BuildNYC
Elevator apt, fireproof without stores
Marlboro Houses
2738 86TH STREET · BIN 3322185
💬 Discuss this project
1956Year Built
7Stories
D3Building Class
R5Zoning
846,056 sfGross Floor Area
1,072Units
LL97 Covered6 Active Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 902,000 sf lot · 0.94 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Boiler plant building concrete restorationUnder Construction5p · 1 filing · 12 docs
MezzanineMarlboro Houses boiler room mechanical workUnder Construction6p · 3 filings · 20 docs
CellarMarlboro Houses boiler room mechanical workUnder Construction49p · 4 filings · 20 docs
Sub-BasementBoiler plant building concrete restorationUnder Construction8p · 1 filing · 12 docs
Site & exteriorTemporary boiler trailer heating system installationUnder Construction61p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority6310/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Millman209/22/2026
Lawrence K. Shapiro106/24/2026
BGM Engineering205/05/2026
Macan Deve Engineers810/27/2025
Rigid Structural Design212/18/2024
NYMS Consulting609/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design403/21/2026
KM Associates of New York603/21/2026
J.A.M. Associates403/21/2026
Expedia Building Solution103/21/2026
K & M Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Mechanicalspecialty_contractor2707/08/2026
Maric MechanicalScaffold607/08/2026
FJP MechanicalPlumbing607/08/2026
Jemco Electrical Contspecialty_contractor207/03/2026
Intersystems Installation S&SScaffold204/09/2026
Tru-Val ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106106/24/2026
MT Group7981405/05/2026
Building Lifecycle
All (127)Filed (21)Permit Issued (35)Signed Off (2)Violation (6)Inspection (7)Objection (26)Special Inspection (30)
09/22/2026
Filed — Alteration
MARLBORO HOUSES BOILER PLANT BUILDING #29: INSTALLATION OF TEMPORARY SHORING AS PER PLANS.
B01408931-P1
09/21/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
07/01/2026
Permit issued — Structural
B01408931-S1-ST
06/24/2026
Filed — Alteration
MARLBORO HOUSES BOILER PLANT BUILDING #29: INSTALLATION OF TEMPORARY SHORING AS PER PLANS.
B01408931-S1
06/24/2026
Permit issued — General Construction
B01408931-I1-GC
06/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
06/22/2026
Special inspection requirement — Final
James Scheld
06/17/2026
Filed — Alteration
MARLBORO HOUSES BOILER PLANT BUILDING #29: INSTALLATION OF TEMPORARY SHORING AS PER PLANS.
B01408931-I1
05/28/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/27/2026
Permit issued — Plumbing
B00895930-S1-PL
05/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING IN ORDER TO REMOVE AN UNDERGROUND STORAGE TANK
B01119533-P1
03/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTOPHER BEHLE
03/18/2026
Permit issued — Mechanical Systems
B00895930-I1-GC
03/18/2026
Permit issued — Mechanical Systems
B00863505-I1-MS
03/18/2026
Permit issued — Structural
B00898030-I1-GC-CX
03/18/2026
Permit issued — Construction Fence
B00878484-I1-FN
03/17/2026
Permit issued — Support of Excavation
B01119533-I1-SE
03/16/2026
Permit issued — General Construction
B00898030-I1-GC-CX
03/16/2026
Permit issued — Mechanical Systems
B00863505-I1-MS
02/26/2026
Permit issued — Support of Excavation
B01119533-I1-SE
12/16/2025
Signed off — Alteration
B01127706-I1
12/09/2025
Signed off — Alteration
Installation of a temporary Boiler Work Platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
B01156958-I1
11/25/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/07/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
CHRISTOPHER BEHLE
10/27/2025
Filed — Alteration
INSTALLATION OF NEW GAS/WATER PIPING ASSOCIATED WITH BOILER REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00822316-P2
10/23/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
CHRISTOPHER BEHLE
10/21/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Objection raised — Other
09/12/2025
Permit issued — Plumbing
B00822316-I1-PL
08/25/2025
Filed — Alteration
INSTALLATION OF NEW GAS/WATER PIPING ASSOCIATED WITH BOILER REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00822316-P1
05/27/2025
Permit issued — Plumbing
B00895930-S1-PL
04/17/2025
Permit issued — Boiler Equipment
B00817774-I1-BE
03/20/2025
Permit issued — Mechanical Systems
B00863505-I1-MS
03/20/2025
Permit issued — General Construction
B00898030-I1-GC-CX
03/20/2025
Permit issued — Construction Fence
B00878484-I1-FN
03/20/2025
Permit issued — Mechanical Systems
B00895930-I1-GC
02/03/2025
Permit issued — Mechanical Systems
B00895930-I1-GC
02/03/2025
