← Back
Elevator cooperative
Highpoint on the Hudson
2727 PALISADE AVENUE · BIN 2083473
💬 Discuss this project
1955Year Built
10Stories
D4Building Class
R6Zoning
194,730 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: HIGHPOINT ON THE HUDSON OWNERS CORP · 108,150 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 16Under Construction7p · 1 filing · 20 docs
Floor 151p · 2 filings · 10 docs
Floor 14
Floor 13
Floor 12
Floor 11Under Construction2p · 1 filing · 9 docs
Floor 102p · 1 filing · 18 docs
Floor 92p · 1 filing · 11 docs
Floor 85p · 1 filing · 5 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GARTHCHESTER REALTY ASSOCIATES507/08/2026
RELIABLE ENTERPRISES607/08/2026
HUDSONCREST PROPERTIES INC.503/22/2026
STILLMAN MANAGEMENT303/22/2026
MAKAJ MANAGEMENT103/22/2026
HIGHPOINT ON HUDSON OWNERS2403/21/2026
GOODMAN MANAGEMENT603/21/2026
HIGH POINT OF HUDSON OWNERS IN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES403/21/2026
JOSEPH FELLNER403/21/2026
GARDEN STATE OF NJ DATA RECOVERY103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
PONDOSA DESIGN INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G N AMERICAN CONSTRUCTIONGeneral Contractor907/08/2026
ART + 1, INCGeneral Contractor707/08/2026
HUDSON PLMBING & MCH, LLCPlumbing507/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
ASTRO ELECL CONTNG INCElectrical203/22/2026
GOTHAM WIRING LICENSEDElectrical203/22/2026
2A MECHANICAL, INCGeneral Contractor203/21/2026
FANUKA INCGeneral Contractor207/08/2026
ADVANCED PLBG, MECH & SPRFire Protection107/08/2026
111 STARLIGHT CONTRACTINGGeneral Contractor107/08/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
MAZUR, MAREKElectrical103/21/2026
S. TIEGER PLBG. CO., INCPlumbing107/02/2026
GARDEN STATE OF NJ DATA*General Contractor107/08/2026
MANFREDINI, NICHOLASElectrical103/21/2026
JOSEPH NOTOElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
EVS ELECTRIC CORPElectrical103/22/2026
NOTO JOSEPHElectrical103/21/2026
SYLWESTER GOCHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GORDON KAHN PROFESSIONAL3212104/08/2026
JACK GREEN ASSOCIATES422104/08/2026
NEXUS INSPECTIONS AND TES9686203/27/2026
BUILDTECH ENGINEERING6369204/10/2025
PLUS355 INTEGRATED SOLUTI9026104/28/2024
D.R.HAMMERMAN, ARCHITECT6334205/23/2023
NY RESTORATION TECHNOLOGY6187101/12/2023
UNI-D7898111/15/2022
ASIF JAMIL R.A.7506102/26/2021
Building Lifecycle
All (179)Filed (22)Permit Issued (24)Signed Off (12)Facade (FISP) (15)Violation (52)Inspection (16)Objection (8)Special Inspection (30)
07/20/2026
Signed off — Alteration
X01335776-I1
06/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2026
Permit issued — Plumbing
X01360083-S1-PL
04/27/2026
Permit issued — General Construction
X01360083-I1-GC
04/10/2026
Permit issued — General Construction
X01369551-I1-GC
04/10/2026
Permit issued — General Construction
X01369551-I1-MS
04/08/2026
Filed — Alteration
INSTALLATION OF VARIABLE REFRIGERANT FLOW (VRF) HVAC SYSTEM SERVING APT 11-EF INCLUDING MINOR PARTITION WORK, NEW DROPPED CEILINGS AND SOFFITS TO ACCOMODATE NEW LIGHTING.
