← Back
City university
Steinman Hall
275 CONVENT AVENUE · BIN 1084078
💬 Discuss this project
1960Year Built
9Stories
W5Building Class
R7-2Zoning
272,500 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 41,000 sf lot · 6.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof14p · 2 filings · 8 docs
Floor 711p · 1 filing · 5 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction1p · 1 filing · 11 docs
Floor 1Under Construction10p · 1 filing · 11 docs
Cellar7p · 2 filings · 20 docs
BasementUnder Construction4p · 4 filings · 20 docs
Sub-BasementUnder Construction4p · 1 filing · 13 docs
2 jobs · most recent 09/26/2025
Generators Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
09/26/2025Permit IssuedSIERRA MECHANICAL CONTRACGenerators
Generators
Cemline H670USG1696 7,015,000 BTU · Generator ×1
12/24/2020Permit IssuedTAMEER INCRefrigeration Systems
Refrigeration
Trane RTAE275 275 tons · Air Cooled Chiller ×1
2 jobs · most recent 11/21/2025
Water/Sanitary
FiledStatusContractorScope
11/21/2025——Water/Sanitary
05/13/2025Signed-offPLUMBING WORKS NYC INCWater/Sanitary
5 jobs · most recent 09/16/2025
General Wiring
FiledStatusContractorScope
09/16/2025Permit IssuedZENA ELECTRIC INCGeneral Wiring
07/09/2025Permit IssuedMAN POWER ELECTRIC INCGeneral Wiring
07/06/2021Permit IssuedLEVEST ELECTRIC CORP.General Wiring
02/05/2020CompleteTRICO ELECTRIC CORP.General Wiring
05/23/2018Permit IssuedSTANCO SYSTEM ELEC'L CONT—
Building Lifecycle
All (155)Filed (12)Permit Issued (19)Signed Off (2)Facade (FISP) (15)Violation (60)Inspection (3)Objection (14)Special Inspection (30)
08/05/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
07/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Permit issued — Mechanical Systems
M01285801-I1-MS
05/12/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
05/12/2026
Special inspection requirement — Final
Firas Karkar
04/28/2026
Filed — Alteration
TEMPORARY MECHANICAL PIPING FOR TEMPORARY BOILER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01285801-P1
04/23/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
04/23/2026
Special inspection requirement — Final
Firas Karkar
02/19/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Objection resolved — Addressed
01/08/2026
Permit issued — Mechanical Systems
M01277201-I1-MS
12/19/2025
Violation issued (FDNY_ORDER, closed)
12/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/09/2025
Objection raised — Energy
11/21/2025
Filed — Alteration
PLUMBING WORK FOR STEINMAN HALL- SCOPE IS TO REPLACE THE EXISTING UNFIRED STEAM GENERATOR, CONDENSATE TRANSFER TANK AND PUMP SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01286340-I1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/03/2025
Permit issued — Plumbing
M01148682-S2-PL
10/07/2025
Objection raised — Electrical
10/07/2025
Objection raised — Mechanical
10/07/2025
Objection raised — Mechanical
10/07/2025
Objection raised — Plumbing
09/30/2025
Special inspection requirement — Post-installed Anchors
MARISA HARTE
09/30/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
MARISA HARTE
09/30/2025
Special inspection requirement — Maintenance information
09/30/2025
Special inspection requirement — Electrical motors and elevators
09/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/26/2025
Filed — Alteration
REPLACEMENT OF IN KIND UNFIRED STEAM GENERATOR AND CONDENSATE TRANSFER TANK AND PUMP SYSTEM.
M01277201-I1
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
09/23/2025
Filed — Alteration
TEMPORARY MECHANICAL PIPING FOR TEMPORARY BOILER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01285801-I1
08/25/2025
Special inspection requirement — Mechanical Systems
MARISA HARTE
08/25/2025
Special inspection requirement — Post-installed Anchors
MARISA HARTE
08/25/2025
Special inspection requirement — Final
Firas Karkar
08/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
08/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
08/25/2025
Special inspection requirement — Maintenance information
MARISA HARTE
07/25/2025
Permit issued — Mechanical Systems
M01148682-S1-MS
05/29/2025
Permit issued — General Construction
M01148682-I1-GC
05/20/2025
Violation issued (FDNY_ORDER, closed)
05/20/2025
Violation issued (FDNY_ORDER, closed)
05/13/2025
Filed — Alteration
Modification of existing plumbing fixtures as related to renovation of lab at cellar level. No change in use, egress, or occupancy.
