Office only, 2-6 stories
275 20 STREET
BROOKLYN · BIN 3017170
💬 Discuss this project
1930Year Built
4Stories
O2Building Class
R6BZoning
15,200 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: 275 20TH STREET LLC · 5,500 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction58p · 1 filing · 20 docs
Floor 5Under Construction76p · 1 filing · 20 docs
Floor 4Under Construction80p · 1 filing · 20 docs
Floor 3Under Construction79p · 1 filing · 20 docs
Floor 2Under Construction77p · 1 filing · 20 docs
Floor 1Under Construction81p · 1 filing · 20 docs
CellarUnder Construction82p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDERS GROUP304/09/2026
XYZ TWO WAY RADIO SERVICE303/22/2026
YXZ REALTY CO203/22/2026
275 20TH STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2025$6.3M—— → —$418/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE908/07/2026
NIKOLAI KATZ ARCHITECT502/24/2026
CHUN ENGINEERING CONSULTANT PLLC601/13/2026
MOHAMMAD AHEAD212/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3403/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor1007/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor204/09/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161908/07/2026
MOHAMMAD AHEAD - PROFESSI9286107/11/2025
Building Lifecycle
All (155)Filed (22)Permit Issued (16)Signed Off (5)Violation (48)Inspection (13)Objection (21)Special Inspection (30)
09/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2026
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-A7
08/06/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/06/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
07/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2026
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-S1
06/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2026
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-S7
06/24/2026
Signed off — Alteration
B01253406-I1
06/24/2026
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-S5
06/18/2026
Permit issued — Sprinklers
B01048395-S4-EW-SP
06/15/2026
Permit issued — Plumbing
B01048395-S2-PL
06/11/2026
Signed off — Alteration
B01339959-I1
05/28/2026
Objection resolved — Addressed
05/20/2026
Objection raised — Other
05/18/2026
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-A6
05/14/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/14/2026
Special inspection requirement — Final
FAHAD FATEH
05/14/2026
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/14/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/14/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/01/2026
Special inspection requirement — Metering
FAHAD FATEH
05/01/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/01/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/01/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/01/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/01/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/01/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/01/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/01/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/01/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/28/2026
Objection resolved — Resolved
04/03/2026
Objection raised — Admin
03/31/2026
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-A3
03/15/2026
Objection raised — Other
03/10/2026
Permit issued — Construction Fence
B01048395-S1-FN
03/05/2026
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-A2
02/24/2026
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01048395-I1
B01048395-P8
02/18/2026
Permit issued — Supported Scaffold
B01339959-I1-SF
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC06/18/2026
DOB NOWPlumbingPermit IssuedB&B MECH PLBG & HTG LLC06/15/2026
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA03/10/2026
DOB NOWSupported ScaffoldSigned-offBUILDERS GROUP USA02/18/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA01/02/2026
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL09/02/2025
DOB NOWSupported ScaffoldSigned-offDYNAMIX SCAFFOLD GROUP LL09/02/2025
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC06/20/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC06/17/2025
DOB NOWFoundationSigned-offBUILDERS GROUP USA06/16/2025
DOB NOWFoundationSigned-offBUILDERS GROUP USA06/12/2025
DOB NOWStructuralSigned-offBUILDERS GROUP USA05/29/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA05/08/2025
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA04/21/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA03/06/2025
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA03/04/2025
BISPLISSUEDS. WACHTEL PLBG & HTG INC08/02/2011
BISMHISSUEDKOOL RITE COOLING CORP07/21/2011
1 project · most recent 08/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF12AXVJU 21,600 BTU · Heat Pump Outdoor ×56
