← Back
One story retail building
2729 OCEAN AVENUE
BROOKLYN · BIN 3202143
💬 Discuss this project
1946Year Built
1Stories
K1Building Class
R7AZoning
14,440 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 2737 OCEAN AVENUE LLC · 11,000 sf lot · 1.31 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Roof2p · 2 filings · 8 docs
Floor 125p · 6 filings · 20 docs
Cellar22p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAVOY CONCRETE INSPECTION407/08/2026
RISE DEVELOPMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2018$7.2M—KLLR REALTY LLC → 2737 OCEAN AVENUE LLC$499/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RSLN ARCHITECTURE PLLC204/21/2023
LAURIA ASSOCIATES112/22/2022
DESIGN STUDIO ASSOCIATES506/17/2022
ENGINEERING SOLUTIONS202/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RISE DEVELOPMENT PARTNERSGeneral Contractor1007/08/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570112/22/2022
INTEGRITY CONSULTING SERV666406/17/2022
CONSULTING ENGINEER5093103/23/2020
Building Lifecycle
All (105)Filed (10)Permit Issued (9)Signed Off (7)Violation (4)Inspection (11)Objection (42)Special Inspection (22)
12/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2023
Filed — Alteration CO
SHOW PLAYGROUND AND ACCESSORY PARKING SPACE IN SIDE YARD, SHOW EXISTING RETAIL STORE WITH EXISTING ACCESSORY STORAGE IN EXISTING 1 STORY AND CELLAR BUILDING. MODIFY CERTIFICATE OFOCCUPANCY. TO REFLECT ENTIRE BUILDING.
B08013076-P1
04/19/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2023
Permit issued — General Construction
B08013076-I1-GC
01/23/2023
Filed — Alteration CO
SHOW PLAYGROUND AND ACCESSORY PARKING SPACE IN SIDE YARD, SHOW EXISTING RETAIL STORE WITH EXISTING ACCESSORY STORAGE IN EXISTING 1 STORY AND CELLAR BUILDING. MODIFY CERTIFICATE OFOCCUPANCY. TO REFLECT ENTIRE BUILDING.
B08013076-I1
01/23/2023
Signed off — Alteration
General Construction, Structural & Foundation work to install a canopy at OSP.
B08053105-I1
01/06/2023
Permit issued — Structural
B08053105-I1-GC-CX
12/22/2022
Filed — Alteration
General Construction, Structural & Foundation work to install a canopy at OSP.
B08053105-I1
08/18/2022
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION AND CONVERSION OF EXISTING RETAIL SPACE INTO DAY CARE AS PER PLANS FILED HEREWITH
B00636548-I1
08/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2022
Signed off — Alteration
B00607224-I1
07/18/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
07/15/2022
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT DAY CARE FACILITY AS PER PLANS FILED HEREWITH
B00657720-I1
07/15/2022
Signed off — Alteration
MODIFICATION OF EXISTING HAVC SYSTEM AS PER PLANS FILED HEREWITH
B00657754-I1
07/14/2022
Objection resolved — Addressed
07/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Masonry
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
07/13/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES FOR PROPOSED DAY CARE AS PER PLANS FILED HEREWITH
B00674716-I1
06/30/2022
Objection raised — Other
06/17/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AND CONVERSION OF EXISTING RETAIL SPACE INTO DAY CARE AS PER PLANS FILED HEREWITH
B00636548-P1
06/17/2022
Permit issued — Mechanical Systems
B00657754-I1-MS
06/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2022
Special inspection requirement — Masonry
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
06/01/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2022
Permit issued — Sprinklers
B00657720-I1-EW-SP
03/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2022
Permit issued — Plumbing
B00674716-I1-PL
02/28/2022
Permit issued — General Construction
B00636548-I1-GC
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
02/23/2022
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT DAY CARE FACILITY AS PER PLANS FILED HEREWITH
B00657720-I1
02/23/2022
Filed — Alteration
MODIFICATION OF EXISTING HAVC SYSTEM AS PER PLANS FILED HEREWITH
B00657754-I1
02/17/2022
Objection raised — Structural
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRISE DEVELOPMENT PARTNERS02/08/2023
DOB NOWStructuralSigned-offRISE DEVELOPMENT PARTNERS01/06/2023
DOB NOWMechanical SystemsSigned-offRISE DEVELOPMENT PARTNERS06/17/2022
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC04/14/2022
DOB NOWPlumbingSigned-offLS PLUMBING CORP03/03/2022
DOB NOWGeneral ConstructionPermit IssuedRISE DEVELOPMENT PARTNERS02/28/2022
DOB NOWConstruction FenceSigned-offRISE DEVELOPMENT PARTNERS02/01/2022
DOB NOWConstruction FenceSigned-offRISE DEVELOPMENT PARTNERS10/22/2021
DOB NOWMechanical SystemsSigned-offRISE DEVELOPMENT PARTNERS05/08/2020
BISFPISSUEDIDEAL FIRE SYSTEMS INC12/19/2003
2 projects · most recent 06/02/2022
General Wiring
FiledStatusContractorScope
06/02/2022CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
03/07/2022CompleteEMPIRE STATE ELECTL CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2022Pass-Final Fence Non-Directive 14PassView ↗
06/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/14/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/14/2022MasonryALEKSANDR LEVINspecial
07/14/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
07/14/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
07/14/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
07/14/2022Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
07/14/2022Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
07/14/2022HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
07/14/2022Fenestration areasALEKSANDR LEVINenergy_progress
07/14/2022Fenestration air leakageALEKSANDR LEVINenergy_progress
06/16/2022MasonryALEKSANDR LEVINspecial
06/16/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/16/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
06/16/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/16/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/16/2022Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
06/16/2022Fenestration air leakageALEKSANDR LEVINenergy_progress
06/16/2022Fenestration areasALEKSANDR LEVINenergy_progress
06/16/2022Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
06/16/2022HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
02/24/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
01/05/2022Sprinkler SystemsALEKSANDR LEVINspecial
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/01/2026B00607224-I1Request digital key ↗
08/31/2026B00657720-I1Request digital key ↗
08/31/2026B00657754-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00330409-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
07/29/2022301680893Open ↗
07/29/2022321780195Open ↗
03/20/2018321780195Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00636548-P1Open ↗
08/13/2026B00636548-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/27/2026B08013076-I1Open ↗
08/13/2026B00636548-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00607224-I1Open ↗
08/29/2026B00636548-P1Open ↗
08/29/2026B00636548-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00657720-I1Open ↗
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/20/2018321780195Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/27/2026B08013076-P1Open ↗
08/27/2026B08013076-I1Open ↗
08/14/2026B00636548-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00636548-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00636548-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/14/2026B00636548-P1Open ↗
08/14/2026B00636548-I1Open ↗
08/13/2026B00657754-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00636548-I1Open ↗
08/13/2026B00657754-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B08053105-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08053105-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
03/20/2018321780195Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/20/2018321780195Open ↗
▸Other Documents4
▸DOB NOWFinal Survey2
08/27/2026B08013076-I1Open ↗
08/13/2026B00636548-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026B08013076-P1Open ↗
08/27/2026B08013076-I1Open ↗