← Back
BuildNYC
Public elementary, junior or senior high
273 NEWPORT STREET
BROOKLYN · Brownsville · BIN 3082391
💬 Discuss this project
1930Year Built
5Stories
W1Building Class
R6Zoning
114,800 sfGross Floor Area
1Units
LL97 Covered6 Active Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 50,000 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7503/22/2026
NYC Department of Education403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF Services Crop102/25/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY Heights ConstructionGeneral Contractor303/21/2026
Prince ElectricElectrical103/21/2026
Pulsar ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589102/25/2022
Building Lifecycle
All (133)Filed (1)Permit Issued (1)Signed Off (1)Violation (113)Objection (2)Special Inspection (1)
08/17/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/28/2026
Reissue#35717329L date of issue:05.02.2025 failure to maintain building in code-compliant manner.at the time of inspection observed and noted at…
ECB violation · open
05/28/2026
Failure to maintain building in code-compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.at thetime of…
ECB violation · open
05/28/2026
Failure to maintain building in code-compliant manner.at the time of inspection observed and noted at stairway g and b in staircase coverv by glass…
ECB violation · open
11/21/2025
FPS-25-01: Failed to provide and/or maintain at premises a record for inspection, testing, and maintenance of fire protection and/or communication…
FDNY_ORDER violation · closed
11/21/2025
PA-25-01: Failed to provide and/or maintain required records for the operation of a building or space as a place of assembly and/or inspection,…
FDNY_ORDER violation · closed
11/21/2025
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
11/21/2025
ADM-02-03: Failed to produce approval from the Department of Buildings for design and installation of material, device, equipment, system,…
FDNY_ORDER violation · closed
11/04/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/02/2025
Re-issue #35650990K. Failure to maintain building in code-compliant manner. Noted: at kitchen on the first floor, these is a 10 burner storewithout…
ECB violation · open
05/02/2025
Re-issue #35672699M. Failure to maintain building in code-compliant manner. Noted: at bulkhead stair 6 and 7 the ceiling is spalling, also there…
ECB violation · closed
05/02/2025
VC14: failed to (provide/protect/maintain) required (fire- rated/self-closing/access) door or window at premises.
FDNY_NOV violation · closed
01/14/2025
C-11-01: Failed to provide a person holding a valid Certificate of Fitness for fire protection system at premises, in violation of FC901.6.
FDNY_ORDER violation · closed
11/18/2024
Boiler inspection report filed
Initial · no defects · Accepted
05/23/2024
Reissue #35650990K. Failure to maintain building in code-compliant manner. At time of my inspection i observed at the cafeteria kitchen a 10BURNER…
ECB violation · open
05/23/2024
Reissue #35672699M. Failure to maintain building in code-compliant manner. At time of my inspection i observed at the roof top level bulkhead stair…
ECB violation · closed
10/16/2023
Signed off — Alteration
Filing for temporary support of excavation inside the property in playground. No change in use, egress and occupancy.
B00687188-I1
10/03/2023
Boiler inspection report filed
Initial · no defects · Accepted
10/03/2023
Boiler inspection report filed
Initial · defects found · Accepted
04/14/2023
Failure to maintain building in code compliant manner.noted on 3RD floor gym,missing and cracked floor tiles.remedy:repair and/or replace floor tiles.
ECB violation · closed
04/14/2023
Reissue#35561326H failure to maintain building in code compliant manner.illumination for exits,exit discharges and public corridors per…
ECB violation · closed
04/14/2023
Reissue#35561327J failure to maintain building in code compliant manner.lack of emergency lighting for exits,exit discharges and public corridors…
ECB violation · closed
04/14/2023
Reissue#35561149X failure to maintain building in code compliant manner.noted at rooftop bulkhead stair 6,7 spalling plaster at ceiling and walls…
ECB violation · closed
04/14/2023
Failure to maintain building in code compliant manner.use of prohibited door and/or hardware per BC1008.1.8,27-371(j)noted on 3RD floor…
ECB violation · closed
04/14/2023
Reissue#35650990K failure to maintain building in code compliant manner.noted at cafeteria kitchen,in burner gas stove do not have a fire…
ECB violation · open
10/27/2022
GP-8: Failed to provide and/or maintain openings through fire-resistance-rated assemblies with self-closing/automatic-closing doors of approved…
FDNY_ORDER violation · closed
10/27/2022
FPS-02-01: Failed to obtain approval from agency having jurisdiction for fire protection and/or communication system, in violation of FC901.5.
FDNY_ORDER violation · closed
06/17/2022
Permit issued — Support of Excavation
B00687188-I1-SE
06/16/2022
Boiler inspection report filed
Initial · no defects · Accepted
05/12/2022
Objection resolved — Addressed
04/05/2022
BF19:
FDNY_NOV violation · closed
03/23/2022
Temp equipment onsite (sws)-expired permit observed sws still up@EXP1,2,3,4 temp const equipment requires permit@all times to remain…
ECB violation · closed
03/01/2022
Objection raised — Other
02/25/2022
Filed — Alteration
Filing for temporary support of excavation inside the property in playground. No change in use, egress and occupancy.
