💬 Discuss this project
2017Year Built
2Stories
K2Building Class
R6AZoning
26,733 sfGross Floor Area
9Units
LL97 Covered0 Active Violations
Multi-story retail building (2+) · Owner of record: 262-276 Atlantic Ave · 10,409 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3K Center, 3kcenter-brooklyn8p · 5 filings · 20 docs
Floor 5Five Below2p · 3 filings · 6 docs
Floor 4Five Below2p · 3 filings · 6 docs
Floor 3Five Below2p · 3 filings · 6 docs
Floor 23K Center, 3kcenter-brooklyn +184p · 9 filings · 20 docs
Floor 13K Center, 3kcenter-brooklyn +182p · 10 filings · 20 docs
BasementRw 705 Franklin LLC1p · 1 filing · 2 docs
Site & exteriorRw 705 Franklin LLC6p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RW 705 Franklin4307/08/2026
BW 450 St Marks1207/08/2026
262-272 Atlantic Ave503/22/2026
NYC School Construction Authority303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shenoy Engineering611/11/2022
360 Engineering106/14/2022
JMG Consultants105/06/2022
Kosuri Engineering103/23/2022
Mdszerbaty Associates Architects111/30/2021
Thornton Tomasetti111/24/2021
Allen Shinfeld, P.E209/01/2021
Norman C. Lok, PE307/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Department of Design and Construction803/21/2026
JMG Consultants203/21/2026
Precision 3Sixty NYC203/21/2026
Milrose Consultants203/21/2026
Louis Striar603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A F Fire ProtectionPlumbing403/22/2026
National Enviromental SafetyGeneral Contractor407/08/2026
WCK ElectricElectrical303/22/2026
Core Design & BuildersScaffold303/21/2026
Class One Construction LTGeneral Contractor303/22/2026
Signstar NYCSign hanger307/08/2026
National Enviromental SafetyScaffold203/21/2026
Stanco System Electrical ContElectrical203/22/2026
R.A.M.S. Mechanicalspecialty_contractor203/21/2026
PJP InstallersScaffold203/21/2026
Par Plumbing CoPlumbing107/08/2026
Core Design & BuildersGeneral Contractor107/08/2026
A & F Fire Protection CoFire Protection107/08/2026
Stanco System Electrical ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589711/11/2022
Allen Shinfeld, P.E1305109/01/2021
Building Lifecycle
All (129)Filed (16)Permit Issued (13)Signed Off (13)Violation (46)Inspection (5)Objection (6)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2022
Signed off — Alteration
Provide new DOAS unit and new ductwork with all associated piping. New dedicated exhaust fans and perimeter electric convectors with associated piping. New Split A/C Units with associated piping for SCA K441 3K.
B00603930-I1
12/15/2022
Signed off — Alteration
441K-3K Center - Filing for Seismic HVAC, Pipe, Duct work, Fans in conjunction with NB # 320588627
B00703847-I1
12/13/2022
Permit issued — General Construction
B00703847-I1-GC
12/09/2022
Signed off — Alteration
B00603050-I1
11/30/2022
Special inspection requirement — Interior lighting power
Michael Marchese
11/30/2022
Special inspection requirement — Electrical motors and elevators
Michael Marchese
11/30/2022
Special inspection requirement — Maintenance information
Michael Marchese
11/30/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
11/30/2022
Special inspection requirement — Heating Systems
Michael Marchese
11/30/2022
Special inspection requirement — Final
Michael Marchese
11/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
11/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
11/30/2022
Special inspection requirement — Shutoff dampers
Michael Marchese
11/30/2022
Special inspection requirement — Duct leakage testing, insulation and design
Michael Marchese
11/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
11/30/2022
Special inspection requirement — Lighting controls
Michael Marchese
11/15/2022
Signed off — Alteration
B00603934-I1
11/11/2022
Filed — Alteration
Provide new DOAS unit and new ductwork with all associated piping. New dedicated exhaust fans and perimeter electric convectors with associated piping. New Split A/C Units with associated piping for SCA K441 3K.
