← Back
Elevator cooperative
2734 INDEPENDENCE AVENUE
BRONX · BIN 2083483
💬 Discuss this project
1970Year Built
6Stories
D4Building Class
R6AZoning
83,880 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: GOODMAN MGMT CO INC · 32,950 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 3 docs
Cellar2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY109/10/2026
TCR RESTORATION CONSTRUCTION107/08/2026
2736 INDEPENDENCE AVE103/22/2026
2736 INDEPENDENCE OWNERS CORP1003/21/2026
C O GOODMAN MANAGEMENT403/21/2026
HERCULES203/21/2026
2736 INDEPENDENCE AVE OWNERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING1003/21/2026
SOMMA DESIGN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAT FONG YAUElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor109/10/2026
TCR RESTORATION & CONST*General Contractor109/13/2026
WTC PLBG & HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312102/23/2026
CROSSCHECK INSPECTION SER544102/23/2026
AMKA & ASSOCIATES LLC8239101/06/2025
LEDER-LUIS ARCHITECTURAL1553509/07/2021
Building Lifecycle
All (97)Filed (8)Permit Issued (4)Signed Off (1)Facade (FISP) (12)Violation (35)Objection (28)Special Inspection (9)
09/11/2026
Permit issued — General Construction
X01358463-I1-GC
09/09/2026
Permit issued — Sidewalk Shed
X01431757-I1-SH
06/15/2026
Permit issued — Suspended Scaffold
X01409653-I1-SC
05/31/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK WITH INSPECTIONS AT 2736 INDEPENDENCE AVENUE, BRONX
X01409653-I1
02/23/2026
Filed — Alteration
X01358463-I1
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
01/14/2025
Objection raised — Structural
01/14/2025
Objection raised — Structural
01/14/2025
Objection raised — Other
01/06/2025
Filed — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
X01156235-I1
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
AHMAD KHANZADA
12/16/2024
Special inspection requirement — Final
AHMAD KHANZADA
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
11/16/2023
Violation issued (HPD, closed)
I
12/16/2022
Cycle 9 facade report submitted
12/16/2022
Cycle 9 facade report signed — SWARMP
10/20/2022
Cycle 9 facade inspection completed
02/17/2022
Violation issued (HPD, closed)
A
11/03/2021
Signed off — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-I1
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
09/07/2021
Filed — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-P4
09/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
08/09/2021
Filed — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-P3
07/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
06/23/2021
Filed — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-P2
06/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
05/25/2021
Filed — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-P1
05/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2021
Permit issued — Plumbing
X00240158-I1-PL
01/13/2021
Objection raised — Other
01/13/2021
Objection resolved — Addressed
04/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2020
Objection raised — Structural
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Admin
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Structural
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Fire_Protection
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Fire_Protection
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Admin
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Admin
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Inspections
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Structural
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Inspections
01/09/2020
Objection resolved — Addressed
12/31/2019
Filed — Alteration
Install sprinkler heads for proposed Superintendent apartment. All other plumbing fixtures are existing
X00240158-I1
07/31/2018
Cycle 8 facade report signed — SAFE
05/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2018
Cycle 8 facade report submitted
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTCR RESTORATION & CONST*09/11/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP09/09/2026
DOB NOWSuspended ScaffoldPermit IssuedTCR RESTORATION AND CONST06/15/2026
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP03/15/2021
BIS—ISSUEDACS ENVIRONMENTAL & CONST06/02/2023
BIS—ISSUEDM.S.Y. GROUP INC07/14/2020
BISOTISSUEDPRIORE CONSTRUCTION SVCS01/22/2019
BISOTISSUEDTRADITIONAL WATERPROOFING12/29/2017
BISOTISSUEDTRADITIONAL WATERPROOFING06/30/2017
BISEQISSUEDTRADITIONAL WATERPROOFING05/12/2017
BISEQISSUEDROCK GROUP NY CORP05/12/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/29/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/05/2015
BISEQISSUEDROCK GROUP NY CORP04/22/2014
BISOTISSUEDTRADITIONAL WATERPROOFING04/11/2014
BISOTISSUEDSQUAN CONSTRUCTION SERVIC02/04/2014
BISFSISSUEDMARLANDE HEATING CORP10/21/2013
BISPLISSUEDALKLEM PLUMBING INC10/21/2013
BISOTISSUEDTRADITIONAL WATERPROOFING08/21/2013
BISEQISSUEDROCK GROUP NY CORP06/04/2013
BISOTISSUEDC C CONTROLLED COMBUSTION08/18/2009
BISFSISSUEDC C CONTROLLED COMBUSTION08/18/2009
BISOTISSUEDKINGS BORO APPLIANCES INC05/27/2009
BISFSISSUEDC C CONTROLLED COMBUSTION04/10/2008
BISOTISSUEDC C CONTROLLED COMBUSTION02/04/2008
BISOTISSUEDCROSS STATE CONSTRUCTION CO.01/29/2007
BISEQRE-ISSUEDOUTDOOR INSTALLATIONS LLC06/17/2005
BISFBISSUEDC C CONTROLLED COMBUSTION06/22/1998
4 projects · most recent 09/08/2026
General Wiring
FiledStatusContractorScope
09/08/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/22/2025CompletePROJECT ONE ELECTRIC INCGeneral Wiring
05/16/2023CompleteLEIGH ELECTRICAL INCGeneral Wiring
03/03/2021CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
1 project · most recent 01/06/2025
Concrete
FiledStatusContractorScope
01/06/2025——Concrete