M01148682-S1
05/13/2025
Filed — Alteration
Modification of existing plumbing fixtures as related to renovation of lab at cellar level. No change in use, egress, or occupancy.
M01148682-S2
05/13/2025
Violation issued (FDNY_ORDER, closed)
05/01/2025
Filed — Alteration
Modification of existing plumbing fixtures as related to renovation of lab at cellar level. No change in use, egress, or occupancy.
M01148682-I1
04/09/2025
Violation issued (FDNY_ORDER, closed)
04/08/2025
Violation issued (FDNY_ORDER, closed)
04/08/2025
Violation issued (FDNY_ORDER, closed)
01/02/2025
Violation issued (FDNY_ORDER, closed)
01/02/2025
Violation issued (FDNY_ORDER, closed)
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
11/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
11/27/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
11/27/2024
Special inspection requirement — Final
Howard Graf
11/27/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
11/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
MARISA HARTE
11/27/2024
Special inspection requirement — Lighting controls
MARISA HARTE
11/27/2024
Special inspection requirement — Interior lighting power
MARISA HARTE
Latest 60 of 155 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY4207/08/2026
DORMITORY AUTHORITY OF THE STATE OF NEW YORK803/22/2026
NYC BOARD OF EDUCATION040203/22/2026
NYC BOARD OF ED. SCHOO040103/22/2026
DORMITORY AUTHORITY403/22/2026
CUNY 042103/22/2026
DORMITORY AUTHORITY STATE OF N Y903/21/2026
CUNY DEPT OF DESIGN CONSTRUCTI1203/21/2026
CUNY DEPT OF DESIGN AND CONST1103/21/2026
CUNY DEPARTMENT OF DESIGN CONSTR703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES703/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
CONAPAC SERVICES DBA203/21/2026
SME PROFESSIONAL DESIGN & CONSULTAN203/21/2026
CONAPAC SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARLITOS CONTRACTING CORPGeneral Contractor1803/21/2026
TAMEER INCGeneral Contractor1007/08/2026
RELATED SERVICES LLCGeneral Contractor403/21/2026
VOLMAR CONSTRUCTION INCGeneral Contractor206/28/2026
MARCHESE, JOSEPHElectrical103/21/2026
NIKOLL DUSHIElectrical103/21/2026
SKOWRONSKI JEFFElectrical103/21/2026
STEPHEN ROSTOWSKYElectrical103/21/2026
TRICO ELECTRIC CORP.Electrical103/22/2026
MARIC MECHANICAL INCGeneral Contractor107/08/2026
SIERRA MECHANICAL CONTRACTINGGeneral Contractor104/09/2026
GERARD PALAZZOElectrical103/21/2026
PLUMBING NYC INCPlumbing107/08/2026
HERSHEL ELBAUMElectrical103/21/2026
H & L IRONWORKSElectrical103/21/2026
JEFF SKOWRONSKIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983404/28/2026
FUTURE TECH CONSULTANTS O589305/13/2025
KMB DESIGN GROUP, LLC513110/17/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC05/14/2026
DOB NOWMechanical SystemsPermit IssuedSIERRA MECHANICAL CONTRAC01/08/2026
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC11/03/2025
DOB NOWMechanical SystemsPermit IssuedVOLMAR CONSTRUCTION INC07/25/2025
DOB NOWGeneral ConstructionPermit IssuedVOLMAR CONSTRUCTION INC05/29/2025
DOB NOWMechanical SystemsPermit IssuedTAMEER INC12/05/2023
DOB NOWMechanical SystemsPermit IssuedTAMEER INC04/06/2023
DOB NOWMechanical SystemsPermit IssuedTAMEER INC10/18/2022
