2024Public Assembly Emergency LightingMAURICIO ANDRADEprogress
07/29/2024Public Assembly Emergency LightingMAURICIO ANDRADEprogress
05/15/2024Structural Steel - WeldingMAURICIO ANDRADEspecial
05/15/2024FinalMAURICIO ANDRADEprogress
05/15/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/15/2024Post-installed AnchorsMAURICIO ANDRADEspecial
05/15/2024Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
05/15/2024Structural Steel - DetailsMAURICIO ANDRADEspecial
05/15/2024Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
05/15/2024Maintenance informationMAURICIO ANDRADEenergy_progress
05/15/2024Lighting controlsMAURICIO ANDRADEenergy_progress
05/15/2024Exterior lighting powerMAURICIO ANDRADEenergy_progress
04/11/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
04/11/2024HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
04/11/2024HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
07/11/2023Heating SystemsMAURICIO ANDRADEspecial
06/30/2023Heating SystemsMAURICIO ANDRADEspecial
06/16/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMAURICIO ANDRADEspecial
06/05/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMAURICIO ANDRADEspecial
05/31/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMAURICIO ANDRADEspecial
05/30/2023Electrical motors and elevatorsMAURICIO ANDRADEenergy_progress
05/30/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
05/30/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
05/30/2023Emergency and Standby Power Systems (Generator)MAURICIO ANDRADEspecial
05/30/2023Chimneys and ventsMAURICIO ANDRADEspecial
Latest 25 of 93.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
KippEducationCellar, Floors 1–6, Roof
Project X08037605 No Work · PA Certificate of Operation Issued · 11/28/2022
Project X00459198 Alteration · LOC Issued · 02/18/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 328 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch33
08/25/2026X00453699-S1Request digital key ↗
08/25/2026X00633103-I1Request digital key ↗
08/25/2026X00633103-P2Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
08/23/2026X08037605-P1Request digital key ↗
08/23/2026X08037605-I1Request digital key ↗
08/21/2026X08037464-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00459198-I1Request digital key ↗
08/25/2026X00459198-P2Request digital key ↗
08/15/2026X00459198-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/23/2026X00459141-P2Request digital key ↗
08/15/2026X00459141-P1Request digital key ↗
08/14/2026X00459141-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation2
08/25/2026X00453699-P1Request digital key ↗
08/15/2026X00453699-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/25/2026X00467960-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026X00464143-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026X00450823-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION15
01/21/2026210182345Open ↗
08/01/2024210182345Open ↗
03/05/2024240300456Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
05/06/2022210182345Open ↗
05/06/2022210182345Open ↗
05/05/2022210182345Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
12/20/2024240300456Open ↗
08/25/2023240300456Open ↗
03/02/2022240300456Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/25/2023210182345Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00453699-P1Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/12/2021210182345Open ↗
▸BISZONING DIAGRAM1
06/30/2021210182345Open ↗
▸Seals & Professional Certifications89
▸DOB NOWDPL-1: Design Professional Seal & Signature51
08/25/2026X00464143-I1Open ↗
08/25/2026X00459198-P1Open ↗
08/25/2026X00459198-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/30/2026X00548902-P2Open ↗
09/23/2026X00503492-I1Open ↗
09/23/2026X00614576-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026X00453699-P1Open ↗
09/01/2026X00450823-I1Open ↗
08/29/2026X00459198-P1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/19/2021240300456Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/19/2021240300456Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/10/2021210182345Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
06/24/2021210182345Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
06/24/2021210182345Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
01/29/2025240300456Open ↗
03/10/2022240300456Open ↗
08/12/2021210182345Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
02/16/2022240300456Open ↗
12/10/2021210182345Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/02/2022240300456Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/10/2021210182345Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/22/2023210182345Open ↗
10/04/2021210182345Open ↗
08/12/2021210182345Open ↗
Showing 3 of 4 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
12/23/2024210182345Open ↗
08/23/2023210182345Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00459141-I1Open ↗
08/13/2026X00459198-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2023210182345Open ↗
▸BISFENESTRATION AREAS1
08/22/2023210182345Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/22/2023210182345Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/22/2023210182345Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/10/2021210182345Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/22/2023210182345Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/22/2023210182345Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00503492-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/22/2023210182345Open ↗
10/04/2021210182345Open ↗
08/12/2021210182345Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
08/24/2021210182345Open ↗
06/24/2021210182345Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
08/22/2023210182345Open ↗
08/22/2023210182345Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/22/2023210182345Open ↗
▸BISMASONRY1
08/22/2023210182345Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
08/22/2023210182345Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
08/22/2023210182345Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
12/10/2021210182345Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/10/2021210182345Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
08/15/2023210182345Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/23/2023210182345Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/11/2025240300456Open ↗
▸Approvals, Objections & Sign-offs67
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter49
08/25/2026X00614576-I1Open ↗
08/25/2026X00614576-P1Open ↗
08/25/2026X00614576-P3Open ↗
Showing 3 of 49 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/22/2022210182345Open ↗
12/22/2022210182345Open ↗
12/16/2021210182345Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER4
05/05/2022210182345Open ↗
05/05/2022210182345Open ↗
05/05/2022210182345Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
04/14/2023210182345Open ↗
04/10/2023210182345Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
03/02/2022240300456Open ↗
08/12/2021210182345Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/12/2023210182345Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/16/2021210182345Open ↗
12/10/2021210182345Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION17
12/20/2024240300456Open ↗
08/27/2024210182345Open ↗
09/20/2023210182345Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM2
05/05/2022210182345Open ↗
12/10/2021210182345Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/19/2021240300456Open ↗
▸Other Documents20
▸DOB NOWAlternate Plan 14
08/21/2026X08037464-P1Open ↗
08/21/2026X08037464-I1Open ↗
08/21/2026X08037420-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00467960-I1Open ↗
08/13/2026X00453699-S2Open ↗
08/13/2026X00453699-S1Open ↗
▸DOB NOWAlternate Plan 22
08/21/2026X08037420-P1Open ↗
08/21/2026X08037420-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026X00453699-P1Open ↗
08/13/2026X00453699-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/16/2022240300456Open ↗
▸BISTCO - Supporting Documents1
08/25/2023210182345Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/22/2023210182345Open ↗
▸BISPLOT DIAGRAM1
08/12/2021210182345Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/29/2025240300456Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
08/22/2023210182345Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
02/16/2022240300456Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/30/2021210182345Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
01/29/2025240300456Open ↗