← Back
Elevator apt, semi-fireproof with stores
2739 CRESTON AVENUE
BRONX · BIN 2129724
💬 Discuss this project
2022Year Built
9Stories
D7Building Class
R8Zoning
31,184 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 2741 CRESTON LLC · 5,012 sf lot · 6.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof7p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 95p · 3 filings · 20 docs
Floor 8
Floor 7
Floor 689p · 1 filing · 20 docs
Floor 596p · 4 filings · 20 docs
Floor 491p · 2 filings · 20 docs
Floor 391p · 2 filings · 20 docs
Floor 293p · 4 filings · 20 docs
Floor 197p · 5 filings · 20 docs
Cellar96p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1607/08/2026
2741 CRESTON403/22/2026
PLATINUM MANAGEMENT GROUP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2021$900K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2203/21/2026
A1 EXPEDITING SERVICE CORP.1103/21/2026
JM ZONING, LLC.2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOLEX.GC CORPGeneral Contractor3607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
MPI PLUMBING CORPPlumbing207/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
T & T ELECTRICAL CORP.Electrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641711/24/2023
AR-TECH ENGINEERING, P.C.6659107/29/2022
ASE ENGINEERING PLLC5785104/01/2022
Building Lifecycle
All (200)Filed (38)Permit Issued (25)Signed Off (13)Violation (2)Inspection (18)Objection (74)Special Inspection (30)
06/16/2025
Violation issued (HPD, closed)
A
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/14/2024
Filed — Alteration CO
HUB Consultation Accepted - Filing no work application to update the schedule of occupancy to update occupant load for Day Care originally approved under NB: X00518497
X00991477-P4
06/05/2024
Filed — Alteration CO
HUB Consultation Accepted - Filing no work application to update the schedule of occupancy to update occupant load for Day Care originally approved under NB: X00518497
X00991477-P3
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2024
Permit issued — General Construction
X00991477-I1-GC
02/07/2024
Filed — Alteration CO
HUB Consultation Accepted - Filing no work application to update the schedule of occupancy to update occupant load for Day Care originally approved under NB: X00518497
X00991477-P1
02/05/2024
Objection resolved — Addressed
02/05/2024
Objection resolved — Addressed
02/05/2024
Objection resolved — Addressed
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
01/30/2024
Filed — Alteration CO
HUB Consultation Accepted - Filing no work application to update the schedule of occupancy to update occupant load for Day Care originally approved under NB: X00518497
X00991477-I1
11/29/2023
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
11/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
11/29/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
11/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
11/29/2023
Special inspection requirement — Maintenance information
JUAN GOMEZ
11/29/2023
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
11/29/2023
Special inspection requirement — Lighting controls
JUAN GOMEZ
11/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
11/29/2023
Special inspection requirement — Interior lighting power
JUAN GOMEZ
11/29/2023
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
11/29/2023
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
11/29/2023
Special inspection requirement — Fenestration areas
JUAN GOMEZ
11/29/2023
Special inspection requirement — Metering
JUAN GOMEZ
11/29/2023
Special inspection requirement — Air barrier — testing
JUAN GOMEZ
11/29/2023
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
11/29/2023
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
11/29/2023
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
11/24/2023
Filed — New Building
Application filed to construct nine story mixed use new building as per plans filed.
X00518497-P6
11/24/2023
Special inspection requirement — Fenestration areas
JUAN GOMEZ
11/24/2023
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
11/24/2023
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
11/24/2023
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
11/24/2023
Special inspection requirement — Lighting controls
JUAN GOMEZ
11/24/2023
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
11/24/2023
Special inspection requirement — Metering
JUAN GOMEZ
11/24/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
11/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
11/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
11/24/2023
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
07/27/2023
Signed off — Alteration
P1 filed to revise owner attestation in order to add 8 occupied units during construction.
X00526783-I1
07/21/2023
Signed off — Alteration
Installation of combination Sprinkler/standpipe with fire pump application as per plans filed. Filed in conjunction with NB# X00518497
X00526616-I1
07/18/2023
Objection resolved — Addressed
07/07/2023
Signed off — Alteration
Mechanical systems application as per plans filed. Filed in conjunction with NB# X00518497
X00528782-I1
07/06/2023
Filed — Alteration
Installation of combination Sprinkler/standpipe with fire pump application as per plans filed. Filed in conjunction with NB# X00518497
X00526616-P2
07/05/2023
Violation issued (ECB, closed)
Construction
07/03/2023
Objection raised — Other
06/30/2023
Filed — Alteration
P1 filed to revise owner attestation in order to add 8 occupied units during construction.
X00526783-P3
06/07/2023
Signed off — Alteration
Fence application as per plans filed
X00618030-I1
06/05/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Other
06/01/2023
Filed — New Building
Application filed to construct nine story mixed use new building as per plans filed.