B00687188-I1
02/24/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Michael Marchese
01/20/2022
RH-6: Conduct a satisfactory acceptance test of the commercial cooking system.
FDNY_ORDER violation · closed
01/20/2022
RH-0: Discontinue use of unprotected cooking appliance(s) use that generate(s) grease-laden cooking vapors or smoke.
FDNY_ORDER violation · closed
01/20/2022
RH-45: Failed to (maintain/produce) records for commercial cooking exhaust system.
FDNY_ORDER violation · closed
01/20/2022
RH-1: Failed to install a fire extinguishing system to protect commercial cooking appliances.
FDNY_ORDER violation · closed
08/05/2021
Boiler inspection report filed
Initial · defects found · Accepted
08/05/2021
Boiler inspection report filed
Initial · no defects · Accepted
05/10/2021
Failure to maintain bldg in code compliant manner. Noted: at roof level bulkhead stair 6&7 water penetration/damage to ceiling/walls & floors…
ECB violation · closed
05/10/2021
Exit door not self closing. Noted: at 5TH fl stair c,(1ST fl)cafeteriadoor checks in disrepair/non operational when tested. Remedy: repair/ replace…
ECB violation · closed
05/10/2021
Failure to maintain bldg in code compliant manner lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1/27-542.…
ECB violation · closed
05/10/2021
Failure to maintain bldg in code compliant manner illumination for exits,exit discharges & public corridors as per bc 1006.1/27-381. Noted: at 3RD…
ECB violation · closed
05/10/2021
Failure to maintain bldg in code compliant manner. Noted: at 1ST fl stair f,cafeteria,exit 3 doors are in disrepair/racked. Remedy: repair &/or…
ECB violation · closed
09/25/2020
Boiler inspection report filed
Subsequent · no defects · Accepted
09/25/2020
Boiler inspection report filed
Initial · defects found · Accepted
12/13/2019
Boiler inspection report filed
Initial · no defects · Accepted
12/13/2019
Boiler inspection report filed
Initial · defects found · Accepted
06/17/2019
Exit door is not self closing at 1ST floor exits 7,6 staircase "f" and cafeteria exit doors, door checks, things are in disrepair condition .noted:…
ECB violation · closed
06/10/2019
Failure to maintain building in code compliant manner at exit 1 (main entrance) vestibule above transom glass pane is broken or missing remedy:…
ECB violation · closed
06/13/2018
Boiler inspection report filed
Initial · defects found · Accepted
04/30/2018
Exit door not self closing noted:at 1ST flr exits 7,6 staircase f and cafeteria exit doors not self closing door/self closers racked broke doors…
ECB violation · closed
04/30/2018
Failure to maintain building in code compliant manner.noted:at pre k classroom 213 ceiling cracked with evidence on water stains…
ECB violation · closed
04/30/2018
Failure to maintain building in code compliant manner.noted:at playground asphalt floor in disrepair/cracked coming up in various locations…
ECB violation · closed
04/30/2018
Reissue#35252931R issued 04/24/17 failure to maintain building in codecompliant manner.noted:all bulkheads and staircases 2,3,4,5,6,7 storage rooms…
ECB violation · closed
04/30/2018
Failure to maintain building in code compliant manner lack of emergency lighting for exits,exit discharges and public and auditorium roof level…
ECB violation · closed
04/30/2018
Failuer to maintain building in code compliant manner.use of prohibited door and or hardware per BC1008.1.8 27-371(j).noted:at 3RD flr staircases d…
ECB violation · closed
04/30/2018
Failure to maintain building in code compliant manner no fire stoppingper BC712.3; 27345.noted:at basement electrical room fire stopping…
ECB violation · closed
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—SKY Heights Construction—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Tameer—
BIS—Forsythe P&H—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Forsythe P&H—
BIS—Tameer—
BIS—Civil Contracting—
BIS—Forsythe P&H—
BIS—Tameer—
BIS—Prime Contractors—
BIS—Prime Contractors—
BIS—Civil Contracting—
BIS—Forsythe P&H—
BIS—Tameer—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Forsythe P&H—
BIS—Prime Contractors—
BIS—Civil Contracting—
BIS—Prime Contractors—
BIS—Tameer—
BIS—Civil Contracting—
BIS—Tameer—
BIS—Forsythe P&H—
BIS—Tameer—
BIS—Prime Contractors—
BIS—Civil Contracting—
BIS—Civil Contracting—
BIS—Prime Contractors—
BIS—Varsity Plumbing and Heating—
BIS—CM&E Con—
BIS—Knight Construction—
BIS—Varsity Plumbing and Heating—
+ 11 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00687188-I1Request the plans ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00687188-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00687188-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026B00687188-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00687188-I1Open ↗
▸Other Documents3
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00687188-I1Open ↗
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal1
08/13/2026B00687188-I1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026B00687188-I1Open ↗