← Back
BuildNYC
Condo, residential unit in walk-up building
White Beach Condominium
2724 SCHURZ AVENUE · BIN 2096855
💬 Discuss this project
1986Year Built
3.5Stories
R2Building Class
C3AZoning
60,253 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized27 Active Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: White Beach Condo & Marina · 96,250 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 2 filings · 12 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
White Beach Condominium & Marina203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pennaarchitect307/10/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wulfing ConstructionGeneral Contractor207/08/2026
New Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (30)Filed (3)Permit Issued (3)Signed Off (1)Violation (21)Special Inspection (2)
02/17/2026
Violation issued (FDNY_NOV, closed)
11/18/2025
Violation issued (HPD, closed)
I
06/12/2025
Violation issued (HPD, closed)
A
10/01/2024
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (HPD, open)
C
03/29/2023
Violation issued (HPD, closed)
A
01/17/2023
Violation issued (ECB, closed)
Construction
11/03/2022
Violation issued (HPD, closed)
I
06/26/2022
Violation issued (ECB, closed)
Construction
06/26/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
10/18/2021
Signed off — Alteration
INTERIOR RENOVATION OF APARTEMENT#H2 LOCATED AT 2ND FLOOR OF AN EXISTING APARTMENTS BUILDING , PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW JOB# X00493072 (GC) AS FOR PLANS SUBMITTED NOT CHANGE IN USE. EGRESSOR OCCUPANCY
X00493093-I1
07/10/2021
Filed — Alteration
Interior renovation of Apt#H2 located on the 2ndFl of an existing apart Building Replace Kitchen Cabinets wood floor bathrooms ceramic tiles plumbing fixtures & electric dryer filed in conjunction with JOB#X00493093 not change in use egress or occupancy
X00493072-P1
06/18/2021
Permit issued — General Construction
X00493072-I1-GC
06/18/2021
Violation issued (ECB, closed)
Construction
04/28/2021
Permit issued — Plumbing
X00493093-I1-PL
04/26/2021
Permit issued — General Construction
X00493072-I1-GC
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
04/13/2021
Filed — Alteration
INTERIOR RENOVATION OF APARTEMENT#H2 LOCATED AT 2ND FLOOR OF AN EXISTING APARTMENTS BUILDING , PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW JOB# X00493072 (GC) AS FOR PLANS SUBMITTED NOT CHANGE IN USE. EGRESSOR OCCUPANCY
X00493093-I1
04/13/2021
Special inspection requirement — Energy Code Compliance Inspections
GIULIANO PENNA
04/13/2021
Special inspection requirement — Maintenance information
GIULIANO PENNA
04/12/2021
Filed — Alteration
Interior renovation of Apt#H2 located on the 2ndFl of an existing apart Building Replace Kitchen Cabinets wood floor bathrooms ceramic tiles plumbing fixtures & electric dryer filed in conjunction with JOB#X00493093 not change in use egress or occupancy
X00493072-I1
11/23/2016
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
05/07/2012
Violation issued (ECB, closed)
Unknown
08/01/2000
Violation issued (HPD, open)
C
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWulfing Construction06/18/2021
DOB NOWPlumbingSigned-offNew Plumbing & Heating04/28/2021
DOB NOWGeneral ConstructionPermit IssuedWulfing Construction04/26/2021
2 projects · most recent 05/19/2021
General Wiring
FiledStatusContractorScope
05/19/2021CompleteKurt Ebinger Electric ConstructionGeneral Wiring
03/15/2021Permit IssuedDay Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/13/2021Energy Code Compliance InspectionsGIULIANO PENNAprogress
04/13/2021Maintenance informationGIULIANO PENNAenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026X00493093-I1Request digital key ↗
08/25/2026X00493072-I1Request digital key ↗
08/25/2026X00493072-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00493093-I1Open ↗
08/25/2026X00493072-I1Open ↗
08/25/2026X00493072-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X00493093-I1Open ↗
08/30/2026X00493093-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00493093-I1Open ↗
08/25/2026X00493072-I1Open ↗
08/25/2026X00493072-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00493093-I1Open ↗