Banking facility, with or without parking
2730 CONEY ISLAND AVENUE
BROOKLYN · Gravesend (South) · BIN 3195591
💬 Discuss this project
1931Year Built
1Stories
K7Building Class
R4Zoning
4,200 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: SAPVIN REALTY LLC · 10,066 sf lot · 0.42 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 210p · 3 filings · 20 docs
Floor 110p · 3 filings · 20 docs
Mezzanine1p · 1 filing · 20 docs
Site & exterior3p · 2 filings · 20 docs
Filed — no permit issued4p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHASE BANK203/21/2026
PM REALTY GROUP C/O JP MORGAN CH103/21/2026
PM REALTY GROUP C O JP MORGAN CH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SJ MAZZELLA, RA1009/10/2026
THEODORE LAURENCE STRAUSS ASSOC303/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING1803/21/2026
MICHAEL SJ MAZZELLA RA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASTORIA P & H CORPPlumbing1807/08/2026
COMPLETE CONSTRUCTION MANGeneral Contractor1507/08/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139709/10/2026
G ENGINEERING PC7778204/30/2024
Building Lifecycle
All (123)Filed (13)Permit Issued (12)Violation (8)Inspection (6)Objection (54)Special Inspection (30)
09/10/2026
Filed — Alteration
INSTALLATION OF NEW TOILET FACILITIES AND OTHER PLUMBING FIXTURES AND DEVICES AS REQUIRED FOR THE CONVERSION FROM A BANK TO FUNERAL ESTABLISHMENT.
B00569916-P4
09/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Michael Mazzella
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
09/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Michael Mazzella
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
09/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Mazzella
08/28/2026
Objection resolved — Addressed
08/28/2026
Objection resolved — Addressed
04/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2026
Objection raised — Other
01/08/2026
Objection resolved — Addressed
12/23/2025
Filed — Alteration
INSTALLATION OF NEW TOILET FACILITIES AND OTHER PLUMBING FIXTURES AND DEVICES AS REQUIRED FOR THE CONVERSION FROM A BANK TO FUNERAL ESTABLISHMENT.
B00569916-P3
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
12/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Mazzella
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
12/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Mazzella
12/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Mazzella
12/22/2025
Objection resolved — Resolved
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2025
Permit issued — Plumbing
B00569916-I1-PL
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2025
Permit issued — Mechanical Systems
B00568722-I1-GC-CX
12/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/08/2024
Filed — Alteration
INSTALLATION OF NEW TOILET FACILITIES AND OTHER PLUMBING FIXTURES AND DEVICES AS REQUIRED FOR THE CONVERSION FROM A BANK TO FUNERAL ESTABLISHMENT.
B00569916-P2
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/24/2024
Objection raised — Other
06/21/2024
Objection resolved — Addressed
06/17/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
05/28/2024
Permit issued — Plumbing
B00569916-I1-PL
05/07/2024
Objection raised — Other
05/02/2024
Objection raised — Scope
05/02/2024
Objection raised — Other
05/01/2024
Objection raised — Mechanical
05/01/2024
Objection raised — Admin
05/01/2024
Objection raised — Inspections
04/30/2024
Filed — Alteration CO
B00568722-P2
04/30/2024
Filed — Alteration
INSTALLATION OF NEW TOILET FACILITIES AND OTHER PLUMBING FIXTURES AND DEVICES AS REQUIRED FOR THE CONVERSION FROM A BANK TO FUNERAL ESTABLISHMENT.
B00569916-P1
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
04/18/2024
Special inspection requirement — Concrete - Cast-In-Place
XIONGCAI GU
04/18/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
XIONGCAI GU
04/18/2024
Special inspection requirement — Lowest Floor Elevation
XIONGCAI GU
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
04/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
04/18/2024
Special inspection requirement — Subgrade Inspections
XIONGCAI GU
04/18/2024
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
04/18/2024
Special inspection requirement — Final
XIONGCAI GU
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
04/18/2024
Special inspection requirement — Mechanical Systems
XIONGCAI GU
04/18/2024
Special inspection requirement — Exterior lighting power
XIONGCAI GU
04/18/2024
Special inspection requirement — Structural Cold-Formed Steel
XIONGCAI GU
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Michael Mazzella
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Mazzella
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Michael Mazzella
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedASTORIA P & H CORP07/01/2025
DOB NOWMechanical SystemsPermit IssuedCOMPLETE CONSTRUCTION MAN02/20/2025
DOB NOWPlumbingPermit IssuedASTORIA P & H CORP05/28/2024
DOB NOWConstruction FencePermit IssuedCOMPLETE CONSTRUCTION MAN03/27/2024
DOB NOWMechanical SystemsPermit IssuedCOMPLETE CONSTRUCTION MAN03/18/2024
