← Back
BuildNYC
Elevator apt, semi-fireproof without stores
275 FT WASHINGTON AVENUE
MANHATTAN · BIN 1063422
💬 Discuss this project
1937Year Built
6Stories
D1Building Class
R8Zoning
30,648 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized22 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 275 FT Washington Associates · 6,363 sf lot · 4.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBoiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 6Boiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 5Boiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 4Boiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 3Boiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 2Boiler burner replacement and fuel oil grade change1 filing · 15 docs
Floor 1Boiler burner replacement and fuel oil grade change8p · 4 filings · 20 docs
Sub-BasementBoiler burner replacement and fuel oil grade change9p · 1 filing · 15 docs
Site & exteriorBoiler burner replacement and fuel oil grade change2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
275 FT Washington Associates503/22/2026
275 Port Washington Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company411/22/2023
Enthink Engineers212/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & J Construction ServiceScaffold407/08/2026
Ariston ChimneyGeneral Contractor303/21/2026
Romcon ElectricElectrical303/21/2026
H MaintenanceGeneral Contractor103/21/2026
L.V. RemodelingGeneral Contractor107/08/2026
S J Construction ServiceGeneral Contractor103/21/2026
Best Plumbing HVACPlumbing103/21/2026
A.R.L. Plumbing & HeatingPlumbing107/08/2026
J.A. Electric Inc D/B/A MidwaElectrical103/21/2026
Peter & Monty ContractorsGeneral Contractor111/22/2006
St Marks Plumbing & HeatincGeneral Contractor107/10/2006
St Marks Plumbing & HeatincPlumbing107/10/2006
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851411/22/2023
Building Lifecycle
08/18/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW STOOL AT WEST IN THE 1st ROOM FROM EAST…
HPD violation · open
05/13/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW AT SOUTH WALL IN THE 3rd ROOM FROM NORTH…
HPD violation · open
02/27/2026
Elevator Category 1 inspection report filed
02/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
12/13/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD violation · open
235 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offE.K. Combustion01/22/2025
DOB NOWGeneral ConstructionSigned-offAriston Chimney05/16/2024
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating01/17/2024
DOB NOWGeneral ConstructionSigned-offL.V. Remodeling01/03/2024
DOB NOWBoiler EquipmentSigned-offE.K. Combustion10/25/2023
DOB NOWSupported ScaffoldSigned-offS & J Construction Service12/04/2020
DOB NOWSidewalk ShedSigned-offS & J Construction Service10/14/2020
BISOTISSUEDS & J Construction Service04/19/2021
BISOTISSUEDS & J Construction Service11/16/2020
BISPLISSUEDBest Plumbing & HVAC02/03/2017
BISOTISSUEDH. Maintenance02/03/2017
BISEQISSUEDPeter & Monty Contractors11/22/2006
BISOTISSUEDSt Marks Plumbing & Heating07/10/2006
BISPLISSUEDSt Marks P & H07/10/2006
4 projects · most recent 02/16/2025
Boiler Controls General Wiring
FiledStatusContractorScope
02/16/2025CompleteRomcon ElectricBoiler Controls
11/12/2024Permit IssuedJ.A. Electric Inc D/B/A Midwa—
07/12/2023CompleteRobin ElectricalGeneral Wiring
10/21/2020CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/20/2023Fire-Resistance Rated ConstructionLOUIS ARENAprogress
10/09/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/09/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
10/09/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
09/27/2023Heating SystemsLOUIS ARENAspecial
09/22/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/21/2023FinalLOUIS ARENAprogress
09/06/2023FinalLOUIS ARENAprogress
09/06/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
09/06/2023Maintenance informationLOUIS ARENAenergy_progress
09/06/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/06/2023Chimneys and ventsLOUIS ARENAspecial
09/06/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account