Elevator apt, semi-fireproof with stores
2721 COLDEN AVENUE
BRONX · Allerton · BIN 2053834
💬 Discuss this project
2023Year Built
8Stories
D7Building Class
R7AZoning
41,358 sfGross Floor Area
46Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 2712 RADCLIFF YATES REALTY LLC · 8,700 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof5p · 3 filings · 6 docs
Bulkhead1p · 1 filing · 20 docs
Floor 21p · 1 filing
Floor 15p · 4 filings
Cellar3 filings
Site & exterior4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2712 RADCLIFF YATES REALTY8807/08/2026
OWNERS REP1607/08/2026
J PILLA GROUP603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS1003/21/2026
GEORGE E BERGER ASS803/21/2026
AE DESIGN SOLUTION1203/21/2026
EUROCELT EXPEDITING, INC1003/21/2026
S R SOLAR DESIGN203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE J. PILLA GROUP LTDGeneral Contractor2607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1507/08/2026
K&E BUILDERS INCGeneral Contractor1007/08/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
GO PRO FIRE PROTECTION CFire Protection207/08/2026
MJ GENERAL MECHANICAL LLCPlumbing107/08/2026
RELIANT ELEC'L CONT'G INCElectrical103/22/2026
RICHARD VITTOElectrical103/21/2026
SEA BRIGHT SOLAR LLCGeneral Contractor107/08/2026
AMBER ELECTL CONTNG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641105/28/2025
NKM ENGINEERING PLLC6244105/21/2025
Building Lifecycle
All (203)Filed (28)Permit Issued (31)Signed Off (15)Violation (22)Inspection (13)Objection (58)Special Inspection (30)Tax Incentive (6)
06/15/2026
421-a(16) construction completed
07/31/2025
Signed off — Alteration
Sprinkler/Standpipe system in conjunction with New Building #210181569.
X00425215-I1
07/31/2025
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEM IN CONJUNCTION WITH NEW BUILDING - 210181569.
X00425209-I1
07/31/2025
Signed off — Alteration
Plumbing filed in conjunction with New Building application #210181569.
X00425210-I1
07/07/2025
Signed off — Alteration
Installation of new curb cut in conjunction with New Building application job #210181569
X00591306-I1
07/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/20/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01228801-I1
06/12/2025
Permit issued — Solar
X01228801-I1-SL
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Special inspection requirement — Duct leakage testing
JUAN GOMEZ
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
06/04/2025
Special inspection requirement — Electrical energy consumption
JUAN GOMEZ
06/04/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
06/04/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
06/04/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
06/04/2025
Special inspection requirement — HVAC insulation and sealing
JUAN GOMEZ
06/04/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
06/04/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
06/04/2025
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
06/04/2025
Special inspection requirement — Final
JUAN GOMEZ
06/03/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
06/03/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
06/03/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
06/03/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JUAN GOMEZ
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
05/30/2025
Objection resolved — Addressed
05/28/2025
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEM IN CONJUNCTION WITH NEW BUILDING - 210181569.
X00425209-P2
05/28/2025
Objection raised — Cost
05/23/2025
Filed — Alteration
Plumbing filed in conjunction with New Building application #210181569.
X00425210-P3
05/21/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01228801-I1
05/20/2025
Special inspection requirement — Final
NARESH MAHANGU
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/20/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
05/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/18/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/15/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/15/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/15/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/11/2025
Signed off — Alteration
SUBSEQUENT APPLICATION FILED TO INCLUDE FOUNDATION WORK TYPE.
X00683137-I1
04/11/2025
Signed off — Alteration
STRUCTURAL WORK TYPE FILED IN ASSOCIATION WITH NB APPLICATION #210181569.