2MXL18WMVJU9 18,500 BTU · Heat Pump Outdoor ×46
RXTQ48TAVJUA 49,500 BTU · Vrf Outdoor ×4
RZQ36TBVJUA 40,000 BTU · Vrf Outdoor ×2
1 project · most recent 08/07/2026
Sprinkler System
FiledStatusContractorScope
08/07/2026Permit IssuedTARGET PIPING NY LLCSprinkler System
1 project · most recent 08/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026Permit IssuedTARGET PIPING NY LLCGas, Storm, Water/Sanitary
2 projects · most recent 01/19/2026
General Wiring
FiledStatusContractorScope
01/19/2026CompleteHIGH QUALITY ELEC.OF NYC—
07/01/2025Permit IssuedFRIED ELECTRIC CO.General Wiring
1 project · most recent 08/07/2026
Steel
FiledStatusContractorScope
08/07/2026Permit IssuedTARGET PIPING NY LLCSteel
1 project · most recent 08/07/2026
Fence
FiledStatusContractorScope
08/07/2026Permit IssuedTARGET PIPING NY LLCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 127
DateRequirementInspectorRole
08/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/06/2026Sprinkler SystemsFAHAD FATEHspecial
08/06/2026Post-installed AnchorsFAHAD FATEHspecial
05/14/2026Shutoff dampersFAHAD FATEHenergy_progress
05/14/2026Post-installed AnchorsFAHAD FATEHspecial
05/14/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/14/2026Mechanical SystemsFAHAD FATEHspecial
05/14/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/14/2026FinalFAHAD FATEHprogress
05/14/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/14/2026Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
05/14/2026Maintenance informationFAHAD FATEHenergy_progress
05/14/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/14/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/14/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/01/2026Maintenance informationFAHAD FATEHenergy_progress
05/01/2026Interior lighting powerFAHAD FATEHenergy_progress
05/01/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/01/2026MeteringFAHAD FATEHenergy_progress
05/01/2026Lighting controlsFAHAD FATEHenergy_progress
05/01/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/01/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/01/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/01/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
Latest 25 of 127.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/21/2026B01253406-I1Request digital key ↗
08/19/2026B01339959-I1Request digital key ↗
08/17/2026B01048395-S6Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
02/06/2026320829476Open ↗
08/02/2013320829476Open ↗
10/04/2011320324859Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
08/08/2011320324859Open ↗
07/21/2011320324859Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/21/2026B01253406-I1Open ↗
08/19/2026B01339959-I1Open ↗
08/17/2026B01048395-A3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026B01048395-A3Open ↗
09/02/2026B01048395-A3Open ↗
09/01/2026B01048395-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026B01048395-A3Open ↗
09/01/2026B01048395-P4Open ↗
09/01/2026B01048395-S3Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/07/2011320324859Open ↗
11/07/2011320324859Open ↗
11/07/2011320324859Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/02/2013320829476Open ↗
08/02/2013320829476Open ↗
08/02/2013320829476Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/02/2013320829476Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
08/02/2013320829476Open ↗
06/28/2011320324859Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/28/2011320324859Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/14/2011320324859Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026B01048395-P8Open ↗
08/13/2026B01048395-P5Open ↗
08/13/2026B01048395-P1Open ↗
Showing 3 of 4 on file for this type
▸BISST-1 Street Tree Checklist1
08/02/2013320829476Open ↗
▸BISSTREET TREE CHECKLIST1
06/28/2011320324859Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/17/2026B01048395-A7Open ↗
08/17/2026B01048395-A3Open ↗
08/15/2026B01048395-A6Open ↗
Showing 3 of 19 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/02/2013320829476Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY3
11/07/2011320324859Open ↗
07/21/2011320324859Open ↗
06/28/2011320324859Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/02/2013320829476Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
08/02/2013320829476Open ↗
06/28/2011320324859Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
10/28/2011320324859Open ↗
11/07/2011320324859Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/02/2013320829476Open ↗
11/07/2011320324859Open ↗
06/28/2011320324859Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/02/2013320829476Open ↗
06/28/2011320324859Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026B01048395-I1Open ↗
08/13/2026B01048395-P5Open ↗
08/13/2026B01048395-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01048395-S7Open ↗