← Back
Single or multiple dwelling with stores or offices
274 GRAND STREET
MANHATTAN · BIN 1005582
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
C4-4AZoning
8,768 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 274 GRAND REALTY LLC · 2,192 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionLandscape
Roof1p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 213p · 5 filings · 20 docs
Floor 113p · 5 filings · 20 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
274 GRANDREALTY5507/08/2026
METRO CONTRACTING NY507/08/2026
TIPSY MONK INC.1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GMH ARCHITECTURE203/21/2026
FC CONSULTING ENGINEER403/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L403/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
JKW ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING KONG G/C INCGeneral Contractor1207/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor1107/08/2026
DHC CONTRACTING INCGeneral Contractor603/21/2026
SCAFFTECH LLCGeneral Contractor303/21/2026
AAA TOTAL PLUMBING, INCPlumbing207/08/2026
METRO CONTRACTING NY, INC.General Contractor207/08/2026
KWONG MING ELECTRIC INCElectrical203/22/2026
KB PLUMBING & HEATING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637110/09/2024
FC CONSULTING ENGINEER,PL1958206/10/2024
GM HUANG ARCHITECTURE PLL1398411/13/2023
SANTORA ENGINEERING LLC346112/17/2022
STRUCT. ENGINEERING INTEG4174404/06/2022
Building Lifecycle
All (125)Filed (21)Permit Issued (20)Signed Off (7)Violation (23)Inspection (5)Objection (24)Special Inspection (25)
02/03/2026
Violation issued (FDNY_NOV, closed)
05/19/2025
Violation issued (FDNY_ORDER, closed)
12/20/2024
Signed off — Alteration
EXTERIOR RENOVATION ON EXIST. MIX-USED BUILDING WITH REPLACE STOREFRONT AND INSTALL A NEW AWNING, MINOR POWER WASH FLOOR AND PAINTING WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01124757-I1
11/26/2024
Signed off — Alteration
Application filed for structural work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08053710-I1
10/15/2024
Permit issued — General Construction
M01124757-I1-GC
10/09/2024
Filed — Alteration
EXTERIOR RENOVATION ON EXIST. MIX-USED BUILDING WITH REPLACE STOREFRONT AND INSTALL A NEW AWNING, MINOR POWER WASH FLOOR AND PAINTING WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01124757-I1
07/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM. REPLACEMENT OF EXISTING SPRINKLER HEADS & ADDITIONAL HEADS AS PER PLAN. NO CHANGE IN BUILDING USE, OCCUPANCY AND OR EGRESS.
M00953574-P1
05/07/2024
Permit issued — Sprinklers
M00953574-I1-EW-SP
04/01/2024
Violation issued (HPD, closed)
A
03/29/2024
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM. REPLACEMENT OF EXISTING SPRINKLER HEADS & ADDITIONAL HEADS AS PER PLAN. NO CHANGE IN BUILDING USE, OCCUPANCY AND OR EGRESS.
M00953574-I1
01/09/2024
Signed off — Alteration
SIDEWALK SHED INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00330802-I1
11/21/2023
Signed off — Alteration
Application filed for interior work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08000313-I1
11/13/2023
Filed — Alteration
Application filed for interior work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08000313-P3
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Huang
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
George Huang
11/08/2023
Special inspection requirement — Final
George Huang
11/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
George Huang
11/08/2023
Special inspection requirement — Fenestration areas
George Huang
11/08/2023
Special inspection requirement — Air barrier - visual inspection
George Huang
11/08/2023
Special inspection requirement — Fenestration air leakage
George Huang
09/27/2023
Permit issued — General Construction
M08000313-I1-GC
09/25/2023
Permit issued — General Construction
M08000313-I1-GC
08/31/2023
Permit issued — Construction Fence
M00784957-I1-FN
08/16/2023
Signed off — Alteration
Installation of supported pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00788935-I1
06/22/2023
Permit issued — Construction Fence
M00784957-I1-FN
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Permit issued — Sidewalk Shed
M00330802-I1-SH
01/27/2023
Permit issued — Structural
M08053710-I1-ST
01/12/2023
Filed — Alteration
Installation of supported pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00788935-P1
12/17/2022
Filed — Alteration
Application filed for structural work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08053710-I1
12/14/2022
Special inspection requirement — Structural Cold-Formed Steel
GERARD SANTORA
12/14/2022
Special inspection requirement — Structural Steel - High Strength Bolting
GERARD SANTORA
12/14/2022
Special inspection requirement — Structural Steel - Welding
GERARD SANTORA
12/14/2022
Special inspection requirement — Structural Steel - Details
GERARD SANTORA
12/14/2022
Special inspection requirement — Structural Wood Frame
GERARD SANTORA
12/12/2022
Special inspection requirement — Final
GERARD SANTORA
