← Back
BuildNYC
Over six families without stores
2744 BEDFORD AVENUE
BROOKLYN · BIN 3121522
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R4AZoning
32,000 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized79 Active Violations 78 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 2744 Bedford Avenue · 10,000 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 6 docs
Floor 2Unit 2D6p · 2 filings · 13 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2744 Bedford Ave503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering & Surveying206/15/2026
Lucid Building Engineering212/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
K M DOB Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pro-Serve ConstructionGeneral Contractor303/21/2026
Fast Track Electricspecialty_contractor307/08/2026
Ramapo Communicationspecialty_contractor303/21/2026
CK Plumbing & MechanicalPlumbing107/08/2026
Agee Heating ServicePlumbing111/07/2016
Sac WirelessGeneral Contractor105/25/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering106306/15/2026
Lucid Building Engineering8196312/18/2023
Building Lifecycle
08/27/2026
Signed off — Alteration
Modification to existing VERIZON site. Install 3 antennas, relocate 2 antennas, replace 6 RRHs, and install a new platform with cabinets on the roof.
B00618072-I1
07/08/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Scope
06/15/2026
Filed — Alteration
Modification to existing VERIZON site. Install 3 antennas, relocate 2 antennas, replace 6 RRHs, and install a new platform with cabinets on the roof.
B00618072-P1
06/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
223 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offFast Track Electric09/12/2025
DOB NOWAntennaSigned-offFast Track Electric08/13/2025
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical12/27/2023
DOB NOWGeneral ConstructionSigned-offPro-Serve Construction11/30/2023
DOB NOWAntennaSigned-offRamapo Communication12/21/2022
BISOTISSUEDSac Wireless05/25/2017
BISPLISSUEDAgee Heating Service11/07/2016
BISFSISSUEDAmerican Boiler & Welding05/31/2016
BISBLISSUEDAmerican Boiler & Welding01/07/2016
1 project · most recent 02/29/2024
General Wiring
FiledStatusContractorScope
02/29/2024Permit IssuedVoltron ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/16/2023Tenant Protection Plan ComplianceYUNHO LEEspecial
11/16/2023Fire-Resistant Penetrations and JointsYUNHO LEEspecial
11/16/2023Energy Code Compliance InspectionsYUNHO LEEprogress
11/16/2023FinalYUNHO LEEprogress
11/16/2023Interior lighting powerYUNHO LEEenergy_progress
11/16/2023Lighting controlsYUNHO LEEenergy_progress
11/16/2023Tenant Protection Plan ComplianceYUNHO LEEspecial
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account