Permit issued — General Construction
B00895930-I1-MS
01/10/2025
Permit issued — General Construction
B00898030-I1-GC-CX
01/10/2025
Permit issued — Construction Fence
B00878484-I1-FN
01/10/2025
Permit issued — Mechanical Systems
B00863505-I1-MS
12/19/2024
Permit issued — Protection and Mechanical Methods
B01156958-I1-PMM
12/18/2024
Filed — Alteration
B01127706-I1
12/18/2024
Filed — Alteration
Installation of a temporary Boiler Work Platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
B01156958-I1
12/18/2024
Permit issued — Supported Scaffold
B01127706-I1-SF
11/14/2024
Objection raised — Other
11/05/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING IN ORDER TO REMOVE AN UNDERGROUND STORAGE TANK
B01119533-I1
09/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Marisa Harte
09/10/2024
Special inspection requirement — Final
MICHAEL KALINOWSKI
09/10/2024
Special inspection requirement — Mechanical Systems
Marisa Harte
09/10/2024
Special inspection requirement — Chimneys and vents
Marisa Harte
09/07/2024
Filed — Alteration
MARLBORO HOUSES (BUILDING #29), THE INSTALLATION OF TEMPORARY STEAM AND CONDENSATE PIPING TO CONNECT (3) TEMPORARY BOILER TRAILERS TO THE EXISTING BUILDING HEATING SYSTEM TO PROVIDE HEAT DURING THE HEATING SEASON. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00895930-P3
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/02/2024
Permit issued — Mechanical Systems
B00863505-I1-MS
08/02/2024
Permit issued — Structural
B00898030-I1-GC-CX
07/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Marisa Harte
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJemco Electrical Cont07/01/2026
DOB NOWGeneral ConstructionPermit IssuedJemco Electrical Cont06/24/2026
DOB NOWPlumbingSigned-offFJP Mechanical05/27/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/18/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/18/2026
DOB NOWStructuralPermit IssuedMaric Mechanical03/18/2026
DOB NOWConstruction FencePermit IssuedMaric Mechanical03/18/2026
DOB NOWSupport of ExcavationPermit IssuedMaric Mechanical03/17/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/16/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/16/2026
DOB NOWSupport of ExcavationPermit IssuedMaric Mechanical02/26/2026
DOB NOWPlumbingSigned-offFJP Mechanical09/12/2025
DOB NOWPlumbingSigned-offFJP Mechanical05/27/2025
DOB NOWBoiler EquipmentSigned-offFJP Mechanical04/17/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/20/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/20/2025
DOB NOWConstruction FencePermit IssuedMaric Mechanical03/20/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/20/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical02/03/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical02/03/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical01/10/2025
DOB NOWConstruction FencePermit IssuedMaric Mechanical01/10/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical01/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S12/19/2024
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S12/18/2024
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical08/02/2024
DOB NOWStructuralPermit IssuedMaric Mechanical08/02/2024
DOB NOWPlumbingSigned-offFJP Mechanical05/29/2024
DOB NOWBoiler EquipmentSigned-offFJP Mechanical04/18/2024
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/21/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/20/2024
DOB NOWConstruction FencePermit IssuedMaric Mechanical03/20/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical02/26/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical02/26/2024
DOB NOWConstruction FencePermit IssuedMaric Mechanical07/26/2023
BISOTISSUEDNavillus Tile04/22/2011
BISEQISSUEDNavillus Tile01/04/2011
BISEQISSUEDNavillus Tile01/04/2011
BISEQISSUEDNavillus Tile01/04/2011
BISEQISSUEDNavillus Tile11/12/2010
+ 3 more permits on file
1 project · most recent 07/21/2023
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2023Permit IssuedMaric MechanicalHeating Systems
Heating
Modine MODINE HC 258 348,000 BTU · Unit Heater ×2
2 projects · most recent 10/27/2025
Gas
FiledStatusContractorScope
10/27/2025Signed-offFJP MechanicalGas
09/07/2024Signed-offFJP MechanicalGas
3 projects · most recent 07/25/2025
General Wiring
FiledStatusContractorScope
07/25/2025Permit IssuedA.T.J. Electrical Co—
07/25/2025Permit IssuedA.T.J. Electrical CoGeneral Wiring
04/12/2024Permit IssuedTru-Val Electric—
3 projects · most recent 09/22/2026
Concrete
FiledStatusContractorScope
09/22/2026Permit IssuedJemco Electrical Cont1 scope_items