12/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GERARD SANTORA
12/12/2022
Special inspection requirement — Masonry
GERARD SANTORA
11/23/2022
Violation issued (ECB, closed)
Construction
11/02/2022
Violation issued (HPD, closed)
I
09/30/2022
Permit issued — Supported Scaffold
M00788935-I1-SF
09/29/2022
Filed — Alteration
Installation of supported pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00788935-I1
09/23/2022
Permit issued — General Construction
M08000313-I1-GC
09/21/2022
Filed — Alteration
Application filed for interior work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08000313-P2
09/21/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
George Huang
09/21/2022
Special inspection requirement — Air barrier - visual inspection
George Huang
09/21/2022
Special inspection requirement — Energy Code Compliance Inspections
George Huang
09/21/2022
Special inspection requirement — Final
George Huang
09/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Huang
09/21/2022
Special inspection requirement — Fenestration areas
George Huang
09/21/2022
Special inspection requirement — Fenestration air leakage
George Huang
09/15/2022
Filed — Alteration
Application filed for interior work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08000313-P1
09/13/2022
Filed — Alteration
Application filed for interior work and partial facade repair to address the ECB violation and full vacate order as per plan. Work filed in conjunction with the structural repair application. No change in use, egress, or occupancy under this application
M08000313-I1
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSCAFFTECH LLC10/15/2024
DOB NOWSprinklersSigned-offKB PLUMBING & HEATING INC05/07/2024
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC09/27/2023
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC09/25/2023
DOB NOWConstruction FencePermit IssuedKING KONG G/C INC08/31/2023
DOB NOWConstruction FencePermit IssuedKING KONG G/C INC06/22/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/22/2023
DOB NOWStructuralSigned-offKING KONG G/C INC01/27/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC09/30/2022
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC09/23/2022
DOB NOWConstruction FencePermit IssuedKING KONG G/C INC08/10/2022
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC05/16/2022
DOB NOWSprinklersPermit IssuedAAA TOTAL PLUMBING, INC05/13/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/25/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/08/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/18/2020
DOB NOWConstruction FenceSigned-offALEXANDER CHAN08/01/2018
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.06/07/2018
DOB NOWConstruction FenceSigned-offALEXANDER CHAN05/16/2018
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.02/07/2018
BISPLISSUEDAAA TOTAL PLUMBING, INC09/23/2019
BISOTISSUEDHAPPY HOUSE CONSTRUCTION08/30/2019
BISPLISSUEDCROSSFIELD PLBG.&HTG11/14/2018
BISOTISSUEDDHC CONTRACTING INC07/31/2018
BISFPISSUEDPINNACLE PLBG & HTG CORP06/06/2018
BISPLISSUEDAAA TOTAL PLUMBING, INC05/30/2018
BISOTISSUEDBRIGHTON CONTRACTORS INC04/17/2018
BISPLISSUEDAAA TOTAL PLUMBING, INC03/09/2018
BISMHISSUEDDHC CONTRACTING INC02/23/2018
BISPLISSUEDROCK E SMALL PLBG&HTG INC01/30/2018
BISOTISSUEDBRIGHTON CONTRACTORS INC12/18/2017
BISOTISSUEDTSANG CONSTRUCTION, INC01/21/2016
BISOTISSUEDT & P CONSRUCION INC05/04/1998
2 projects · most recent 06/10/2024
FiledStatusContractorScope
06/10/2024Signed-offKB PLUMBING & HEATING INC—
04/06/2022——7 heads
1 project · most recent 04/06/2022
Water/Sanitary
FiledStatusContractorScope
04/06/2022Signed-offAAA TOTAL PLUMBING, INCWater/Sanitary
6 projects · most recent 04/29/2022
General Wiring
FiledStatusContractorScope
04/29/2022Permit IssuedKJK ELECTRIC INCGeneral Wiring
03/18/2020CompleteTOP SHELF ELECTRIC CORP—
09/13/2019CompleteW 8 ELECTRIC CORPGeneral Wiring
06/25/2018CompleteKWONG MING ELECTRIC INCGeneral Wiring
04/24/2018CompleteKWONG MING ELECTRIC INCGeneral Wiring
02/08/2018CompleteMEO ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/08/2023Fire-Resistant Penetrations and JointsGeorge Huangspecial
11/08/2023Energy Code Compliance InspectionsGeorge Huangprogress
11/08/2023FinalGeorge Huangprogress
11/08/2023Fenestration and door U-factor and product ratingsGeorge Huangenergy_progress
11/08/2023Fenestration areasGeorge Huangenergy_progress
11/08/2023Air barrier - visual inspectionGeorge Huangenergy_progress
11/08/2023Fenestration air leakageGeorge Huangenergy_progress
12/14/2022Structural Cold-Formed SteelGERARD SANTORAspecial
12/14/2022Structural Steel - High Strength BoltingGERARD SANTORAspecial
12/14/2022Structural Steel - WeldingGERARD SANTORAspecial
12/14/2022Structural Steel - DetailsGERARD SANTORAspecial
12/14/2022Structural Wood FrameGERARD SANTORAprogress
12/12/2022FinalGERARD SANTORAprogress
12/12/2022Structural Stability – Alterations of existing buildingsGERARD SANTORAspecial
12/12/2022MasonryGERARD SANTORAspecial