1 project · most recent 05/31/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/31/2026Permit IssuedTCR RESTORATION AND CONSTSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/16/2024Concrete - Cast-In-PlaceAHMAD KHANZADAspecial
12/16/2024FinalAHMAD KHANZADAprogress
12/16/2024Tenant Protection Plan Compliance—special
12/16/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
09/16/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
09/03/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
07/30/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
06/21/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
05/25/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
▾Documents — 304 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/15/2026X00240158-I1Request digital key ↗
08/15/2026X00240158-P1Request digital key ↗
08/15/2026X00240158-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
08/20/2026X01156235-I1Request digital key ↗
08/17/2026X01358463-I1Request digital key ↗
08/16/2026X01409653-I1Request digital key ↗
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION33
11/30/2022220719970Open ↗
11/22/2022220719970Open ↗
09/01/2022220719970Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION24
06/07/2023220719970Open ↗
06/01/2023220719970Open ↗
07/14/2020220719970Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/08/2023220719970Open ↗
06/30/2017240177571Open ↗
06/30/2017240177571Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/29/2021220719970Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
07/03/2023220719970Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/25/2022220719970Open ↗
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
11/15/2019220719970Open ↗
09/03/2019220460515Open ↗
01/15/2019220460515Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026X00240158-P2Open ↗
08/26/2026X00240158-I1Open ↗
08/26/2026X00240158-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/05/2026X00240158-P3Open ↗
09/01/2026X00240158-P2Open ↗
09/01/2026X00240158-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/28/2018220682116Open ↗
05/10/2017240180825Open ↗
05/10/2017240182397Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/28/2018220682116Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/10/2017240180825Open ↗
05/10/2017240182397Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/10/2017240180825Open ↗
05/10/2017240182397Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/24/2017240177571Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01156235-I1Open ↗
▸Trade Schedules & Equipment8
▸BISFA - FDNY APPROVAL : FD-FAA2
03/29/2016220460515Open ↗
02/04/2016220345482Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/13/2016220492633Open ↗
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes5
01/14/2020220719970Open ↗
12/28/2018220682116Open ↗
05/14/2018220460515Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan5
08/13/2026X00240158-P3Open ↗
08/13/2026X00240158-P2Open ↗
08/13/2026X00240158-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
11/15/2019220719970Open ↗
01/13/2016220492633Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREE SIGNOFF1
07/03/2023220719970Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/14/2020220719970Open ↗
12/28/2018220682116Open ↗
04/27/2017220492633Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00240158-P1Open ↗
08/26/2026X00240158-P3Open ↗
08/26/2026X00240158-P4Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/30/2018240177571Open ↗
Showing 1 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
09/03/2019220460515Open ↗
01/15/2019220460515Open ↗
01/15/2019220460515Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/30/2023220719970Open ↗
07/02/2021220682116Open ↗
07/13/2020220719970Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/15/2019220460515Open ↗
07/30/2018240177571Open ↗
10/17/2016220345482Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/03/2023220719970Open ↗
07/02/2021220682116Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPSTECHNICAL INSPECTION1
09/01/2023220719970Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/10/2017240180825Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/03/2023220719970Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/02/2021220682116Open ↗
02/02/2018240177571Open ↗
02/02/2018240177571Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/03/2023220719970Open ↗
▸BISMECHANICAL SYSTEMS1
07/03/2023220719970Open ↗
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
08/10/2023220719970Open ↗
07/02/2021220682116Open ↗
09/03/2019220460515Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
11/30/2022220719970Open ↗
11/22/2022220719970Open ↗
09/01/2022220719970Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/01/2023220719970Open ↗
06/30/2017240177571Open ↗
09/27/2016220338659Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
04/23/2014220270542Open ↗
▸BISFINAL1
07/02/2021220682116Open ↗
▸BISSUPERSEDING LETTER1
06/07/2023220719970Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT21
11/15/2019220719970Open ↗
01/15/2019220460515Open ↗
12/28/2018220682116Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/31/2023220719970Open ↗
07/02/2021220682116Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
07/10/2020220719970Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET9
11/15/2019220719970Open ↗
12/28/2018220682116Open ↗
01/13/2016220492633Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION9
04/12/2022220719970Open ↗
05/14/2018220460515Open ↗
02/09/2018240177571Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM8
06/01/2023220719970Open ↗
09/03/2019220460515Open ↗
06/03/2019220460515Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/10/2017240180825Open ↗
05/10/2017240182397Open ↗
03/24/2017240177571Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/02/2018240177571Open ↗
▸DOB NOWCalculations1
08/16/2026X01409653-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01409653-I1Open ↗