← Back
BuildNYC
Two family frame
273 NASHVILLE STREET
STATEN ISLAND · BIN 5175023
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,754 sfGross Floor Area
2Units
Two family frame · 4,407 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic13p · 2 filings · 8 docs
Floor 213p · 4 filings · 20 docs
Floor 112p · 5 filings · 20 docs
Cellar14p · 4 filings · 20 docs
Basement1p · 2 filings · 20 docs
Sub-Basement13p · 2 filings · 8 docs
Site & exterior12p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cep Development2907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Build SI804/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Build SI1403/21/2026
Island Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Morningstar BuildingGeneral Contractor403/21/2026
Rite-Flo P.H. & CoolingPlumbing207/08/2026
Morningstar BuildingScaffold107/08/2026
Duo Plumbing & HeatingFire Protection107/08/2026
Duo Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Island Engineering Associates264304/17/2023
A Tech Engineering NYC, P6738212/06/2022
Design Build, SI6114112/06/2022
Building Lifecycle
05/14/2023
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S00546955-I1-PL
04/25/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2023
Filed — New Building
Construct a detached, two family, frame residence. Tentative Lot 17
S00495138-P5
04/05/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
04/05/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM DURDEN, P.E.
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDuo Plumbing & Heating01/17/2023
DOB NOWPlumbingSigned-offDuo Plumbing & Heating01/13/2023
DOB NOWPlumbingPermit IssuedDJ Plumbing & Heating11/29/2022
DOB NOWCurb CutSigned-offMorningstar Building09/21/2022
DOB NOWPlumbingSigned-offDJ Plumbing & Heating02/02/2022
DOB NOWEarth WorkPermit IssuedMorningstar Building12/22/2021
DOB NOWConstruction FenceSigned-offMorningstar Building11/30/2021
1 project · most recent 11/14/2022
General Wiring
FiledStatusContractorScope
11/14/2022CompleteS & V ElectricalGeneral Wiring
1 project · most recent 04/17/2023
Wood
FiledStatusContractorScope
04/17/2023Permit IssuedMorningstar BuildingWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/06/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/26/2022Pass-Final Fence Non-Directive 14PassView ↗
09/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/05/2023Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
04/05/2023Excavations - Sheeting, Shoring, and BracingWILLIAM DURDEN, P.E.special
04/05/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM DURDEN, P.E.special
04/05/2023Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
04/05/2023MeteringWILLIAM DURDEN, P.E.energy_progress
04/05/2023Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
04/05/2023Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
04/05/2023Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
04/05/2023Subgrade InspectionsWILLIAM DURDEN, P.E.special
04/05/2023Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
04/05/2023FinalWILLIAM DURDEN, P.E.progress
04/05/2023Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
04/05/2023Footing and FoundationWILLIAM DURDEN, P.E.progress
04/05/2023Structural Wood FrameWILLIAM DURDEN, P.E.progress
04/05/2023Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
04/05/2023Permanent certificateWILLIAM DURDEN, P.E.energy_progress
04/05/2023Fenestration areasWILLIAM DURDEN, P.E.energy_progress
04/05/2023Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
04/05/2023Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
04/05/2023Maintenance informationWILLIAM DURDEN, P.E.energy_progress
04/05/2023Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
04/05/2023Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
12/05/2022Sprinkler SystemsGiuseppe Bonomospecial
51 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account