09/21/2022Fenestration and door U-factor and product ratingsGeorge Huangenergy_progress
09/21/2022Air barrier - visual inspectionGeorge Huangenergy_progress
09/21/2022Energy Code Compliance InspectionsGeorge Huangprogress
09/21/2022FinalGeorge Huangprogress
09/21/2022Fire-Resistant Penetrations and JointsGeorge Huangspecial
09/21/2022Fenestration areasGeorge Huangenergy_progress
09/21/2022Fenestration air leakageGeorge Huangenergy_progress
05/04/2022Sprinkler SystemsChris Yiuspecial
07/07/2020Public Assembly Emergency LightingChris Yiuprogress
04/30/2018FinalJames Waiprogress
▾Documents — 271 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch13
09/06/2026M00017419-I1Request digital key ↗
09/06/2026M00039635-I1Request digital key ↗
09/02/2026M00784957-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00330802-I1Request digital key ↗
08/15/2026M00330802-P2Request digital key ↗
08/15/2026M00330802-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00366401-I1Request digital key ↗
08/15/2026M00366401-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00366398-P1Request digital key ↗
08/15/2026M00366398-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M00367618-I1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION28
03/07/2022123733576Open ↗
02/22/2022123733576Open ↗
12/23/2020123733576Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION14
09/24/2019123758692Open ↗
09/03/2019123758692Open ↗
11/27/2018123077400Open ↗
Showing 3 of 14 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
05/25/2018123442426Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00017419-I1Open ↗
09/03/2026M00330802-P1Open ↗
09/03/2026M00330802-P2Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/03/2019123758692Open ↗
06/26/2019123733576Open ↗
06/14/2019123758692Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/21/2026M00367618-I1Open ↗
08/28/2026M08000313-P3Open ↗
08/28/2026M08000313-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M00366401-I1Open ↗
08/28/2026M08000313-P3Open ↗
08/25/2026M08000313-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/13/2020123758692Open ↗
02/13/2020123758692Open ↗
02/03/2020123758692Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/14/2019123758692Open ↗
04/26/2018123442391Open ↗
02/20/2018123129881Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/20/2016140450811Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/20/2016140450811Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
06/26/2019123733576Open ↗
06/14/2019123758692Open ↗
07/24/2018123129881Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/09/2019123129881Open ↗
02/20/2018123129881Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/03/2018123442426Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes7
08/12/2020123733576Open ↗
06/14/2019123758692Open ↗
05/25/2018123442426Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/02/2026M00366398-P1Open ↗
08/15/2026M00366398-I1Open ↗
08/13/2026M00366401-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
07/13/2020123733576Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00366398-P1Open ↗
09/01/2026M08000313-P2Open ↗
09/01/2026M08000313-P3Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
08/12/2020123733576Open ↗
06/14/2019123758692Open ↗
05/25/2018123442426Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
09/03/2019123758692Open ↗
06/26/2019123733576Open ↗
06/14/2019123758692Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/29/2019123077400Open ↗
01/09/2019123129881Open ↗
10/01/2018123442391Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/13/2020123733576Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/13/2020123733576Open ↗
01/20/2016140450811Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/09/2019123129881Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE7
12/23/2020123733576Open ↗
11/16/2020123733576Open ↗
10/30/2020123733576Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/29/2019123077400Open ↗
01/09/2019123129881Open ↗
10/03/2018123442426Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/09/2019123129881Open ↗
10/03/2018123442426Open ↗
▸BISSUPERSEDING LETTER1
11/27/2018123077400Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
07/13/2020123733576Open ↗
06/26/2019123733576Open ↗
06/14/2019123758692Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION15
04/04/2022123733576Open ↗
08/12/2020123733576Open ↗
08/12/2020123733576Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM13
03/13/2020123758692Open ↗
02/13/2020123758692Open ↗
02/03/2020123758692Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET7
06/26/2019123733576Open ↗
06/14/2019123758692Open ↗
05/25/2018123442426Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/20/2016140450811Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
04/04/2022123733576Open ↗
08/12/2020123733576Open ↗
08/12/2020123733576Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
01/09/2019123129881Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00017419-I1Open ↗