1858Year Built
5Stories
O5Building Class
M1-5/R9XZoning
29,956 sfGross Floor Area
5Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: GREAT CANAL REALTY CORPORATION · 4,995 sf lot · 6 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 20 docs
Floor 3Under Construction4p · 1 filing · 9 docs
Floor 21 filing · 3 docs
Floor 19p · 2 filings · 20 docs
Cellar12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8203 3RD AVE PROPERTY108/13/2026
HOUSTON ESSEX REALTY607/08/2026
KIM HUNG BAKERY INC503/22/2026
GREAT CANAL REALTY7903/22/2026
BUNNIE LAI D/B/F 150 - LA103/22/2026
METRO CONTRACTING NY203/21/2026
250 LAFAYETTE PROP. INVEST.503/21/2026
150 LAFAYETTE PROP INVESTMENT1303/21/2026
MULTANI CONSTRUCTION USA103/21/2026
150 LAFAYETTE PROPERTY INVESTMEN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP2203/21/2026
JM ZONING, LLC.803/21/2026
AE DESIGN SOLUTION403/21/2026
NODE ARCH ENGIN CONSULT403/21/2026
NEW YORK SIGNS103/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor707/08/2026
ACTION CONSTRUCTION MGMTGeneral Contractor507/08/2026
TOP BUILD CONTRACTORS INCGeneral Contractor406/27/2026
JEM FIRE PREVENTION INCFire Protection307/08/2026
CORE DESIGN & BUILD INCGeneral Contractor303/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor207/08/2026
R & T ELECTRICAL CORPElectrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
YOUNG CHOEElectrical103/21/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
JFZ CONSTRUCTION, INCGeneral Contractor107/08/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold108/13/2026
FIVE TOWN NEON SIGN CO INScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRANT ENGINEERING2627207/07/2025
AKS ARCHITECTURAL & ENGIN19571205/29/2024
MJ ENGINEERING & DESIGN5546101/30/2024
INTERNATIONAL GEOTEHCNICA1795108/31/2022
KL INNOVATIVE DESIGN INC7225209/21/2021
Building Lifecycle
All (145)Filed (24)Permit Issued (23)Signed Off (14)Violation (35)Inspection (11)Objection (8)Special Inspection (30)
08/18/2026
Signed off — Alteration
PROPOSE NEW ILLUMINATED SIGNAGE FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01430988-I1
08/12/2026
Permit issued — Sign
M01430988-I1-SG
08/11/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED SIGNAGE FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01430988-I1
08/07/2026
Special inspection requirement — Final
YUNHO LEE
06/24/2026
Permit issued — General Construction
M01236828-I1-GC
05/28/2026
Signed off — Alteration
HEREWITH FILING SPRINKLER WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01236828-S1
12/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Permit issued — Sprinklers
M01236828-S1-EW-SP
12/05/2025
Signed off — Alteration
HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01164773-S1
11/21/2025
Objection resolved — Addressed
11/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Permit issued — Sprinklers
M01164773-S1-EW-SP
09/04/2025
Objection raised — Cost
08/28/2025
Signed off — Alteration
HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01164773-I1
08/28/2025
Objection resolved — Addressed
08/08/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Cost
07/09/2025
Objection raised — Scope
07/07/2025
Filed — Alteration
HEREWITH FILING SPRINKLER WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01236828-S1
06/30/2025
Filed — Alteration
HEREWITH FILING SPRINKLER WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01236828-I1
06/05/2025
Special inspection requirement — Sprinkler Systems
Stephen Morse
06/05/2025
Special inspection requirement — Final
ZORA BOYADZHIEVA
03/26/2025
Permit issued — Sprinklers
M01164773-S1-EW-SP
03/10/2025
Objection resolved — Addressed
03/07/2025
Objection raised — Cost
02/28/2025
Filed — Alteration
HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01164773-S1
02/27/2025
Permit issued — General Construction
M01164773-I1-GC
02/05/2025
Filed — Alteration
HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCY
M01164773-I1
01/09/2025
Special inspection requirement — Final
ZORA BOYADZHIEVA
05/29/2024
Filed — Alteration
Interior renovation of existing cellar and 1st floor in existing 5 story commercial buildings.
M00811305-P4
05/29/2024
Signed off — Alteration
Application is filed for modified sprinkler system and plumbing work associated with installing new fixtures at cellar, first floor & second floor.
M00811349-I1
05/29/2024
Signed off — Alteration
Interior renovation of existing cellar and 1st floor in existing 5 story commercial buildings.
