Two family brick
2737A KINGSBRIDGE TERRACE
BRONX · BIN 2113209
💬 Discuss this project
2004Year Built
3Stories
B1Building Class
R6Zoning
3,544 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸
Two family brick · Owner of record: 2737A KINGSBRIDGE LLC · 1,916 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 319p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/25/2024$966K—— → —$273/sf building
03/14/2023$620K—— → —$175/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC712/09/2025
VASILIOS ARTEMIOU PE101/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor407/08/2026
YOSEF BLAUElectrical203/21/2026
S R ELECTRICAL MECHANIC 005147General Contractor203/22/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
QUALITY PIPINGPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524112/09/2025
HRF SERVICES CORP5616605/14/2025
Building Lifecycle
All (70)Filed (8)Permit Issued (5)Signed Off (3)Violation (6)Inspection (6)Objection (12)Special Inspection (30)
07/12/2026
Violation issued (HPD, open)
B
02/24/2026
Permit issued — Structural
X01118525-S5-ST
12/18/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Structural
12/09/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-S5
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
12/03/2025
Special inspection requirement — Final
Shahrish Shuvo
12/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/03/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
12/03/2025
Special inspection requirement — Structural Cold-Formed Steel
Shahrish Shuvo
07/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-S3
06/23/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-S1
06/23/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-S2
06/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/21/2025
Special inspection requirement — Metering
FAHAD FATEH
05/21/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/21/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/21/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/21/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/21/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/21/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/21/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/21/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/14/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-P3
05/13/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-P2
05/13/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/13/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/13/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/27/2025
Permit issued — Plumbing
X01118525-S2-PL
03/27/2025
Permit issued — Sprinklers
X01118525-S3-EW-SP
03/24/2025
Permit issued — General Construction
X01118525-I1-GC
03/21/2025
Permit issued — Mechanical Systems
X01118525-S1-MS
03/21/2025
Objection resolved — Addressed
03/05/2025
Objection raised — Other
03/03/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-P1
02/03/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/09/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 3 STORY AND CELLAR, INTO A 9 UNIT RESIDENTIAL BUILDING.
X01118525-S3
12/30/2024
Objection raised — Zoning
12/30/2024
Objection raised — Zoning
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP02/24/2026
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC03/27/2025
DOB NOWSprinklersSigned-offQUALITY PIPING, INC03/27/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP03/24/2025
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP03/21/2025
BISEQISSUEDVAN NEST CONSTRUCTION CORP12/22/2005
BISEQISSUEDVAN NEST CONSTRUCTION CORP05/25/2005
BIS—ISSUEDVAN NEST CONSTRUCTION CORP05/25/2005
BIS—ISSUEDHEVA CONSTRUCTION CORP.01/20/2005
BISEQISSUEDHEVA CONSTRUCTION CORP01/20/2005
BIS—ISSUEDHEVA CONSTRUCTION CORP.03/02/2004
BISEQISSUEDHEVA CONSTRUCTION CORP02/25/2004
1 project · most recent 12/09/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/09/2025Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXM18AVJU9 18,500 BTU · Heat Pump Outdoor ×6
RXF12BVJU9 13,500 BTU · Heat Pump Outdoor ×3
1 project · most recent 12/09/2025
Sprinkler System
FiledStatusContractorScope
12/09/2025Signed-offQUALITY PIPING, INCSprinkler System
1 project · most recent 12/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/09/2025Signed-offQUALITY PIPING, INCGas, Water/Sanitary
1 project · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
1 project · most recent 12/09/2025
Steel
FiledStatusContractorScope
12/09/2025Signed-offMJH CONSTRUCTION CORPSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
12/08/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
12/03/2025FinalShahrish Shuvoprogress
12/03/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/03/2025Structural Steel - DetailsShahrish Shuvospecial
12/03/2025Structural Cold-Formed SteelShahrish Shuvospecial
05/21/2025MeteringFAHAD FATEHenergy_progress
05/21/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/21/2025Interior lighting powerFAHAD FATEHenergy_progress
05/21/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/21/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/21/2025Permanent certificateFAHAD FATEHenergy_progress
05/21/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/21/2025Fenestration areasFAHAD FATEHenergy_progress
05/21/2025Maintenance informationFAHAD FATEHenergy_progress
05/21/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/21/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/21/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/21/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/16/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/16/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/13/2025Interior lighting powerFAHAD FATEHenergy_progress
05/13/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 48.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026X01118525-P3Request digital key ↗
08/19/2026X01118525-S5Request digital key ↗
08/19/2026X01118525-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X01118525-I1Open ↗
08/13/2026X01118525-P3Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026X01118525-P3Open ↗
08/28/2026X01118525-P3Open ↗
08/27/2026X01118525-S5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026X01118525-S2Open ↗
08/13/2026X01118525-S5Open ↗
08/13/2026X01118525-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026X01118525-P3Open ↗
08/27/2026X01118525-S5Open ↗
08/26/2026X01118525-S3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026X01118525-I1Open ↗
08/13/2026X01118525-P3Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01118525-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01118525-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01118525-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026X01118525-P1Open ↗
08/13/2026X01118525-S5Open ↗
08/13/2026X01118525-S3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026X01118525-P3Open ↗
08/13/2026X01118525-I1Open ↗