← Back
Two family brick
274 3 AVENUE
BROOKLYN · BIN 3323377
💬 Discuss this project
1800Year Built
3Stories
B1Building Class
M1-4/R6BZoning
2,700 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 274 THIRD LLC · 1,600 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 21p · 1 filing · 3 docs
Floor 1Under Construction18p · 2 filings · 16 docs
CellarUnder Construction18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
274 THIRD4709/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2021$2.7M—Private party → 274 THIRD LLC$1,000/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors1003/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZOON DEVELOPMENT INCGeneral Contractor807/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor403/21/2026
COCOZZA GROUP LLCGeneral Contractor207/25/2026
M & M PIPING AND HEATINGPlumbing207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962306/11/2026
TAN ENGINEERING, P.C.1291104/28/2026
INTEGRITY CONSULTING SERV666805/22/2025
JOEL PHAGOO ,PE, PLLC2416109/09/2024
JOSEPH K. BLUM CO. LLP1741110/11/2023
Building Lifecycle
All (106)Filed (15)Permit Issued (12)Signed Off (6)Inspection (7)Objection (36)Special Inspection (30)
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/23/2026
Permit issued — Structural
B01371023-S3-ST
07/23/2026
Permit issued — Plumbing
B01371023-S2-PL
07/02/2026
Permit issued — General Construction
B01371023-I1-GC
06/11/2026
Filed — Alteration
NEW STRUCTRUAL FRAMING FOR EXISTING OPENING AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN.
B01371023-S3
05/18/2026
Objection resolved — Addressed
05/18/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/28/2026
Filed — Alteration
NEW STRUCTRUAL FRAMING FOR EXISTING OPENING AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN.
B01371023-S2
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
04/22/2026
Special inspection requirement — Maintenance information
Roger Tan
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
04/05/2026
Filed — Alteration
NEW STRUCTRUAL FRAMING FOR EXISTING OPENING AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN.
B01371023-I1
10/17/2025
Signed off — Alteration
Additions/Modifications to existing mechanical system. No change to use, egress, or occupancy.
B07998416-I1
10/16/2025
Signed off — Alteration
Additions/Modifications to existing plumbing. No change to use, egress, or occupancy.
B07998418-I1
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection raised — Admin
05/22/2025
Filed — Alteration
Additions/Modifications to existing mechanical system. No change to use, egress, or occupancy.
B07998416-P1
05/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Final
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Ventilation and air distribution system
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Metering
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Heating Systems
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Permanent certificate
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Shutoff dampers
ALEKSANDR LEVIN
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/16/2025
Signed off — Alteration
B07995892-I1
05/13/2025
Signed off — Alteration
General Construction at cellar, 1st, 2nd and 3rd floors as per plans filed herewith. including the stair replacement. No change in Egress, Occupancy, or Use under this application.
B00774317-I1
05/05/2025
Filed — Alteration
Additions/Modifications to existing plumbing. No change to use, egress, or occupancy.
B07998418-P3
04/29/2025
Special inspection requirement — Permanent certificate
ALEKSANDR LEVIN
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
04/29/2025
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
03/21/2025
Permit issued — Structural
B07995892-I1-ST
02/07/2025
Filed — Alteration
Additions/Modifications to existing plumbing. No change to use, egress, or occupancy.
B07998418-P2
01/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
01/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
01/29/2025
Special inspection requirement — Permanent certificate
ALEKSANDR LEVIN
01/29/2025
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2024
Permit issued — Plumbing
B07998418-I1-PL
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedCOCOZZA GROUP LLC07/23/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR07/23/2026
DOB NOWGeneral ConstructionPermit IssuedCOCOZZA GROUP LLC07/02/2026
DOB NOWStructuralSigned-offZOON DEVELOPMENT INC03/21/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING12/02/2024
DOB NOWMechanical SystemsSigned-offZOON DEVELOPMENT INC11/01/2024
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY09/09/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY09/09/2024
DOB NOWGeneral ConstructionSigned-offZOON DEVELOPMENT INC07/01/2024
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING11/29/2023
DOB NOWMechanical SystemsSigned-offZOON DEVELOPMENT INC11/13/2023
DOB NOWGeneral ConstructionSigned-offZOON DEVELOPMENT INC09/27/2023
1 project · most recent 06/11/2026
Water/Sanitary
FiledStatusContractorScope
06/11/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORWater/Sanitary
3 projects · most recent 07/22/2026
General Wiring Lighting
FiledStatusContractorScope
07/22/2026Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
08/18/2025Permit IssuedMADISON ELECTRIC, INCGeneral Wiring
08/26/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 06/11/2026
Wood
FiledStatusContractorScope
06/11/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
04/24/2026Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
04/22/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
04/22/2026HVAC-R and service water heating system controlsRoger Tanenergy_progress
04/22/2026HVAC-R and service water heating equipmentRoger Tanenergy_progress
04/22/2026Energy Code Compliance InspectionsRoger Tanprogress
04/22/2026Fire-Resistant Penetrations and JointsRoger Tanspecial
04/22/2026Maintenance informationRoger Tanenergy_progress
05/19/2025HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
05/19/2025MeteringALEKSANDR LEVINenergy_progress
05/19/2025Shutoff dampersALEKSANDR LEVINenergy_progress
05/19/2025Maintenance informationALEKSANDR LEVINenergy_progress
05/19/2025Duct leakage testing, insulation and designALEKSANDR LEVINenergy_progress
05/19/2025Permanent certificateALEKSANDR LEVINenergy_progress
05/19/2025Ventilation and air distribution systemALEKSANDR LEVINenergy_progress
05/19/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/19/2025Heating SystemsALEKSANDR LEVINspecial
05/19/2025Mechanical SystemsALEKSANDR LEVINspecial
05/19/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
05/19/2025FinalALEKSANDR LEVINprogress
05/19/2025HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
04/29/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
04/29/2025HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
04/29/2025HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
04/29/2025Maintenance informationALEKSANDR LEVINenergy_progress
04/29/2025Permanent certificateALEKSANDR LEVINenergy_progress
Latest 25 of 61.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/28/2026B00774317-P2Request digital key ↗
08/26/2026B07995892-I1Request digital key ↗
08/26/2026B07998418-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature30
09/17/2026B07998418-P3Open ↗
09/17/2026B07998418-P3Open ↗
08/31/2026B00774317-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026B00774317-I1Open ↗
08/28/2026B00774317-P2Open ↗
08/28/2026B00774317-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/17/2026B07998418-P3Open ↗
08/31/2026B00774317-I1Open ↗
08/28/2026B07998418-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B00774317-P2Open ↗
08/26/2026B07995892-I1Open ↗
08/26/2026B07998418-I1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00774317-I1Open ↗