X01369551-I1
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
03/27/2026
Filed — Alteration
Interior non-structural cosmetic renovation of unit 16AB including bathroom, walk-in closet, new bar, and new mini-split units. No change in use, occupancy, or egress
X01360083-S1
03/27/2026
Filed — Alteration
Interior non-structural cosmetic renovation of unit 16AB including bathroom, walk-in closet, new bar, and new mini-split units. No change in use, occupancy, or egress
X01360083-I1
03/11/2026
Special inspection requirement — Post-installed Anchors
Gordon Kahn
03/11/2026
Special inspection requirement — Lighting in dwelling units
Gordon Kahn
03/11/2026
Special inspection requirement — Maintenance information
LAWRENCE GREEN
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gordon Kahn
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE GREEN
03/09/2026
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
03/09/2026
Special inspection requirement — Final
Gordon Kahn
03/05/2026
Cycle 10 facade report signed — SAFE
02/27/2026
Cycle 10 facade report submitted
02/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Nickolas Batis
02/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Nickolas Batis
02/15/2026
Special inspection requirement — Maintenance information
Nickolas Batis
02/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Nickolas Batis
02/15/2026
Special inspection requirement — Lighting in dwelling units
Nickolas Batis
02/15/2026
Special inspection requirement — Interior lighting power
Nickolas Batis
02/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Junda Qiu
02/15/2026
Special inspection requirement — Lighting controls
Nickolas Batis
02/13/2026
Special inspection requirement — Final
Nickolas Batis
02/13/2026
Special inspection requirement — Mechanical Systems
Junda Qiu
01/19/2026
Cycle 10 facade inspection completed
01/02/2026
Permit issued — Suspended Scaffold
X01335776-I1-SC
12/24/2025
Filed — Alteration
X01335776-I1
12/17/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH THE RENOVATION OF UNIT 15FG.
X00936953-S2
12/17/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH THE RENOVATION OF UNIT 15FG.
X00936953-I1
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2025
Signed off — Alteration
MATERIAL HOIST
X01239364-I1
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2025
Permit issued — Suspended Scaffold
X01239364-I1-SC
06/16/2025
Objection resolved — Addressed
06/12/2025
Filed — Alteration
MATERIAL HOIST
X01239364-I1
06/12/2025
Objection raised — Structural
05/19/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Other
05/12/2025
Objection resolved — Addressed
04/23/2025
Objection raised — Other
04/10/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH THE RENOVATION OF UNIT 15FG.
X00936953-P1
02/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Erich schoenenberger
02/21/2025
Special inspection requirement — Final
Erich schoenenberger
02/21/2025
Special inspection requirement — Lighting in dwelling units
Erich schoenenberger
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
07/18/2024
Permit issued — Mechanical Systems
X00936953-S2-MS
04/28/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH THE RENOVATION OF UNIT 15FG.
X00936953-S2
04/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Erich schoenenberger
04/28/2024
Special inspection requirement — Maintenance information
Erich schoenenberger
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Erich schoenenberger
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Erich schoenenberger
04/08/2024
Signed off — Alteration
X00829026-I1
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedS. TIEGER PLBG. CO., INC04/27/2026
DOB NOWGeneral ConstructionPermit Issued111 STARLIGHT CONTRACTING04/27/2026
DOB NOWGeneral ConstructionPermit IssuedFANUKA04/10/2026
DOB NOWGeneral ConstructionPermit IssuedFANUKA INC04/10/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S01/02/2026
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC06/16/2025
DOB NOWMechanical SystemsSigned-off2A MECHANICAL, INC07/18/2024
DOB NOWMechanical SystemsSigned-offART + 1, INC04/05/2024
DOB NOWGeneral ConstructionSigned-offG N AMERICAN CONSTRUCTION03/19/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/15/2024
DOB NOWGeneral ConstructionSigned-offG N AMERICAN CONSTRUCTION10/19/2023
DOB NOWGeneral ConstructionSigned-offART + 1, INC10/11/2023
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP06/12/2023
DOB NOWGeneral ConstructionSigned-offART + 1, INC06/09/2023
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC05/26/2023
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR01/19/2023
DOB NOWGeneral ConstructionPermit IssuedGARDEN STATE OF NJ DATA*11/21/2022
DOB NOWGeneral ConstructionSigned-offG N AMERICAN CONSTRUCTION07/19/2021