DOB NOWMechanical SystemsPermit IssuedTAMEER INC06/08/2022
DOB NOWMechanical SystemsPermit IssuedTAMEER INC11/16/2021
DOB NOWSidewalk ShedSigned-offRELATED SERVICES LLC11/04/2021
DOB NOWMechanical SystemsPermit IssuedTAMEER INC06/24/2021
DOB NOWSidewalk ShedSigned-offRELATED SERVICES LLC04/30/2021
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/23/2018
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/23/2018
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/13/2018
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/13/2018
DOB NOWSupported ScaffoldSigned-offCARLITOS CONTRACTING CORP05/16/2018
DOB NOWSupported ScaffoldSigned-offCARLITOS CONTRACTING CORP05/16/2018
BISOTISSUEDTAMEER INC10/18/2022
BISOTISSUEDTAMEER INC07/06/2022
BISOTISSUEDRELATED SERVICES LLC01/27/2022
BISOTISSUEDTAMEER INC01/17/2022
BISOTISSUEDRELATED SERVICES LLC10/27/2021
BISOTISSUEDVOLMAR CONSTRUCTION INC05/10/2021
BISOTISSUEDRELATED SERVICES LLC01/25/2021
BISOTISSUEDRELATED SERVICES LLC10/26/2020
BISOTISSUEDRELATED SERVICES LLC08/17/2020
BISMHISSUEDTHEODORE WILLIAMS CONSTR08/10/2020
BISOTISSUEDTHEODORE WILLIAMS CONSTR08/10/2020
BISSPISSUEDAGGRESSIVE FIRE PROT LLC02/10/2020
BISPLISSUEDTRISTATE PLBG SVCS CORP02/06/2020
BISMHISSUEDTHEODORE WILLIAMS CONSTR02/04/2020
BISOTISSUEDTHEODORE WILLIAMS CONSTR02/04/2020
BISMHISSUEDVOLMAR CONSTRUCTION INC11/19/2019
BISOTISSUEDVOLMAR CONSTRUCTION INC11/19/2019
BISOTISSUEDSRR HOLDINGS LLC02/25/2019
BISOTISSUEDSRR HOLDINGS LLC06/11/2018
BISOTISSUEDSBLM ARCHITECTS11/04/2016
BISOTISSUEDKNIGHTSBRIDGE CONST CORP03/23/2016
+ 29 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/05/2026Fail-Final SD - Fire PumpFailView ↗
07/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/12/2026Mechanical SystemsMARISA HARTEspecial
05/12/2026FinalFiras Karkarprogress
04/23/2026Mechanical SystemsMARISA HARTEspecial
04/23/2026FinalFiras Karkarprogress
09/30/2025Post-installed AnchorsMARISA HARTEspecial
09/30/2025High Temperature Hot Water Piping (Welding)MARISA HARTEspecial
09/30/2025Maintenance information—energy_progress
09/30/2025Electrical motors and elevators—energy_progress
09/30/2025HVAC-R and service water heating equipment—energy_progress
09/26/2025Energy Code Compliance InspectionsMARISA HARTEprogress
08/25/2025Mechanical SystemsMARISA HARTEspecial
08/25/2025Post-installed AnchorsMARISA HARTEspecial
08/25/2025FinalFiras Karkarprogress
08/25/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
08/25/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
08/25/2025Maintenance informationMARISA HARTEenergy_progress
12/04/2024Energy Code Compliance InspectionsMARISA HARTEprogress
11/27/2024Duct leakage testing, insulation and designMARISA HARTEenergy_progress
11/27/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
11/27/2024Post-installed AnchorsMARISA HARTEspecial
11/27/2024FinalHoward Grafprogress
11/27/2024Energy Code Compliance InspectionsMARISA HARTEprogress
11/27/2024Fire-Resistance Rated ConstructionMARISA HARTEprogress
11/27/2024Lighting controlsMARISA HARTEenergy_progress
11/27/2024Interior lighting powerMARISA HARTEenergy_progress
Latest 25 of 30.