M00811305-I1
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Final
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Maintenance information
Giuseppe Anzalone
05/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
05/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Lighting controls
Giuseppe Anzalone
05/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Fenestration air leakage
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Sprinkler Systems
HONG-CHIN MAA
05/21/2024
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Heating Systems
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Smoke Control Systems Testing
Giuseppe Anzalone
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
05/20/2024
Filed — Alteration
Application is filed for modified sprinkler system and plumbing work associated with installing new fixtures at cellar, first floor & second floor.
M00811349-P6
05/20/2024
Special inspection requirement — Sprinkler Systems
HONG-CHIN MAA
05/16/2024
Filed — Alteration
Interior renovation of existing cellar and 1st floor in existing 5 story commercial buildings.
M00811305-P3
05/15/2024
Filed — Alteration
Application is filed for modified sprinkler system and plumbing work associated with installing new fixtures at cellar, first floor & second floor.
M00811349-P5
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMAD SIGNS INC08/12/2026
DOB NOWGeneral ConstructionPermit IssuedTOP BUILD CONTRACTORS INC06/24/2026
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC12/08/2025
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC10/01/2025
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC03/26/2025
DOB NOWGeneral ConstructionSigned-offTOP BUILD CONTRACTORS INC02/27/2025
DOB NOWSprinklersSigned-offJ. CAIAZZO PLBG & HTG COR03/18/2024
DOB NOWStructuralSigned-offACTION CONSTRUCTION MGMT02/23/2024
DOB NOWSignPermit IssuedENRICO PASSARO01/04/2024
DOB NOWConstruction FenceSigned-offACTION CONSTRUCTION MGMT11/02/2023
DOB NOWSprinklersSigned-offJ. CAIAZZO PLBG & HTG COR08/25/2023
DOB NOWSprinklersSigned-offANTHONY CAIAZZO08/25/2023
DOB NOWGeneral ConstructionSigned-offACTION CONSTRUCTION MGMT08/14/2023
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP05/18/2023
DOB NOWGeneral ConstructionSigned-offJFZ CONSTRUCTION, INC05/04/2023
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY09/21/2022
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY08/17/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC11/06/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/06/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/08/2018
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC11/08/2018
DOB NOWConstruction FenceSigned-offCORE DESIGN & BUILD INC01/31/2018
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/30/2018
BISMHISSUEDCORE DESIGN & BUILD INC03/08/2019
BISOTISSUEDARTISAN PRESERVATION LLC03/06/2019
BISOTISSUEDCORE DESIGN & BUILD INC01/22/2018
BISFPISSUEDPINNACLE PLBG & HTG CORP07/06/2017
BISPLISSUEDI DO PLUMBING & HTG INC06/08/2017
BISSPISSUEDAVON PLBG & HTG INC06/08/2017
BISOTISSUEDNICE HSY ENTERPRISE INC05/16/2017
BISPLISSUEDI DO PLUMBING & HTG INC03/13/2017
BISOTISSUEDNICE HSY ENTERPRISE INC03/08/2017
BISEQISSUEDMETRO CONTRACTING NY, INC.09/20/2016
BISOTISSUEDMULTANI CONSTRUCTION USA08/31/2016
BISOTISSUEDMULTANI CONSTRUCTION USA07/20/2016
BISMHISSUEDKABACK ENTERPRISES INC04/19/2016
BISOTISSUEDKERCOR INC04/04/2016
BISOTISSUEDKERCOR INC02/03/2016
BISOTISSUEDETNA CONTRACTING INC09/28/2015
BISEQISSUEDMARAMAR CORP03/03/2014
+ 33 more permits on file
1 project · most recent 07/07/2025
Sprinkler System
FiledStatusContractorScope
07/07/2025Signed-offJEM FIRE PREVENTION INCSprinkler System
1 project · most recent 07/07/2025
FiledStatusContractorScope
07/07/2025———
4 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedVOLTRON ELECTRIC LLC—
12/09/2023CompleteTACTICAL ELECTRIC INCGeneral Wiring
09/24/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
10/16/2018CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 11/15/2017
Fence
FiledStatusContractorScope
11/15/2017Signed-offCORE DESIGN & BUILD INCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/31/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
12/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/07/2026FinalYUNHO LEEprogress
06/05/2025Sprinkler SystemsStephen Morsespecial
06/05/2025FinalZORA BOYADZHIEVAprogress
01/09/2025FinalZORA BOYADZHIEVAprogress
05/21/2024Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
05/21/2024FinalGiuseppe Anzaloneprogress
05/21/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
05/21/2024Shutoff dampersGiuseppe Anzaloneenergy_progress
05/21/2024Maintenance informationGiuseppe Anzaloneenergy_progress
05/21/2024HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
05/21/2024Interior lighting powerGiuseppe Anzaloneenergy_progress
05/21/2024HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
05/21/2024Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
05/21/2024Lighting controlsGiuseppe Anzaloneenergy_progress
05/21/2024HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
05/21/2024Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
05/21/2024Fenestration air leakageGiuseppe Anzaloneenergy_progress
05/21/2024Fenestration and door U-factor and product ratingsGiuseppe Anzaloneenergy_progress
05/21/2024Sprinkler SystemsHONG-CHIN MAAspecial
05/21/2024Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
05/21/2024Heating SystemsGiuseppe Anzalonespecial
05/21/2024Mechanical SystemsGiuseppe Anzalonespecial
05/21/2024Smoke Control Systems TestingGiuseppe Anzalonespecial
05/21/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
05/20/2024Sprinkler SystemsHONG-CHIN MAAspecial
Latest 25 of 59.
