← Back
BuildNYC
Two stories - detached, small or mid-size
2727 MORGAN AVENUE
BRONX · Pelham Gardens · BIN 2054434
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4Zoning
1,700 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstallation of solar panels on existing roof3p · 1 filing · 7 docs
BasementInstallation of solar panels on existing roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates108/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Voltair SolarGeneral Contractor303/21/2026
B.P. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244108/21/2024
Building Lifecycle
11/27/2024
Signed off — Alteration
X01088307-I1
08/28/2024
Permit issued — Solar
X01088307-I1-SL
08/21/2024
Filed — Alteration
X01088307-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offVoltair Solar08/28/2024
2 projects · most recent 11/05/2024
FiledStatusContractorScope
11/05/2024CompleteB.P. Electric—
08/22/2024CancelledB.P. Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/30/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/30/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/30/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/30/2024FinalNARESH MAHANGUprogress
07/30/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account