▾Documents — 658 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/06/2026M00042538-P1Request digital key ↗
09/06/2026M00042538-I1Request digital key ↗
09/03/2026M00504225-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00431383-I1Request digital key ↗
▸Applications & Permits130
▸BISPLAN / WORK APPROVAL APPLICATION66
04/09/2021123820525Open ↗
03/25/2021123820525Open ↗
12/24/2020140993931Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION61
05/26/2021140993931Open ↗
05/26/2021140993931Open ↗
08/17/2020140909453Open ↗
Showing 3 of 61 on file for this type
▸BISPLACE OF ASSEMBLY3
08/28/2025123579591Open ↗
07/03/2018123579591Open ↗
07/02/2018123579591Open ↗
▸Seals & Professional Certifications140
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION87
02/04/2020123820525Open ↗
02/04/2020123820525Open ↗
02/04/2020123820543Open ↗
Showing 3 of 87 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M00042538-I1Open ↗
09/06/2026M00042538-P1Open ↗
08/23/2026M01148682-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M01277201-I1Open ↗
09/23/2026M01277201-I1Open ↗
09/23/2026M01277201-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01277201-I1Open ↗
09/02/2026M01148682-I1Open ↗
08/23/2026M01285801-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/24/2020140993931Open ↗
02/01/2018140733428Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/11/2020140909453Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/11/2020140909453Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/11/2020140909453Open ↗
▸Trade Schedules & Equipment47
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/27/2019123820525Open ↗
06/26/2019123820543Open ↗
06/12/2018123360754Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
09/15/2017122034716Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT3
09/15/2017122034716Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/06/2017121629247Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/15/2015140258548Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/15/2015140258548Open ↗
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
02/04/2020123820525Open ↗
02/04/2020123820543Open ↗
09/20/2019140733428Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026M01148682-I1Open ↗
08/23/2026M01148682-S2Open ↗
08/23/2026M01148682-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/11/2020140909453Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
05/14/2021140909453Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00431383-I1Open ↗
▸Energy Compliance53
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
02/04/2020123820525Open ↗
02/04/2020123820525Open ↗
11/20/2019123360754Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
05/26/2021140993931Open ↗
05/05/2021123820525Open ↗
12/24/2020140993931Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/16/2025140993931Open ↗
09/24/2025140993931Open ↗
05/05/2021123820525Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNYCECC ANALYSIS1
06/11/2020140909453Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/11/2020140909453Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/24/2025140993931Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY25
10/16/2025140993931Open ↗
10/16/2025140993931Open ↗
10/16/2025140993931Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs58
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
10/16/2025140993931Open ↗
05/14/2021123820543Open ↗
05/05/2021123820525Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/06/2026M00042538-I1Open ↗
09/06/2026M00042538-P1Open ↗
08/23/2026M01148682-S1Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/24/2020123579591Open ↗
09/20/2019140733428Open ↗
06/12/2018140733428Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00431383-I1Open ↗
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT50
10/16/2025140993931Open ↗
10/16/2025140993931Open ↗
09/24/2025140993931Open ↗
Showing 3 of 50 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
12/23/2020140993931Open ↗
▸Filing & Intake Forms73
▸BISEFILING COVER SHEET39
12/23/2020140993931Open ↗
06/27/2019123820525Open ↗
06/27/2019123820525Open ↗
Showing 3 of 39 on file for this type
▸BISADDITIONAL INFORMATION25
08/29/2025123579591Open ↗
09/09/2019140733428Open ↗
08/28/2019140733428Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/24/2020140993931Open ↗
06/11/2020140909453Open ↗
02/01/2018140733428Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
12/23/2020140993931Open ↗
09/20/2019140733428Open ↗
08/28/2019140733428Open ↗
Showing 3 of 4 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
06/26/2019123820525Open ↗
06/26/2019123820543Open ↗
01/10/2019123527031Open ↗
Showing 3 of 14 on file for this type
▸BISSupporting Document: Fee Deferment1
07/08/2016122810486Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/09/2015140258548Open ↗
▸BISSupporting Document: Fee Exempt1
12/24/2020140993931Open ↗