RoofUnder Construction149p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
TEMPORARY HOIST RUN-BACK STRUCTURE FOR CARS C, D, E, & F, DURING NB CONST, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP.
On file for this project
13 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 15 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Bulkhead6p · 1 filing · 20 docs
DMMechanical
PARTIAL DEMOLITION MEANS AND METHODS OF 1 AND 2 STORY PODIUM STRUCTURES, FACADE AND SLAB OPENINGS FOR HOIST INSTALL ON TOWER, AND OCCUPANT PROTECTION PLAN AS PER PLANS. FULL DEMO FILED SEPARATELY UNDER 322105422.
On file for this project
35 documents · 6 drawing sheets
Floor 22Under Construction136p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 13 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Floor 21Under Construction40p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 4 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Floor 20Under Construction43p · 2 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Floor 19Under Construction43p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Floor 18Under Construction43p · 2 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Floor 17Under Construction43p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Use of Mini Crane for facade construction. This application is filed in conjunction with NB B00939362
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 16Under Construction43p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Use of Mini Crane for facade construction. This application is filed in conjunction with NB B00939362
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 15Under Construction44p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 14Under Construction44p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 13Under Construction44p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 12Under Construction207p · 7 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 11Under Construction44p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 10Under Construction207p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 9Under Construction207p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 8Under Construction208p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Support of excavation for the proposed new building.
On file for this project
239 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 7Under Construction44p · 10 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY HOIST RUN-BACK STRUCTURE FOR CARS C, D, E, & F, DURING NB CONST, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP.
On file for this project
13 documents · 1 drawing sheet
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Support of excavation for the proposed new building.
On file for this project
239 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 6Under Construction207p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
EQUIPMENT USE NORTH CARS (A&B): DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
15 documents · 1 drawing sheet
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5Under Construction38p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
EQUIPMENT USE NORTH CARS (A&B): DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
15 documents · 1 drawing sheet
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4Under Construction38p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
EQUIPMENT USE NORTH CARS (A&B): DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
15 documents · 1 drawing sheet
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3Under Construction38p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
EQUIPMENT USE NORTH CARS (A&B): DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
15 documents · 1 drawing sheet
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2Under Construction40p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
EQUIPMENT USE NORTH CARS (A&B): DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
15 documents · 1 drawing sheet
RUNBACK STRUCTURE FOR CARS A&B: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction129p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Support of excavation for the proposed new building.
On file for this project
239 documents · 5 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents
Latest 3 of 6 filings on this floor.
Mezzanine2p · 1 filing · 7 docs
ArchitectureDM
Installation and use of debris chute as per plans filed herewith. This application is filed in conjunction with Partial DM B00673543 & DM-322105422.
On file for this project
7 documents · 2 drawing sheets
CellarUnder Construction154p · 5 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe · Supported Scaffold
Support of excavation for the proposed new building.
On file for this project
239 documents · 27 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents · 3 drawing sheets
Installation of scaffolding stair tower as per plans filed herewith.
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Sub-CellarUnder Construction129p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
Support of excavation for the proposed new building.
On file for this project
239 documents · 6 drawing sheets
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
On file for this project
15 documents