05/05/2026Permit IssuedMaric Mechanical2 scope_items
06/14/2024Permit IssuedMaric MechanicalConcrete
1 project · most recent 07/26/2023
Fence
FiledStatusContractorScope
07/26/2023Permit IssuedMaric MechanicalFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/25/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/21/2025Fail-Final Boiler Equipment InspectionFailView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
09/21/2026FinalGEORGE GHEBRYALprogress
06/22/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
06/22/2026FinalJames Scheldprogress
05/28/2026FinalGEORGE GHEBRYALprogress
03/20/2026Excavations - Sheeting, Shoring, and BracingCHRISTOPHER BEHLEspecial
11/07/2025High-Pressure Fuel-Gas Piping (Welding)CHRISTOPHER BEHLEspecial
10/23/2025High-Pressure Fuel-Gas Piping (Welding)CHRISTOPHER BEHLEspecial
09/10/2024HVAC-R and service water piping design and insulationMarisa Harteenergy_progress
09/10/2024FinalMICHAEL KALINOWSKIprogress
09/10/2024Mechanical SystemsMarisa Hartespecial
09/10/2024Chimneys and ventsMarisa Hartespecial
07/03/2024Structural Stability – Alterations of existing buildingsMarisa Hartespecial
07/03/2024FinalMICHAEL KALINOWSKIprogress
07/03/2024Post-installed AnchorsMarisa Hartespecial
07/03/2024Fire-Resistant Penetrations and JointsMarisa Hartespecial
07/03/2024MasonryMarisa Hartespecial
07/03/2024Concrete - Cast-In-PlaceMarisa Hartespecial
06/11/2024Concrete - Cast-In-PlaceMarisa Hartespecial
06/11/2024FinalMICHAEL KALINOWSKIprogress
06/11/2024Structural Stability – Alterations of existing buildingsMarisa Hartespecial
06/11/2024Post-installed AnchorsMarisa Hartespecial
06/11/2024MasonryMarisa Hartespecial
06/11/2024Fire-Resistant Penetrations and JointsMarisa Hartespecial
06/05/2024Chimneys and ventsMarisa Hartespecial
06/05/2024Mechanical SystemsMarisa Hartespecial
Latest 25 of 49.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/27/2026B00863505-P1Request digital key ↗
08/27/2026B00817774-I1Request digital key ↗
08/27/2026B00878484-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
12/11/2012320143867Open ↗
09/25/2012320143867Open ↗
11/15/2010320240155Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
01/06/2011320175886Open ↗
01/06/2011320240173Open ↗
11/15/2010320240155Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/27/2026B00817774-I1Open ↗
08/25/2026B00895930-P3Open ↗
08/25/2026B00895930-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
10/05/2026B01408931-P1Open ↗
09/23/2026B00898030-P1Open ↗
09/01/2026B00895930-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B00817774-I1Open ↗
09/23/2026B00898030-P1Open ↗
09/01/2026B00895930-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/20/2012320143867Open ↗
11/02/2011320240173Open ↗
11/02/2011320240155Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/15/2010320240155Open ↗
11/15/2010320240173Open ↗
06/23/2010320175886Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/15/2010320240155Open ↗
11/15/2010320240173Open ↗
06/23/2010320175886Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/15/2010320240155Open ↗
11/15/2010320240173Open ↗
06/23/2010320175886Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01408931-I1Open ↗
08/16/2026B01408931-S1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
12/20/2012320143867Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/20/2012320143867Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/25/2011320143867Open ↗
▸Approvals, Objections & Sign-offs38
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/25/2026B00898030-P3Open ↗
08/25/2026B00898030-P2Open ↗
08/25/2026B00898030-P1Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/20/2012320143867Open ↗
12/18/2012320143867Open ↗
11/02/2011320240173Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/15/2026B00898030-I1Open ↗
08/13/2026B00863505-I1Open ↗
08/13/2026B00817774-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/15/2010320240155Open ↗
11/15/2010320240173Open ↗
06/23/2010320175886Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/17/2026B01119533-P1Open ↗
08/13/2026B01119533-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/14/2010320143867Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
11/15/2010320240155Open ↗
11/15/2010320240173Open ↗
06/23/2010320175886Open ↗
▸BISADDITIONAL INFORMATION1
09/25/2012320143867Open ↗
▸Other Documents11
▸DOB NOWProof of Historic Building10
08/13/2026B00822316-P1Open ↗
08/13/2026B00817774-I1Open ↗
08/13/2026B00898030-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01119533-I1Open ↗