▾Documents — 444 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
09/06/2026M00001262-I1Request digital key ↗
09/06/2026M00014257-I1Request digital key ↗
09/06/2026M00087369-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00407235-P1Request digital key ↗
09/03/2026M00407235-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION37
11/12/2018140815081Open ↗
08/07/2018123077115Open ↗
12/12/2017123077115Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION26
03/08/2019123077115Open ↗
03/06/2019140815081Open ↗
01/22/2018123278611Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWLPC Approval/Permit16
09/03/2026M00407235-P1Open ↗
09/03/2026M00407235-I1Open ↗
08/27/2026M00811349-I1Open ↗
Showing 3 of 16 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/19/2017120519974Open ↗
▸Seals & Professional Certifications120
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
12/12/2019123077115Open ↗
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00087370-I1Open ↗
09/03/2026M00407235-I1Open ↗
09/03/2026M00407235-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026M00087370-I1Open ↗
08/28/2026M00811305-P4Open ↗
08/28/2026M00811305-P4Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
11/12/2018140815081Open ↗
12/01/2017123278611Open ↗
05/12/2017123077115Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
12/01/2017123278611Open ↗
05/12/2017123077115Open ↗
04/10/2017123006460Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01236828-S1Open ↗
08/28/2026M00811305-P4Open ↗
08/28/2026M00811305-P4Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/12/2018140815081Open ↗
09/19/2016140550883Open ↗
06/29/2016140515707Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/12/2018140815081Open ↗
09/19/2016140550883Open ↗
06/29/2016140515707Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
12/12/2017123077115Open ↗
07/24/2017123077115Open ↗
07/24/2017123077115Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
12/12/2019123077115Open ↗
12/12/2019123077115Open ↗
04/28/2016122729798Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
04/19/2018123138318Open ↗
12/04/2017123295488Open ↗
▸BISEQUIPMENT USE PERMITS2
12/12/2019123077115Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/19/2016140550883Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/06/2026M00087370-I1Open ↗
08/31/2026M00811305-P3Open ↗
08/31/2026M00811305-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
11/12/2018140815081Open ↗
12/01/2017123278611Open ↗
05/12/2017123077115Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
12/09/2019123006460Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/21/2020140815081Open ↗
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/12/2018140815081Open ↗
06/29/2016140515707Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/12/2018140815081Open ↗
▸BISNYCECC ANALYSIS1
11/12/2018140815081Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00407235-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/21/2020140815081Open ↗
03/06/2019140815081Open ↗
11/12/2018140815081Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
12/09/2019123036428Open ↗
12/09/2019123006460Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs51
▸BISLANDMARKS APPROVAL20
12/12/2019123077115Open ↗
11/12/2018140815081Open ↗
12/01/2017123278611Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/21/2020140815081Open ↗
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/04/2017123295488Open ↗
09/15/2017120519974Open ↗
09/15/2017120519974Open ↗
▸BISLANDMARKS SIGNOFF3
07/21/2020140815081Open ↗
12/09/2019123036428Open ↗
12/09/2019123006460Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
07/21/2020140815081Open ↗
▸DOB NOWLandmark Approval1
08/16/2026M01430988-I1Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
07/21/2020140815081Open ↗
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET18
12/01/2017123278611Open ↗
08/30/2017123138318Open ↗
07/03/2017123295488Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION7
07/25/2017123077115Open ↗
07/24/2017123077115Open ↗
05/24/2017123077115Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
12/12/2019123077115Open ↗
12/09/2019123036428Open ↗
12/09/2019123006460Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/12/2018140815081Open ↗
09/19/2016140550883Open ↗
06/29/2016140515707Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/15/2017120519974Open ↗
09/15/2017120519974Open ↗
▸BISPLOT DIAGRAM1
09/15/2017120519974Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M07995255-I1Open ↗