X00861146-I1
04/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/10/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/10/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
04/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JUAN GOMEZ
04/10/2025
Special inspection requirement — Final
JUAN GOMEZ
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
04/10/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
04/10/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
04/10/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
04/10/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
02/12/2025
Signed off — Alteration
Install Temporary Construction Site Fence under Demo Job # 220740296
X00602394-I1
01/31/2025
485-x construction completed
01/16/2025
Signed off — Alteration
X00702799-I1
01/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00701188-I1
01/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00702790-I1
01/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY FALL PROTECTION @ ELEVATOR SHAFT AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY FALL PROTECTION TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X00910702-I1
01/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X00910691-I1
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSEA BRIGHT SOLAR LLC06/12/2025
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD07/26/2024
DOB NOWMechanical SystemsSigned-offTHE J. PILLA GROUP LTD07/26/2024
DOB NOWSupported ScaffoldSigned-offK&E BUILDERS INC07/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offK&E BUILDERS INC07/22/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/13/2024
DOB NOWConstruction FenceSigned-offTHE J. PILLA GROUP LTD03/11/2024
DOB NOWStandpipeSigned-offGO PRO FIRE PROTECTION C01/29/2024
DOB NOWStandpipeSigned-offGO PRO FIRE PROTECTION C01/29/2024
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC10/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offK&E BUILDERS INC08/01/2023
DOB NOWSupported ScaffoldSigned-offK&E BUILDERS INC08/01/2023
DOB NOWMechanical SystemsSigned-offTHE J. PILLA GROUP LTD07/13/2023
DOB NOWCurb CutSigned-offTHE J. PILLA GROUP LTD07/13/2023
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD07/11/2023
DOB NOWFoundationSigned-offTHE J. PILLA GROUP LTD06/23/2023
DOB NOWConstruction FenceSigned-offTHE J. PILLA GROUP LTD04/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/20/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/20/2023
DOB NOWSupport of ExcavationSigned-offTHE J. PILLA GROUP LTD12/01/2022
DOB NOWFoundationSigned-offTHE J. PILLA GROUP LTD07/05/2022
DOB NOWSupport of ExcavationSigned-offTHE J. PILLA GROUP LTD06/16/2022
DOB NOWConstruction FenceSigned-offTHE J. PILLA GROUP LTD05/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/25/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/22/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP11/17/2021
DOB NOWConstruction FenceSigned-offTHE J. PILLA GROUP LTD10/13/2021
BIS—ISSUEDTHE J. PILLA GROUP LTD05/06/2025
BIS—ISSUEDTHE J. PILLA GROUP LTD10/15/2024
BIS—ISSUEDTHE J. PILLA GROUP LTD05/10/2024
BIS—ISSUEDTHE J. PILLA GROUP LTD09/15/2023
BIS—ISSUEDTHE J. PILLA GROUP LTD09/15/2023
BIS—ISSUEDTHE J. PILLA GROUP LTD08/10/2023
BIS—ISSUEDTHE J. PILLA GROUP LTD12/06/2021
BIS—ISSUEDP & P CONTRACTOR CORP.07/18/1990
6 projects · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteRELIANT ELEC'L CONT'G INCGeneral Wiring
12/08/2024CompleteAMBER ELECTL CONTNG INC—
03/19/2024CompleteTF ELECTRICAL CORPGeneral Wiring
06/27/2022CompleteRELIANT ELEC'L CONT'G INC1 meters, 1 new_meters
03/20/2022CompleteV. VASS ELECTRIC CORP—
11/18/2021CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/15/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/15/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
06/04/2025Mechanical SystemsJUAN GOMEZspecial
06/04/2025Electrical energy consumptionJUAN GOMEZenergy_progress
06/04/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
06/04/2025Maintenance informationJUAN GOMEZenergy_progress
06/04/2025Duct leakage testing JUAN GOMEZenergy_progress
06/04/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
06/04/2025Heating SystemsJUAN GOMEZspecial
06/04/2025Shutoff dampersJUAN GOMEZenergy_progress
06/04/2025FinalJUAN GOMEZprogress
06/04/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
06/04/2025HVAC insulation and sealing JUAN GOMEZenergy_progress
06/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJUAN GOMEZspecial
06/03/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
06/03/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
06/03/2025Maintenance informationJUAN GOMEZenergy_progress
06/03/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
05/20/2025FinalNARESH MAHANGUprogress
05/20/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/20/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/20/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/20/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/10/2025Electrical energy consumptionJUAN GOMEZenergy_progress
04/10/2025Heating SystemsJUAN GOMEZspecial
04/10/2025Mechanical SystemsJUAN GOMEZspecial
04/10/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
Latest 25 of 86.
