💬 Discuss this project
1946Year Built
1Stories
K1Building Class
R7AZoning
14,440 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
One story retail building · Owner of record: 2737 Ocean Avenue · 11,000 sf lot · 1.31 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAvenue 'w' Daycare13p · 5 filings · 18 docs
Floor 1Avenue 'w' Daycare38p · 6 filings · 20 docs
CellarAvenue 'w' Daycare35p · 5 filings · 18 docs
Site & exterior2737 Ocean Avenue, LLC8p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Savoy Concrete Inspection407/08/2026
Rise Development103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2018$7.2M—KLLR REALTY LLC → 2737 OCEAN AVENUE LLC$499/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RSLN Architecture204/21/2023
Lauria Associates112/22/2022
Design Studio Associates506/17/2022
Engineering Solutions202/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Studio Associates703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rise Development PartnersGeneral Contractor707/08/2026
Rise Development PartnersScaffold307/08/2026
M&D Fire SprinklerFire Protection107/08/2026
Rite Way HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lauria Associates7570112/22/2022
Integrity Consulting Service666406/17/2022
Consulting Engineer5093103/23/2020
Building Lifecycle
All (103)Filed (10)Permit Issued (9)Signed Off (7)Violation (4)Inspection (9)Objection (42)Special Inspection (22)
05/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2023
Filed — Alteration CO
SHOW PLAYGROUND AND ACCESSORY PARKING SPACE IN SIDE YARD, SHOW EXISTING RETAIL STORE WITH EXISTING ACCESSORY STORAGE IN EXISTING 1 STORY AND CELLAR BUILDING. MODIFY CERTIFICATE OFOCCUPANCY. TO REFLECT ENTIRE BUILDING.
B08013076-P1
04/19/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2023
Permit issued — General Construction
B08013076-I1-GC
01/23/2023
Filed — Alteration CO
SHOW PLAYGROUND AND ACCESSORY PARKING SPACE IN SIDE YARD, SHOW EXISTING RETAIL STORE WITH EXISTING ACCESSORY STORAGE IN EXISTING 1 STORY AND CELLAR BUILDING. MODIFY CERTIFICATE OFOCCUPANCY. TO REFLECT ENTIRE BUILDING.
B08013076-I1
01/23/2023
Signed off — Alteration
General Construction, Structural & Foundation work to install a canopy at OSP.
B08053105-I1
01/06/2023
Permit issued — Foundation
B08053105-I1-GC-CX
12/22/2022
Filed — Alteration
General Construction, Structural & Foundation work to install a canopy at OSP.
B08053105-I1
08/18/2022
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION AND CONVERSION OF EXISTING RETAIL SPACE INTO DAY CARE AS PER PLANS FILED HEREWITH
B00636548-I1
07/19/2022
Signed off — Alteration
B00607224-I1
07/18/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
07/15/2022
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT DAY CARE FACILITY AS PER PLANS FILED HEREWITH
B00657720-I1
07/15/2022
Signed off — Alteration
MODIFICATION OF EXISTING HAVC SYSTEM AS PER PLANS FILED HEREWITH
B00657754-I1
07/14/2022
Objection resolved — Addressed
07/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Masonry
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
07/14/2022
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
07/13/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES FOR PROPOSED DAY CARE AS PER PLANS FILED HEREWITH
B00674716-I1
06/30/2022
Objection raised — Other
06/17/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AND CONVERSION OF EXISTING RETAIL SPACE INTO DAY CARE AS PER PLANS FILED HEREWITH
B00636548-P1
06/17/2022
Permit issued — Mechanical Systems
B00657754-I1-MS
06/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2022
Special inspection requirement — Masonry
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
06/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
06/01/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2022
Permit issued — Sprinklers
B00657720-I1-EW-SP
03/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2022
Permit issued — Plumbing
B00674716-I1-PL
02/28/2022
Permit issued — General Construction
B00636548-I1-GC
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
02/23/2022
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT DAY CARE FACILITY AS PER PLANS FILED HEREWITH
B00657720-I1
02/23/2022
Filed — Alteration
MODIFICATION OF EXISTING HAVC SYSTEM AS PER PLANS FILED HEREWITH
B00657754-I1
02/17/2022
Objection raised — Inspections
02/17/2022
Objection raised — Admin
02/17/2022
Objection raised — Admin
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRise Development Partners02/08/2023
DOB NOWFoundationSigned-offRise Development Partners01/06/2023
DOB NOWMechanical SystemsSigned-offRise Development Partners06/17/2022
DOB NOWSprinklersSigned-offM&D Fire Sprinkler04/14/2022
DOB NOWPlumbingSigned-offLS Plumbing03/03/2022
DOB NOWGeneral ConstructionPermit IssuedRise Development Partners02/28/2022
DOB NOWConstruction FenceSigned-offRise Development Partners02/01/2022
DOB NOWConstruction FenceSigned-offRise Development Partners10/22/2021
DOB NOWMechanical SystemsSigned-offRise Development Partners05/08/2020
BISFPISSUEDIdeal Fire Systems12/19/2003
2 projects · most recent 06/02/2022
General Wiring
FiledStatusContractorScope
06/02/2022CompleteEmpire State ElectlGeneral Wiring
03/07/2022CompleteEmpire State Electl—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2022Pass-Final Fence Non-Directive 14PassView ↗
06/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/14/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/14/2022MasonryALEKSANDR LEVINspecial
07/14/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
07/14/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
07/14/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
07/14/2022Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
07/14/2022Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
07/14/2022HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
07/14/2022Fenestration areasALEKSANDR LEVINenergy_progress
07/14/2022Fenestration air leakageALEKSANDR LEVINenergy_progress
06/16/2022MasonryALEKSANDR LEVINspecial
06/16/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/16/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
06/16/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/16/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/16/2022Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
06/16/2022Fenestration air leakageALEKSANDR LEVINenergy_progress
06/16/2022Fenestration areasALEKSANDR LEVINenergy_progress
06/16/2022Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
06/16/2022HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
02/24/2022Energy Code Compliance InspectionsALEKSANDR LEVINprogress
01/05/2022Sprinkler SystemsALEKSANDR LEVINspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Avenue 'w' DaycareEducationCellar, Floor 1
Project B00636548 Alteration CO · CO Issued · 12/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/01/2026B00607224-I1Request digital key ↗
08/31/2026B00657720-I1Request digital key ↗
08/31/2026B00657754-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00330409-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
07/29/2022301680893Open ↗
07/29/2022321780195Open ↗
03/20/2018321780195Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00636548-P1Open ↗
08/13/2026B00636548-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/27/2026B08013076-I1Open ↗
08/13/2026B00636548-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00607224-I1Open ↗
08/29/2026B00636548-P1Open ↗
08/29/2026B00636548-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00657720-I1Open ↗
08/24/2026B00636548-P1Open ↗
08/24/2026B00636548-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/20/2018321780195Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/27/2026B08013076-P1Open ↗
08/27/2026B08013076-I1Open ↗
08/14/2026B00636548-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00636548-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00636548-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/14/2026B00636548-P1Open ↗
08/14/2026B00636548-I1Open ↗
08/13/2026B00657754-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00636548-I1Open ↗
08/13/2026B00657754-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B08053105-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08053105-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
03/20/2018321780195Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/20/2018321780195Open ↗
▸Other Documents4
▸DOB NOWFinal Survey2
08/27/2026B08013076-I1Open ↗
08/13/2026B00636548-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026B08013076-P1Open ↗
08/27/2026B08013076-I1Open ↗