ECB10/07/20263301.6 manufacturer specifications, design, and capacity. Atoi in response to incident where electrician injured his hand during an electrical pull box lifting operation, no design drawings, manufacturer specs
ECB10/07/2026At time of inspection when researching preshift meeting to determine the scope of work that lead to worker injuring his hand observed no mention of pulley system or use of pulley system or identified hazards fo
ECB08/25/2026At time of inspection, observed monokote fireproofing debris on the roof and 2ND-floor patio of adjacent property at 53 boerum place. Debris originating from the construction site migrated beyond the site due t$25K due
ECB08/04/2026At time of inspection, makeshift temporary platforms were observed on staircases at the 17TH floor. Upon request for design drawings, none were provided, contrary to bc 3301.6.5. Stop use of the temporary platf$5K due
ECB08/04/2026At time of inspection, while responding to an incident involving a worker who slipped and fell during stripping operations at the elevator shaft on the 14TH floor, scaffold platforms were not fully planked, no$10K due
ECB07/22/2026At time of inspection, monokote fireproofing spray operations were conducted without adequate containment. Monokote debris originating from the site was observed at 53 boerum place. Failure to contain airborne$10K due
ECB07/01/2026At time of inspection, observed powder-actuated fastener pins and spent powder-actuated cartridge casings on the neighboring property, indicating construction debris was not contained, creating a hazardous cond$10K due
ECB05/18/2026At the time of inspection of a proposed 22-story new building, i observed spray fireproofing materials particles/debris from construction site on adjoining streets and neighborhood. This is a re-occurring viola$5K due
ECB06/25/2026Worker cut hand while using rebar bending machine for rebar operation, on a 17 story NB site. Permit holder job# B00939362-I1-gc, failed to submit report within 3 business days of required 16 items to code 28-1Hearing held — result not yet published$10K proposed
ECB06/17/2026At time of inspection, monokote fireproofing spray operations were conducted without adequate containment. Monokote debris originating from the site was observed at 53 boerum place and 321 atlantic avenue. FailHearing held — result not yet published$10K proposed
ECB05/21/2026At time of inspection, observed general contractor failed to immediately notify the department after being informed construction debris from 275 atlantic avenue impacted the roof and accessible patio of neighboHearing held — result not yet published$5K proposed
ECB05/21/2026At time of inspection, observed site safety manager was made aware construction debris from 275 atlantic avenue impacted neighboring property at 53 boerum place, creating a hazardous condition to occupants andHearing held — result not yet published$2K proposed
ECB05/21/2026At time of inspection, observed excessive construction debris, including spray foam and miscellaneous material, accumulated outside vertical safety netting systems and along perimeter edges, contrary to housekeHearing held — result not yet published$2K proposed
ECB05/21/2026At time of inspection, observed debris including buckets and other construction material from 275 atlantic avenue had fallen onto the roof and accessible patio area of 53 boerum place, creating a struck-by hazaHearing held — result not yet published$10K proposed
ECB05/21/2026At time of inspection, observed horizontal safety netting systems and areas near unenclosed perimeters were not maintained free of debris throughout the workday, with plastic bucket, spray foam material, and miHearing held — result not yet published$5K proposed
ECB05/21/2026At time of inspection, observed failure to comply with commissioner's orders requiring all loose debris and construction materials be secured due to forecasted severe weather and high winds with gusts up to 60Hearing held — result not yet published$10K proposed