▾Documents — 350 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch20
08/25/2026X00602394-I1Request digital key ↗
08/25/2026X00629499-I1Request digital key ↗
08/24/2026X00701188-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/24/2026X00425210-I1Request digital key ↗
08/15/2026X00425210-P1Request digital key ↗
08/14/2026X00425210-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/24/2026X00425209-P2Request digital key ↗
08/15/2026X00425209-I1Request digital key ↗
08/15/2026X00425209-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026X00425215-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/15/2026X00425215-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION39
11/14/2025210181569Open ↗
11/10/2025210181569Open ↗
10/31/2025210181569Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
07/14/2023210181569Open ↗
06/14/2022210181569Open ↗
06/14/2022210181569Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
09/25/2023210181569Open ↗
09/25/2023210181569Open ↗
09/25/2023210181569Open ↗
Showing 3 of 4 on file for this type
▸BISHPD: PERMIT NOTICE1
06/08/2022210181569Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
03/27/2023210181569Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
03/27/2023210181569Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
02/20/2025210181569Open ↗
06/14/2022210181569Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/24/2022210181569Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/13/2022210181569Open ↗
▸BISVERIFY TAX LOT1
06/26/2025210181569Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/09/2022210181569Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/14/2025210181569Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/13/2022210181569Open ↗
▸Seals & Professional Certifications115
▸DOB NOWSpecial Inspector Seal & Signature50
09/25/2026X00425209-I1Open ↗
09/25/2026X00425209-I1Open ↗
09/02/2026X00683589-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026X00425209-I1Open ↗
09/25/2026X00425209-I1Open ↗
09/25/2026X00425209-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026X00591306-I1Open ↗
08/24/2026X00701188-P1Open ↗
08/24/2026X00701188-P2Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/11/2021220740296Open ↗
10/29/2019220718533Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/27/2021240307761Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/27/2021240307761Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
05/16/2025210181569Open ↗
12/13/2022210181569Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/05/2025210181569Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/13/2022210181569Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/26/2024210181569Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/26/2024210181569Open ↗
▸Safety & Tenant Protection13
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
12/10/2021220740296Open ↗
08/11/2021220740296Open ↗
10/29/2019220718533Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/11/2023210181569Open ↗
09/16/2021240307761Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
07/11/2023210181569Open ↗
12/10/2021220740296Open ↗
▸BISSTREET TREE SIGNOFF2
06/10/2025240307761Open ↗
11/19/2024210181569Open ↗
▸BISSTREET TREE CHECKLIST2
06/08/2022210181569Open ↗
08/27/2021240307761Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/27/2021240307761Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/10/2021220740296Open ↗
▸Environmental & Asbestos20
▸DOB NOWOER: Notice to Proceed10
08/15/2026X00425209-P1Open ↗
08/15/2026X00425209-I1Open ↗
08/13/2026X00425210-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026X00425209-I1Open ↗
08/13/2026X00425210-I1Open ↗
08/13/2026X00861146-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/08/2022210181569Open ↗
08/27/2021240307761Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
07/31/2025240307761Open ↗
07/30/2025210181569Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/10/2021220740296Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/11/2023210181569Open ↗
12/13/2022210181569Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00425209-I1Open ↗
08/13/2026X00425210-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/09/2025210181569Open ↗
▸BISFENESTRATION AREAS1
07/09/2025210181569Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/14/2025210181569Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/09/2025210181569Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/09/2025210181569Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/09/2025210181569Open ↗
▸BISLIGHTING CONTROLS1
07/09/2025210181569Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/09/2025210181569Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/14/2023210181569Open ↗
12/13/2022210181569Open ↗
06/09/2022210181569Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/14/2025210181569Open ↗
03/27/2023210181569Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/09/2025210181569Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/09/2025210181569Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/09/2025210181569Open ↗
▸BISSOIL REPORT1
05/24/2022210181569Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/24/2022210181569Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE21
10/07/2025210181569Open ↗
09/16/2025210181569Open ↗
01/10/2025210181569Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
05/14/2025210181569Open ↗
05/14/2025210181569Open ↗
05/14/2025210181569Open ↗
Showing 3 of 8 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
05/16/2025210181569Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01228801-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE5
06/24/2025210181569Open ↗
06/26/2024210181569Open ↗
09/25/2023210181569Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT1
08/27/2021240307761Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION19
05/14/2025210181569Open ↗
05/14/2025210181569Open ↗
03/10/2025210181569Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM2
12/10/2021220740296Open ↗
12/10/2021220740296Open ↗
▸BISEFILING COVER SHEET2
08/11/2021220740296Open ↗
10/29/2019220718533Open ↗
▸Other Documents10
▸DOB NOWWaiver Document4
08/15/2026X00425209-I1Open ↗
08/13/2026X00425210-I1Open ↗
08/13/2026X00425210-P3Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/27/2021240307761Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/09/2025210181569Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/11/2021220740296Open ↗
▸BISPLOT DIAGRAM1
05/24/2022210181569Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
07/14/2025210181569Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00683589-I1Open ↗