B00603930-P3
11/10/2022
Signed off — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00754789-I1
11/01/2022
Signed off — Alteration
Filing herewith for construction fence.
B00697736-I1
10/31/2022
Signed off — Alteration
B00611310-I1
10/21/2022
Special inspection requirement — Heating Systems
Michael Marchese
10/21/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
10/21/2022
Special inspection requirement — Final
Michael Marchese
10/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
10/21/2022
Special inspection requirement — Duct leakage testing, insulation and design
Michael Marchese
10/21/2022
Special inspection requirement — Lighting controls
Michael Marchese
10/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
10/21/2022
Special inspection requirement — Electrical motors and elevators
Michael Marchese
10/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
10/21/2022
Special inspection requirement — Maintenance information
Michael Marchese
10/21/2022
Special inspection requirement — Interior lighting power
Michael Marchese
10/21/2022
Special inspection requirement — Shutoff dampers
Michael Marchese
09/15/2022
Signed off — Alteration
Remove existing sprinkler heads and associated piping and provide new sprinkler heads and piping at the first and second floor for new SCA K441 3K.
B00603936-I1
09/07/2022
Filed — Alteration
Provide new DOAS unit and new ductwork with all associated piping. New dedicated exhaust fans and perimeter electric convectors with associated piping. New Split A/C Units with associated piping for SCA K441 3K.
B00603930-P1
09/02/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/02/2022
Special inspection requirement — Heating Systems
Michael Marchese
09/02/2022
Special inspection requirement — Final
09/02/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
08/30/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2022
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/30/2022
Special inspection requirement — Sprinkler Systems
Michael Marchese
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Scope
08/19/2022
Objection raised — Scope
08/15/2022
Filed — Alteration
Remove existing sprinkler heads and associated piping and provide new sprinkler heads and piping at the first and second floor for new SCA K441 3K.
B00603936-P1
08/05/2022
Special inspection requirement — Sprinkler Systems
Michael Marchese
08/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/27/2022
Violation issued (ECB, closed)
Construction
06/14/2022
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00754789-I1
06/14/2022
Permit issued — Sidewalk Shed
B00754789-I1-SH
06/02/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Scope
05/06/2022
Filed — Alteration
441K-3K Center - Filing for Seismic HVAC, Pipe, Duct work, Fans in conjunction with NB # 320588627
B00703847-I1
04/04/2022
Special inspection requirement — Final
Michael Marchese
03/29/2022
Permit issued — Construction Fence
B00697736-I1-FN
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR.A.M.S. Mechanical12/13/2022
DOB NOWSidewalk ShedSigned-offPJP Installers06/14/2022
DOB NOWConstruction FenceSigned-offNational Enviromental Saf03/29/2022
DOB NOWPlumbingSigned-offPar Plumbing Co03/18/2022
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co03/08/2022
DOB NOWMechanical SystemsSigned-offNational Enviromental Saf02/24/2022
DOB NOWStructuralSigned-offNational Enviromental Saf02/23/2022
DOB NOWGeneral ConstructionSigned-offNational Enviromental Saf02/23/2022
DOB NOWConstruction FenceSigned-offCore Design & Builders09/13/2021
DOB NOWGeneral ConstructionSigned-offCore Design & Builders09/13/2021
DOB NOWSignSigned-offSignstar NYC07/11/2019
DOB NOWSignSigned-offSignstar NYC07/11/2019
DOB NOWSignSigned-offSignstar NYC07/11/2019
BISOTISSUEDCommercial Construction M12/21/2020
BISOTISSUEDCommercial Construction M08/24/2020
BISOTISSUEDClass One Construction LT04/02/2019
BISMHISSUEDClass One Construction LT03/11/2019
BISOTISSUEDClass One Construction LT03/11/2019
BIS—ISSUEDClass One Construction LT03/08/2019
BISEQISSUEDClass One Construction LT03/08/2019
BISMHISSUEDClass One Construction LT03/08/2019
