← Back
Professional building / stand-alone funeral home
2741 3 AVENUE
BRONX · BIN 2000826
💬 Discuss this project
1931Year Built
1Stories
O7Building Class
R6Zoning
12,000 sfGross Floor Area
3Units
2 Open Violations ▸
Professional building / stand-alone funeral home · Owner of record: F & J REALTY CO. LLC · 7,415 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 21p · 1 filing · 10 docs
Floor 1
CellarUnder Construction13p · 4 filings · 20 docs
Basement2p · 1 filing · 10 docs
1 job · most recent 08/29/2023
FiledStatusContractorScope
08/29/2023Permit IssuedAMERICAN STANDARD PLUMBIN13 heads
3 jobs · most recent 07/01/2025
General Wiring
FiledStatusContractorScope
07/01/2025CompleteKOPP ELECTRIC CORP—
06/24/2025Permit IssuedNEW CENTURY ELEC'L CONTRGeneral Wiring
02/05/2025CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
Building Lifecycle
All (73)Filed (5)Permit Issued (5)Signed Off (3)Violation (31)Inspection (12)Objection (2)Special Inspection (15)
09/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Signed off — Alteration
Existing BATHROOM TO BE RENOVATED AND NEW BATHROOM
X00916097-I1
07/16/2025
Signed off — Alteration
Interior partial renovation in existing space, including new X-RAY ultrasound & exam room, including registration area, flooring, doors, lights including registration area, replace existing toiles fixtures and exam room sinks, no change in use, egress and
X00898607-I1
07/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/07/2025
Violation issued (ECB, open)
Unknown
06/07/2025
Violation issued (ECB, closed)
Unknown
05/02/2025
Permit issued — Sprinklers
X00916154-I1-EW-SP
04/23/2025
Signed off — Alteration
Modify Existing ductwork, and provided new Ductwork as per revised architectural layout.
X00916050-I1
04/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
TREVOR O. FLOWERS
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
02/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TREVOR O. FLOWERS
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
02/26/2025
Permit issued — Mechanical Systems
X00916050-I1-MS
02/26/2025
Objection resolved — Addressed
02/25/2025
Objection raised — Other
02/21/2025
Permit issued — Sprinklers
X00916154-I1-EW-SP
02/21/2025
Permit issued — Plumbing
X00916097-I1-PL
02/20/2025
Filed — Alteration
Interior partial renovation in existing space, including new X-RAY ultrasound & exam room, including registration area, flooring, doors, lights including registration area, replace existing toiles fixtures and exam room sinks, no change in use, egress and
X00898607-P1
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VILAS PARAB
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
VILAS PARAB
02/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
VILAS PARAB
02/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VILAS PARAB
05/02/2024
Permit issued — General Construction
X00898607-I1-GC
08/30/2023
Filed — Alteration
Modify Existing ductwork, and provided new Ductwork as per revised architectural layout.
X00916050-I1
08/29/2023
Filed — Alteration
Existing BATHROOM TO BE RENOVATED AND NEW BATHROOM
X00916097-I1
08/29/2023
Filed — Alteration
Installation of New Sprinklers heads and sprinkler piping on Cellar Level.