DOB NOWPlumbingPermit IssuedASTORIA P & H CORP06/08/2023
DOB NOWGeneral ConstructionPermit IssuedCOMPLETE CONSTRUCTION MAN03/15/2023
DOB NOWConstruction FencePermit IssuedCOMPLETE CONSTRUCTION MAN03/15/2023
DOB NOWGeneral ConstructionPermit IssuedCOMPLETE CONSTRUCTION MAN01/24/2023
DOB NOWConstruction FencePermit IssuedCOMPLETE CONSTRUCTION MAN01/24/2023
DOB NOWGeneral ConstructionPermit IssuedCOMPLETE CONSTRUCTION MAN12/22/2022
DOB NOWConstruction FencePermit IssuedCOMPLETE CONSTRUCTION MAN12/13/2022
BIS—ISSUEDNATIONAL MAINTENANCE INC.05/17/2006
BIS—ISSUEDNATIONAL MAINTENANCE INC.05/17/2006
BISOTISSUEDNATIONAL MAINTENANCE INC05/17/2006
BISMHISSUEDSOUND REFRIGERATION & AIR09/07/2004
BISMHISSUEDONE SOURCE ENERGY04/22/2002
BIS—ISSUEDNORTH SHOSE NEON SIGN CO INC08/04/1998
BIS—ISSUEDNORTH SHORE NEON SIGN CO INC.08/04/1998
BIS—ISSUEDNORTH SHOW NEON SIGN INC.08/04/1998
BIS—ISSUEDNORTH SHORE NEON SIGN CO INC.08/04/1998
1 project · most recent 09/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedASTORIA P & H CORPStorm, Water/Sanitary
1 project · most recent 07/25/2023
General Wiring
FiledStatusContractorScope
07/25/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 10/15/2021
Fence
FiledStatusContractorScope
10/15/2021Permit IssuedCOMPLETE CONSTRUCTION MANFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
09/10/2026Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
09/10/2026HVAC-R and service water heating system controlsMichael Mazzellaenergy_progress
09/10/2026HVAC-R and service water piping design and insulationMichael Mazzellaenergy_progress
09/10/2026HVAC-R and service water heating equipmentMichael Mazzellaenergy_progress
09/10/2026Energy Code Compliance InspectionsMichael Mazzellaprogress
12/23/2025Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
12/23/2025HVAC-R and service water heating system controlsMichael Mazzellaenergy_progress
12/23/2025HVAC-R and service water heating equipmentMichael Mazzellaenergy_progress
12/23/2025HVAC-R and service water piping design and insulationMichael Mazzellaenergy_progress
12/23/2025Energy Code Compliance InspectionsMichael Mazzellaprogress
04/18/2024HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
04/18/2024Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
04/18/2024HVAC-R and service water heating equipmentMichael Mazzellaenergy_progress
04/18/2024HVAC-R and service water piping design and insulationMichael Mazzellaenergy_progress
04/18/2024HVAC-R and service water heating system controlsMichael Mazzellaenergy_progress
04/18/2024Energy Code Compliance InspectionsMichael Mazzellaprogress
04/18/2024Concrete - Cast-In-PlaceXIONGCAI GUspecial
04/18/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)XIONGCAI GUspecial
04/18/2024Mechanical SystemsXIONGCAI GUspecial
04/18/2024Structural Cold-Formed SteelXIONGCAI GUspecial
04/18/2024Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
04/18/2024Structural Steel - DetailsXIONGCAI GUspecial
04/18/2024Subgrade InspectionsXIONGCAI GUspecial
04/18/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
04/18/2024FinalXIONGCAI GUprogress
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Coney Island Memorial ChapelOtherGround, Floors 1, 2
Project B00789839 Alteration · Approved · 08/09/2022
Project B00569916 Alteration · Plan Examiner Review · 10/15/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/28/2026B00789839-I1Request digital key ↗
08/27/2026B00801789-P1Request digital key ↗
08/27/2026B00801789-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
09/01/2026B00570336-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/25/2026B00568722-I1Open ↗
08/25/2026B00568722-P2Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature38
09/23/2026B00569916-P4Open ↗
09/23/2026B00569916-P4Open ↗
09/02/2026B00568722-P2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026B00569916-P4Open ↗
09/02/2026B00568722-P2Open ↗
09/02/2026B00568722-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/21/2026B00569916-P4Open ↗
09/01/2026B00569957-I1Open ↗
08/27/2026B00801789-P1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/25/2026B00568722-I1Open ↗
08/25/2026B00568722-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/25/2026B00568722-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/25/2026B00568722-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/21/2026B00569916-P4Open ↗
08/27/2026B00801789-P1Open ↗
08/27/2026B00801789-I1Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/25/2026B00568722-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/25/2026B00568722-I1Open ↗
▸Other Documents8
▸DOB NOWPlot Diagram2
08/25/2026B00568722-P2Open ↗
08/25/2026B00568722-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/25/2026B00568722-P2Open ↗
08/25/2026B00568722-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/25/2026B00568722-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/25/2026B00568722-I1Open ↗
▸DOB NOWSurvey1
08/13/2026B00568722-S1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/25/2026B00568722-I1Open ↗