BISSPISSUEDExpert Fire Sprinkler11/07/2018
BISPLISSUEDCape Plumbing08/07/2018
BISMHISSUEDClass One Construction LT07/06/2018
BISEQISSUEDClass One Construction LT02/14/2018
BIS—ISSUEDClass One Construction LT02/14/2018
BISEQISSUEDKings Group NY02/09/2018
BISPLISSUEDCape Plumbing01/24/2018
BIS—ISSUEDClass One Construction LT07/25/2017
BIS—ISSUEDClass One Construction LT06/15/2017
BIS—ISSUEDClass One Construction LT06/15/2017
BISEQISSUEDKings Group NY02/10/2017
BIS—ISSUEDClass One Construction LT01/17/2017
BIS—ISSUEDClass One Construction LT01/17/2017
BISEQISSUEDClass One Construction LT01/13/2017
BIS—ISSUEDClass One Construction LT01/14/2016
BIS—ISSUEDClass One Construction LT01/14/2016
BISEQISSUEDClass One Construction LT01/05/2016
BIS—ISSUEDClass One Construction LT01/05/2016
BIS—ISSUEDClass One Construction LT01/05/2016
+ 4 more permits on file
9 projects · most recent 02/15/2023
General Wiring Lighting
FiledStatusContractorScope
02/15/2023CompleteStanco System Electrical ContGeneral Wiring, Lighting
06/09/2022CompleteStanco System Electrical Cont—
06/22/2021CompleteWCK ElectricGeneral Wiring
11/24/2020CompletePrestige Electrical ContgGeneral Wiring
07/17/2020CompleteRainbow Electric Co—
08/22/2019CompleteWCK ElectricGeneral Wiring
07/29/2019Permit IssuedRobert S. Covello—
12/26/2018CompleteWCK Electric12 meters, 12 new_meters
03/30/2018CompleteJam Electrical—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/30/2022Interior lighting powerMichael Marcheseenergy_progress
11/30/2022Electrical motors and elevatorsMichael Marcheseenergy_progress
11/30/2022Maintenance informationMichael Marcheseenergy_progress
11/30/2022Mechanical SystemsMichael Marchesespecial
11/30/2022Heating SystemsMichael Marchesespecial
11/30/2022FinalMichael Marcheseprogress
11/30/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
11/30/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
11/30/2022Shutoff dampersMichael Marcheseenergy_progress
11/30/2022Duct leakage testing, insulation and designMichael Marcheseenergy_progress
11/30/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
11/30/2022Lighting controlsMichael Marcheseenergy_progress
10/21/2022Heating SystemsMichael Marchesespecial
10/21/2022Mechanical SystemsMichael Marchesespecial
10/21/2022FinalMichael Marcheseprogress
10/21/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
10/21/2022Duct leakage testing, insulation and designMichael Marcheseenergy_progress
10/21/2022Lighting controlsMichael Marcheseenergy_progress
10/21/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
10/21/2022Electrical motors and elevatorsMichael Marcheseenergy_progress
10/21/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
10/21/2022Maintenance informationMichael Marcheseenergy_progress
10/21/2022Interior lighting powerMichael Marcheseenergy_progress
10/21/2022Shutoff dampersMichael Marcheseenergy_progress
09/02/2022Heating SystemsMichael Marchesespecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
3K CenterEducationFloors 1, 2
Project B00703847 Alteration · LOC Issued · 05/06/2022
3kcenter-brooklynEducationFloors 1, 2
Project B00603050 Alteration · LOC Issued · 11/30/2021
Five BelowRetailFloors 1–5
Project B00181150 Alteration · LOC Issued · 07/02/2019
Project B00181156 Alteration · LOC Issued · 07/02/2019
Project B00181162 Alteration · LOC Issued · 07/02/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 403 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
09/01/2026B00585251-I1Request digital key ↗
09/01/2026B00586661-I1Request digital key ↗
08/31/2026B00603930-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/02/2026B00181156-I1Request digital key ↗
09/02/2026B00181150-I1Request digital key ↗
09/02/2026B00181162-I1Request digital key ↗
▸Applications & Permits89
▸BISPLAN / WORK APPROVAL APPLICATION38
05/29/2024320588627Open ↗
11/17/2023320588627Open ↗
10/14/2022320588627Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION32
08/28/2020321076599Open ↗
04/03/2019321450960Open ↗
03/15/2019321076599Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION14
11/01/2022320588627Open ↗
02/21/2020321784342Open ↗