X00518497-P5
05/19/2023
Signed off — Alteration
Install temporary dry Standpipe during construction as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# X00518497
X00531905-I1
05/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2023
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP02/12/2024
DOB NOWPlumbingSigned-offYG SERVICES INC04/17/2023
DOB NOWMechanical SystemsSigned-offBOLEX.GC CORP01/03/2023
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP12/20/2022
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP12/02/2022
DOB NOWFoundationSigned-offBOLEX.GC CORP11/09/2022
DOB NOWStructuralSigned-offBOLEX.GC CORP10/20/2022
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP06/02/2022
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP06/01/2022
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP05/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/01/2022
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP02/14/2022
DOB NOWStandpipeSigned-offPRIME PIPING & HEATING IN02/08/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/08/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/08/2022
DOB NOWMechanical SystemsSigned-offBOLEX.GC CORP02/02/2022
DOB NOWPlumbingSigned-offYG SERVICES INC02/01/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/26/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/26/2022
DOB NOWEarth WorkSigned-offBOLEX.GC CORP11/18/2021
DOB NOWSupport of ExcavationSigned-offBOLEX.GC CORP11/17/2021
DOB NOWStructuralSigned-offBOLEX.GC CORP11/17/2021
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP11/15/2021
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP08/31/2021
4 projects · most recent 06/24/2023
General Wiring
FiledStatusContractorScope
06/24/2023CompleteT & T ELECTRICAL CORP.General Wiring
02/02/2023CompleteVILLAGE ELECTL CONTRS INC—
07/15/2022CompleteTUXEDO ELEC'L CONTR'G INC—
02/01/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
04/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/24/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/20/2023Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
04/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/07/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/27/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
11/29/2023Fenestration air leakageJUAN GOMEZenergy_progress
11/29/2023Maintenance informationJUAN GOMEZenergy_progress
11/29/2023Lighting controlsJUAN GOMEZenergy_progress
11/29/2023Air barrier - visual inspectionJUAN GOMEZenergy_progress
11/29/2023Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
11/29/2023Lighting in dwelling unitsJUAN GOMEZenergy_progress
11/29/2023MeteringJUAN GOMEZenergy_progress
11/29/2023Fenestration areasJUAN GOMEZenergy_progress
11/29/2023Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
11/29/2023Insulation placement and R valuesJUAN GOMEZenergy_progress
11/29/2023Interior lighting powerJUAN GOMEZenergy_progress
11/29/2023Protection of exposed foundation insulationJUAN GOMEZenergy_progress
11/29/2023Exterior lighting powerJUAN GOMEZenergy_progress
11/29/2023Air barrier — testing JUAN GOMEZenergy_progress
11/29/2023Fire-Resistance Rated ConstructionJUAN GOMEZprogress
11/29/2023Energy Code Compliance InspectionsJUAN GOMEZprogress
11/29/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
11/24/2023Interior lighting powerJUAN GOMEZenergy_progress
11/24/2023Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
11/24/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
11/24/2023Energy Code Compliance InspectionsJUAN GOMEZprogress
11/24/2023Fire-Resistance Rated ConstructionJUAN GOMEZprogress
11/24/2023Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
11/24/2023MeteringJUAN GOMEZenergy_progress
11/24/2023Exterior lighting powerJUAN GOMEZenergy_progress
Latest 25 of 135.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/25/2026X00531905-I1Request digital key ↗
08/25/2026X00532484-I1Request digital key ↗
08/25/2026X00532031-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZoning Exhibit form (1-5)10
08/23/2026X00518497-P3Open ↗
08/21/2026X00991477-I1Open ↗
08/21/2026X00991477-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/23/2026X00518497-P3Open ↗
08/15/2026X00518497-P1Open ↗
08/15/2026X00518497-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications143
▸DOB NOWProgress Inspector Seal & Signature78
09/28/2026X00528782-P1Open ↗
09/28/2026X00528782-P1Open ↗
09/01/2026X00532479-P1Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/25/2026X00531905-I1Open ↗
08/25/2026X00532031-I1Open ↗
08/25/2026X00532031-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/28/2026X00528782-P1Open ↗
09/23/2026X00531905-I1Open ↗
09/01/2026X00532479-P1Open ↗
Showing 3 of 27 on file for this type
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/23/2026X00518497-P3Open ↗
08/15/2026X00518497-P1Open ↗
08/15/2026X00518497-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/23/2026X00518497-P3Open ↗
08/23/2026X00518497-P6Open ↗
08/15/2026X00518497-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Trees Site Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Sign Off2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms2
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026X00668785-P1Open ↗
08/16/2026X00668785-P2Open ↗
▸Other Documents22
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/23/2026X00518497-P3Open ↗
08/15/2026X00518497-P1Open ↗
08/15/2026X00518497-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/23/2026X00518497-P3Open ↗
08/15/2026X00518497-P5Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026X00991477-I1Open ↗
08/21/2026X00991477-P1Open ↗
08/21/2026X00991477-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFinal Survey2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSURVEY: INITIAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type