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC07/19/2021
DOB NOWGeneral ConstructionSigned-offG N AMERICAN CONSTRUCTION06/24/2021
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC06/22/2021
DOB NOWGeneral ConstructionSigned-offG N AMERICAN CONSTRUCTION04/27/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/31/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/03/2020
BISOTISSUEDFUTURA BUILDERS GROUP INC.02/05/2021
BISPLISSUEDL&J PLG & HTG CO OF NY IN12/18/2020
BISOTISSUEDFUTURA BUILDERS GROUP INC.07/15/2020
BISOTISSUEDG N AMERICAN CONSTRUCTION03/23/2020
BISOTISSUEDG N AMERICAN CONSTRUCTION01/17/2019
BISOTISSUEDG N AMERICAN CONSTRUCTION09/26/2018
BISOTISSUEDTOP HAT SOLUTIONS CORP08/16/2018
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC05/23/2014
BISFBISSUEDRICHARD MORTMAN05/23/2014
BISEQISSUEDEM & EM CHIMNEY AND MASON12/16/2013
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC11/15/2013
BISBLISSUEDNAT'L MECH. SVCS PLBG LLC11/15/2013
BISPLISSUEDVOKA MECHANICAL CORP07/12/2012
BISOTISSUEDALEKS & F., INC07/02/2012
BISMHISSUEDALEKS & F., INC07/02/2012
BISPLISSUEDYOST&CAMPBELL OFROCKLAND05/10/2012
+ 27 more permits on file
3 projects · most recent 04/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Permit IssuedFANUKA INCHeating and Air Conditioning Systems
Heat / Cool
Lg LG CONDENSER #ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×1
03/27/2026Permit Issued111 STARLIGHT CONTRACTINGHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric Mitsubishi MXZ-SM60NL w/ Mitsubishi PKFY-L08/12/18NLMU-A 60,000 BTU · Vrf Outdoor ×1
04/10/2025Signed-off2A MECHANICAL, INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA3 36,000 BTU · Condensing Unit ×1
2 projects · most recent 03/27/2026
Water/Sanitary
FiledStatusContractorScope
03/27/2026Permit IssuedS. TIEGER PLBG. CO., INCWater/Sanitary
06/29/2022Permit IssuedHUDSON PLMBING & MCH, LLCWater/Sanitary
20 projects · most recent 05/03/2026
General Wiring
FiledStatusContractorScope
05/03/2026Permit IssuedKET ELECTRIC LLCGeneral Wiring
03/06/2026Permit IssuedDANUBE ELECTRIC CO., INC.General Wiring
12/19/2025Permit IssuedGS ELECTRIC INCGeneral Wiring
02/13/2025Permit IssuedEMPIRE ELECTRIC NYC LLCGeneral Wiring
12/01/2023CompleteEVS ELECTRIC CORPGeneral Wiring
01/12/2023CompleteASTRO ELECL CONTNG INCGeneral Wiring
08/25/2022Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
04/27/2022Permit IssuedGOTHAM WIRING LICENSEDGeneral Wiring
01/26/2022CompleteLVI NYC ELECTRICAL INCGeneral Wiring
08/21/2021CompleteJ Y ELECTRIC INCGeneral Wiring
08/05/2021Permit IssuedAMSTERDAM ELECTRIC CORPGeneral Wiring
04/29/2021CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
11/11/2020CompleteGOTHAM WIRING LICENSEDGeneral Wiring
06/09/2020Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
03/04/2020CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
06/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/08/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/17/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/15/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
02/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/06/2026HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
04/06/2026HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
03/11/2026Post-installed AnchorsGordon Kahnspecial
03/11/2026Lighting in dwelling unitsGordon Kahnenergy_progress
03/11/2026Maintenance informationLAWRENCE GREENenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsGordon Kahnspecial
03/11/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
03/09/2026Mechanical SystemsLAWRENCE GREENspecial
03/09/2026FinalGordon Kahnprogress
02/15/2026HVAC-R and service water piping design and insulationNickolas Batisenergy_progress
02/15/2026HVAC-R and service water heating system controlsNickolas Batisenergy_progress
02/15/2026Maintenance informationNickolas Batisenergy_progress
02/15/2026HVAC-R and service water heating equipmentNickolas Batisenergy_progress
02/15/2026Lighting in dwelling unitsNickolas Batisenergy_progress
02/15/2026Interior lighting powerNickolas Batisenergy_progress
02/15/2026Fire-Resistant Penetrations and JointsJunda Qiuspecial
02/15/2026Lighting controlsNickolas Batisenergy_progress
02/13/2026FinalNickolas Batisprogress
02/13/2026Mechanical SystemsJunda Qiuspecial
02/21/2025Energy Code Compliance InspectionsErich schoenenbergerprogress
02/21/2025FinalErich schoenenbergerprogress
02/21/2025Lighting in dwelling unitsErich schoenenbergerenergy_progress
02/21/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
04/28/2024HVAC-R and service water piping design and insulationErich schoenenbergerenergy_progress
04/28/2024Maintenance informationErich schoenenbergerenergy_progress
Latest 25 of 48.