X00916154-I1
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
08/21/2023
Filed — Alteration
Interior partial renovation in existing space, including new X-RAY ultrasound & exam room, including registration area, flooring, doors, lights including registration area, replace existing toiles fixtures and exam room sinks, no change in use, egress and
X00898607-I1
08/08/2023
Special inspection requirement — Final
TREVOR O. FLOWERS
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
08/08/2023
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
08/08/2023
Special inspection requirement — Sprinkler Systems
TREVOR O. FLOWERS
01/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/18/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRONX CARE - HEALTH SYSTEM1107/08/2026
F & J REALTY CO LLC C/O L203/22/2026
BRONXCARE103/22/2026
BRONX-LEBANON HOSPITAL403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VILAS PARAB202/20/2025
LEGACY ENGINEERS308/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI-STATE CONTRACTING GROGeneral Contractor407/08/2026
KOPP ELECTRIC CORPElectrical103/22/2026
NEW CENTURY ELEC'L CONTRElectrical103/22/2026
NICHOLAS BLASONEElectrical103/21/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection106/28/2026
ABE HIMELFARBElectrical103/21/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARAB ASSOCIATES2876102/20/2025
MCHENERY TESTING LAB9181408/30/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN05/02/2025
DOB NOWMechanical SystemsSigned-offTRI-STATE CONTRACTING GRO02/26/2025
DOB NOWSprinklersPermit IssuedALLSTATE SPRINKLER LLC02/21/2025
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP02/21/2025
DOB NOWGeneral ConstructionSigned-offTRI-STATE CONTRACTING GRO05/02/2024
BISPLISSUEDROOTER PLUS, INC11/01/2010
BISOTISSUEDDES INTERIORS, INC10/13/2010
BISPLISSUEDWILLIAM C. GERAKARIS P&H12/18/2007
BISOTISSUEDNICOR CONSTRUCTION INC12/12/2007
BIS—ISSUEDFLINTLOCK CONSTRUCTION INC.03/15/1996
BISMHISSUEDARCTIC AIR CONDITIONING SYSTEMS03/14/1996
BISOTISSUEDHUGHES CONTRACTING INC, LTD.03/14/1996
BISPLISSUEDSMART PLBG & HTG CORP01/12/1996
BISEQISSUEDFLINTLOCK CONSTRUCTION INC.12/27/1995
BISOTISSUEDFLINTLOCK CONSTRUCTION INC.12/22/1995
BISEQISSUEDFLINTLOCK CONSTRUCTION INC.11/03/1995
BISOTISSUEDFLINTLOCK CONSTRUCTION , INC.11/03/1995
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/28/2025Fire-Resistance Rated ConstructionTREVOR O. FLOWERSprogress
02/28/2025Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
02/28/2025Structural Stability – Alterations of existing buildingsTREVOR O. FLOWERSspecial
02/28/2025Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
02/12/2025Fire-Resistant Penetrations and JointsVILAS PARABspecial
02/12/2025Energy Code Compliance InspectionsVILAS PARABprogress
02/12/2025Fire-Resistance Rated ConstructionVILAS PARABprogress
02/12/2025Structural Stability – Alterations of existing buildingsVILAS PARABspecial
08/24/2023Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
08/08/2023FinalTREVOR O. FLOWERSprogress
08/08/2023Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
08/08/2023Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
08/08/2023Mechanical SystemsTREVOR O. FLOWERSspecial
08/08/2023Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
08/08/2023Sprinkler SystemsTREVOR O. FLOWERSspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026X00916097-I1Request digital key ↗
08/22/2026X00916154-I1Request digital key ↗
08/22/2026X00916154-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
10/10/2017220587906Open ↗
09/23/2010220079554Open ↗
09/01/2010220079554Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
11/03/2010220079554Open ↗
10/14/2010220079554Open ↗
12/12/2007210026130Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026X00916154-I1Open ↗
08/22/2026X00916154-P2Open ↗
08/22/2026X00916050-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00916050-I1Open ↗
08/31/2026X00916154-I1Open ↗
08/31/2026X00898607-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026X00916050-I1Open ↗
08/31/2026X00916154-I1Open ↗
08/31/2026X00898607-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/10/2017220587906Open ↗
09/03/2010220079554Open ↗
12/07/2007210026130Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/07/2007210026130Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/07/2007210026130Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
09/03/2010220079554Open ↗
12/07/2007210026130Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
02/24/2011220079554Open ↗
11/29/2010220079554Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/10/2017220587906Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/03/2010220079554Open ↗
12/07/2007210026130Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/10/2017220587906Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
09/01/2010220079554Open ↗
12/07/2007210026130Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/10/2017220587906Open ↗
09/03/2010220079554Open ↗
12/12/2007210026130Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/10/2017220587906Open ↗
09/01/2010220079554Open ↗