← Back
Four families
2747 BRONXWOOD AVENUE
BRONX · Allerton · BIN 2053809
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6Zoning
3,400 sfGross Floor Area
4Units
Rent Stabilized46 Open Violations 45 unresolved · 1 paperwork only ▸
Four families · 3,117 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 29p · 1 filing · 17 docs
Floor 18p · 1 filing · 17 docs
Cellar10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT405/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor207/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513405/24/2023
Building Lifecycle
All (107)Filed (4)Permit Issued (3)Signed Off (2)Violation (60)Inspection (8)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, closed)
I
04/02/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, closed)
I
10/16/2023
Signed off — Alteration
INTERIOR RENOVATION OF 2-STORY MULTI-DWELLING BUILDING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X00717442-I1
06/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/23/2023
Permit issued — General Construction
X00717442-I1-GC
06/23/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/14/2023
Signed off — Alteration
FILED FOR PLUMBING WORK FOR AN EXISTING TWO-STORY 4-FAMILY BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
X00788495-I1
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
05/25/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
05/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
05/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
05/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
05/25/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
05/25/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
05/25/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
05/25/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
05/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
05/24/2023
Filed — Alteration
INTERIOR RENOVATION OF 2-STORY MULTI-DWELLING BUILDING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X00717442-P2
05/24/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
05/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/24/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
05/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
05/24/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
05/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
05/24/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
05/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
05/24/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
05/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
05/24/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
05/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/16/2023
Violation issued (HPD, open)
A
04/16/2023
Violation issued (HPD, open)
B
04/16/2023
Violation issued (HPD, closed)
C
04/16/2023
Violation issued (HPD, open)
B
04/16/2023
Violation issued (HPD, open)
B
04/16/2023
Violation issued (HPD, open)
B
03/27/2023
Filed — Alteration
INTERIOR RENOVATION OF 2-STORY MULTI-DWELLING BUILDING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X00717442-P1
03/24/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
03/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/24/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/24/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
03/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/16/2023
Violation issued (HPD, open)
A
03/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/04/2022
Violation issued (HPD, closed)
I
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/11/2022
Permit issued — Plumbing
X00788495-I1-PL
08/09/2022
Filed — Alteration
FILED FOR PLUMBING WORK FOR AN EXISTING TWO-STORY 4-FAMILY BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
X00788495-I1
06/22/2022
Permit issued — General Construction
X00717442-I1-GC
06/15/2022
Filed — Alteration
INTERIOR RENOVATION OF 2-STORY MULTI-DWELLING BUILDING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X00717442-I1
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC06/23/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/11/2022
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC06/22/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/23/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
05/25/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/25/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
05/25/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
05/25/2023Fenestration areasDEZHANG FANGenergy_progress
05/25/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
05/25/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
05/25/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
05/25/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
05/25/2023Maintenance informationDEZHANG FANGenergy_progress
05/25/2023Interior lighting powerDEZHANG FANGenergy_progress
05/25/2023Fenestration air leakageDEZHANG FANGenergy_progress
05/25/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
05/24/2023Interior lighting powerDEZHANG FANGenergy_progress
05/24/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/24/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
05/24/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
05/24/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
05/24/2023Maintenance informationDEZHANG FANGenergy_progress
05/24/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
05/24/2023Fenestration areasDEZHANG FANGenergy_progress
05/24/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
05/24/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
05/24/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
05/24/2023Fenestration air leakageDEZHANG FANGenergy_progress
03/24/2023Maintenance informationDEZHANG FANGenergy_progress
Latest 25 of 37.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00788495-I1Request digital key ↗
08/23/2026X00717442-I1Request digital key ↗
08/23/2026X00717442-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00717442-P2Open ↗
09/01/2026X00717442-P2Open ↗
08/31/2026X00717442-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00788495-I1Open ↗
08/13/2026X00717442-P2Open ↗
08/13/2026X00717442-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00717442-P2Open ↗
08/31/2026X00717442-P1Open ↗
08/28/2026X00717442-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00717442-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00717442-I1Open ↗