▾Documents — 392 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch21
08/26/2026X01369551-I1Request digital key ↗
08/25/2026X00556238-I1Request digital key ↗
08/25/2026X00556268-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00448252-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026X00386609-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00322338-I1Request digital key ↗
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION25
09/10/2025220655556Open ↗
09/05/2025220655556Open ↗
02/20/2020220667231Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION24
12/18/2020220655556Open ↗
07/15/2020220725874Open ↗
03/24/2020220667231Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications111
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
03/24/2020220685060Open ↗
02/20/2020220667231Open ↗
12/03/2019220696156Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/18/2026X08034770-I1Open ↗
09/13/2026X00556268-P1Open ↗
09/13/2026X00556268-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/26/2026X01369551-I1Open ↗
08/26/2026X00322338-I1Open ↗
08/25/2026X00386609-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/18/2026X08034770-I1Open ↗
09/01/2026X00936953-P1Open ↗
09/01/2026X00808217-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/22/2014240059093Open ↗
12/16/2013240044787Open ↗
12/02/2013220347159Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/22/2014240059093Open ↗
12/16/2013240044787Open ↗
11/14/2013240041691Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/22/2014240059093Open ↗
12/16/2013240044787Open ↗
11/14/2013240041691Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/02/2013220347159Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment26
▸BISSELF-CERT PLUMBING NOTICE13
07/21/2014240059093Open ↗
07/09/2014240059093Open ↗
07/05/2014240041691Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING5
05/22/2014240059093Open ↗
11/14/2013240041691Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/10/2019220685060Open ↗
09/17/2018220667222Open ↗
06/27/2018220655556Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/22/2014240059093Open ↗
11/14/2013240041691Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
07/05/2014240041691Open ↗
07/05/2014240041691Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/05/2014240041691Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes6
02/20/2020220667231Open ↗
02/12/2020220725874Open ↗
08/07/2019220696156Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026X00322338-I1Open ↗
08/13/2026X00386609-I1Open ↗
▸Environmental & Asbestos29
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
02/20/2020220667231Open ↗
02/12/2020220725874Open ↗
08/07/2019220696156Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026X01369551-I1Open ↗
08/25/2026X00448252-I1Open ↗
08/23/2026X00807385-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/23/2026X00829026-I1Open ↗
08/13/2026X00936953-S2Open ↗
08/13/2026X00828359-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
03/24/2020220685060Open ↗
02/20/2020220667231Open ↗
02/12/2020220725874Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
03/24/2020220685060Open ↗
12/03/2019220696156Open ↗
05/31/2019220667222Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/26/2022220725874Open ↗
05/22/2014240059093Open ↗
11/14/2013240041691Open ↗
▸BISTR8: Energy Code Progress Inspections2
04/09/2013220155659Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/16/2025220655556Open ↗
01/26/2022220725874Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/22/2014240059093Open ↗
11/14/2013240041691Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/16/2025220655556Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/16/2025220655556Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/19/2020220725874Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/16/2025220655556Open ↗
01/26/2022220725874Open ↗
06/12/2020220725874Open ↗
Showing 3 of 8 on file for this type
▸BISPOST-INSTALLED ANCHORS1
07/19/2020220725874Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/16/2025220655556Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/16/2025220655556Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
09/22/2025220655556Open ↗
01/27/2022220725874Open ↗
03/24/2020220685060Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/24/2020220685060Open ↗
05/31/2019220667222Open ↗
11/07/2018240059093Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT25
03/24/2020220685060Open ↗
02/20/2020220667231Open ↗
02/12/2020220725874Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/22/2025220655556Open ↗
01/26/2022220725874Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET10
02/20/2020220667231Open ↗
02/12/2020220725874Open ↗
08/07/2019220696156Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
03/24/2020220667231Open ↗
03/24/2020220685060Open ↗
12/03/2019220696156Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet6
05/22/2014240059093Open ↗
12/16/2013240044787Open ↗
11/14/2013240041691Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
05/19/2020220725874Open ↗
02/24/2020220685060Open ↗
03/15/2019220685060Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWCalculations1
08/13/2026X01239364-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01335776-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01239364-I1Open ↗