← Back
BuildNYC
One story - permanent living quarter
2742 WOODHULL AVENUE
BRONX · Pelham Gardens · BIN 2054605
💬 Discuss this project
1930Year Built
1.75Stories
A2Building Class
R4-1Zoning
—Gross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: 1308 Adar · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAlteration of existing residential building to two-familyUnder Construction2p · 1 filing · 20 docs
Site & exteriorAlteration of existing residential building to two-familyUnder Construction35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1308 Adar203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Banji Awosika Architect309/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A InternationalGeneral Contractor103/21/2026
Mod ConsultantsScaffold109/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Banji Awosika Architect P2721208/04/2026
Building Lifecycle
09/24/2026
Permit issued — Construction Fence
X01346971-S2-FN
09/02/2026
Filed — Alteration CO
ALTERATION OF EXISTING 2-STORY 2-FAMILY HOUSE WITH HORIZONTAL AND VERTICAL ADDITION TO CONVERT TO 2-FAMILY HOUSE
X01346971-S2
08/04/2026
Filed — Alteration CO
ALTERATION OF EXISTING 2-STORY 2-FAMILY HOUSE WITH HORIZONTAL AND VERTICAL ADDITION TO CONVERT TO 2-FAMILY HOUSE
X01346971-S1
08/03/2026
Special inspection requirement — Permanent certificate
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLABANJI AWOSIKA
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMod Consultants09/24/2026
BISOTISSUEDA. International02/16/2001
1 project · most recent 09/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/02/2026Permit IssuedMod ConsultantsHeating and Air Conditioning Systems
1 project · most recent 09/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/02/2026——Storm, Water/Sanitary
1 project · most recent 09/02/2026
Concrete Wood
FiledStatusContractorScope
09/02/2026Permit IssuedMod ConsultantsConcrete, Wood
1 project · most recent 09/02/2026
Fence
FiledStatusContractorScope
09/02/2026Permit IssuedMod ConsultantsFence
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/03/2026Permanent certificate—energy_progress
08/03/2026Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
08/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOLABANJI AWOSIKAspecial
08/03/2026Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
08/03/2026HVAC-R and service water heating system controls—energy_progress
08/03/2026HVAC-R and service water piping design and insulation—energy_progress
08/03/2026HVAC-R and service water heating equipment—energy_progress
08/03/2026Metering—energy_progress
08/03/2026Maintenance information—energy_progress
04/22/2026Duct leakage testing, insulation and designOLABANJI AWOSIKAenergy_progress
01/15/2026Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
01/15/2026Fire-Resistance Rated ConstructionOLABANJI AWOSIKAprogress
01/15/2026Structural Wood FrameOLABANJI AWOSIKAprogress
01/15/2026Permanent certificate—energy_progress
01/15/2026Air barrier — testing OLABANJI AWOSIKAenergy_progress
01/15/2026Protection of exposed foundation insulationOLABANJI AWOSIKAenergy_progress
01/15/2026Interior lighting powerOLABANJI AWOSIKAenergy_progress
01/15/2026Ventilation and air distribution systemOLABANJI AWOSIKAenergy_progress
01/15/2026HVAC-R and service water heating equipment—energy_progress
01/15/2026Excavations - Sheeting, Shoring, and BracingOLABANJI AWOSIKAspecial
01/15/2026Lighting in dwelling unitsOLABANJI AWOSIKAenergy_progress
01/15/2026Air barrier - visual inspection—energy_progress
01/15/2026HVAC-R and service water heating system controls—energy_progress
01/15/2026Maintenance informationOLABANJI AWOSIKAenergy_progress
01/15/2026Fenestration air leakage—energy_progress
Latest 25 of 39.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account