01/21/2020321784342Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-15 - Application for waiver of Builders pavement requirements2
03/02/2018320690604Open ↗
03/02/2018320690604Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/09/2019320588627Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT I- CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY TAX LOT1
05/10/2024320588627Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/30/2024320588627Open ↗
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
08/05/2019321450960Open ↗
08/05/2019321450960Open ↗
06/11/2019320588627Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00585251-I1Open ↗
09/01/2026B00586661-I1Open ↗
08/31/2026B00603930-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026B00703847-I1Open ↗
08/25/2026B00603930-I1Open ↗
08/25/2026B00603930-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00603936-I1Open ↗
08/30/2026B00603930-P3Open ↗
08/28/2026B00603936-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/08/2018321076599Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/08/2018321076599Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment32
▸BISEQUIPMENT USE PERMITS10
04/09/2024320588627Open ↗
04/09/2024320588627Open ↗
04/09/2024320588627Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
02/28/2020321784342Open ↗
02/27/2020321784342Open ↗
03/11/2019321784333Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/09/2024320588627Open ↗
04/09/2024320588627Open ↗
04/09/2024320588627Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
09/11/2018320588627Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/24/2020321727397Open ↗
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
02/21/2020321784342Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/21/2021320588627Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
07/24/2024320588627Open ↗
Showing 1 of 3 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
02/16/2022320588627Open ↗
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
08/30/2019321784342Open ↗
08/30/2019321784342Open ↗
08/02/2019321784342Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/03/2021321076599Open ↗
03/03/2021321076599Open ↗
02/23/2021321076599Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/02/2019320588627Open ↗
06/11/2019321784342Open ↗
04/18/2019321450960Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00603050-I1Open ↗
08/13/2026B00603930-I1Open ↗
08/13/2026B00586661-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/30/2021320588627Open ↗
02/17/2021321076599Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/03/2021321076599Open ↗
03/03/2021321076599Open ↗
02/17/2021321076599Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
05/21/2018321784333Open ↗
Showing 1 of 2 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/30/2021320588627Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISSCHEDULE A - OCCUPANCY / USE18
11/01/2022320588627Open ↗
10/14/2022320588627Open ↗
09/06/2022320588627Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
07/23/2021321784342Open ↗
03/03/2021321076599Open ↗
01/20/2021320588627Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/27/2022320588627Open ↗
01/08/2020320588627Open ↗
01/30/2019340468602Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT8
02/25/2020321727397Open ↗
11/23/2019321784333Open ↗
08/02/2019321784342Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
03/11/2019320588627Open ↗
Showing 1 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/23/2021321784342Open ↗
03/03/2021321076599Open ↗
▸Filing & Intake Forms48
▸BISADDITIONAL INFORMATION23
06/10/2024320588627Open ↗
06/10/2024320588627Open ↗
06/05/2024320588627Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM12
04/20/2020320588627Open ↗
02/25/2020321727397Open ↗
01/08/2020320588627Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET11
11/08/2018321076599Open ↗
11/08/2018321076599Open ↗
Showing 2 of 11 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPROVED STAMPED TOPO FORMS ARE TO REFLECT INTO THE VIRTUAL FOLDER PRIOR TO NEXT TCO RENEWAL.1
04/30/2024320588627Open ↗