← Back
Two family converted from one family
275 WEST END AVENUE
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3-1Zoning
2,474 sfGross Floor Area
2Units
4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.62 FAR built · Flood zone X500
Locations of Work
StructuralMechanical
Roof1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/02/2025$1.4M—Private party → Private party$562/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZPROEKT ARCHITECTURE507/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HM CONSULTING EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UPSTRATE INCGeneral Contractor208/30/2026
K.W.MCINTOSH CONSTRUCTIONGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519207/21/2026
Building Lifecycle
All (64)Filed (5)Permit Issued (3)Violation (6)Objection (20)Special Inspection (30)
08/28/2026
Permit issued — Construction Fence
B01239008-I1-FN
08/13/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/13/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
08/13/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
08/13/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/13/2026
Special inspection requirement — Metering
Younes Abouyaala
08/13/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
08/13/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
08/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/13/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
08/13/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/13/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/13/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/21/2026
Filed — Alteration
RESOLVE VIOLATION39169886P;39169859J;39166546P.REPAIR EXISTING EXTERIOR FRAME ROTTED WALLS AND WINDOWS.PROPOSED INTERIOR RENOVATION CONSISTING OF NEW INTERIOR PARTITIONS AND EXTERIOR FINISHES TO EXISTING TWO-FAMILY .NO CHANGE TO USE,OCCUPANCY OR EGRESS
B01239008-P1
06/09/2026
Permit issued — Mechanical Systems
B01239008-S1-GC-CX
05/13/2026
Filed — Alteration
RESOLVE VIOLATION39169886P;39169859J;39166546P.REPAIR EXISTING EXTERIOR FRAME ROTTED WALLS AND WINDOWS.PROPOSED INTERIOR RENOVATION CONSISTING OF NEW INTERIOR PARTITIONS AND EXTERIOR FINISHES TO EXISTING TWO-FAMILY .NO CHANGE TO USE,OCCUPANCY OR EGRESS
B01239008-S2
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
05/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/13/2026
Special inspection requirement — Maintenance information
05/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/07/2026
Objection raised — Admin
05/07/2026
Objection raised — Zoning
05/07/2026
Objection raised — Structural
05/07/2026
Objection raised — Scope
05/07/2026
Objection raised — Scope
05/07/2026
Objection raised — Scope
04/23/2026
Objection resolved — Addressed
04/22/2026
Objection resolved — Open
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection resolved — Open
04/22/2026
Objection resolved — Open
04/21/2026
Objection resolved — Open
04/02/2026
Objection raised — Zoning
04/02/2026
Objection raised — Fire_Protection
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Zoning
03/16/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Scope
02/19/2026
Objection raised — Admin
02/19/2026
Objection raised — Scope
02/17/2026
Filed — Alteration
B01358628-I1
02/11/2026
Special inspection requirement — Fenestration air leakage
02/11/2026
Special inspection requirement — Air barrier - visual inspection
02/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/11/2026
Special inspection requirement — Insulation placement and R values
02/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/11/2026
Special inspection requirement — Metering
12/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2025
Violation issued (ECB, open)
Construction
12/09/2025
Violation issued (ECB, open)
Construction
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUPSTRATE INC08/28/2026
DOB NOWMechanical SystemsPermit IssuedUPSTRATE INC06/09/2026
DOB NOWConstruction FencePermit IssuedK.W.MCINTOSH CONSTRUCTION07/03/2025
1 project · most recent 07/21/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedUPSTRATE INCAir Conditioning Systems
1 project · most recent 07/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2026——Gas, Water/Sanitary
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026Permit IssuedUPSTRATE INC1 scope_items
1 project · most recent 07/21/2026
Fence
FiledStatusContractorScope
07/21/2026Permit IssuedUPSTRATE INCFence
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/13/2026Mechanical SystemsYounes Abouyaalaspecial
08/13/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/13/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
08/13/2026FinalNAVEEN KUMARprogress
08/13/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/13/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
08/13/2026Air barrier — testing Younes Abouyaalaenergy_progress
08/13/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/13/2026MeteringYounes Abouyaalaenergy_progress
08/13/2026Ventilation and air distribution systemYounes Abouyaalaenergy_progress
08/13/2026Interior lighting powerYounes Abouyaalaenergy_progress
08/13/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/13/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
08/13/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
08/13/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/13/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/13/2026Fenestration areasYounes Abouyaalaenergy_progress
08/13/2026Fenestration air leakageYounes Abouyaalaenergy_progress
05/13/2026Fire-Resistant Penetrations and Joints—special
05/13/2026Energy Code Compliance Inspections—progress
05/13/2026HVAC-R and service water piping design and insulation—energy_progress
05/13/2026Maintenance information—energy_progress
05/13/2026HVAC-R and service water heating system controls—energy_progress
05/13/2026HVAC-R and service water heating equipment—energy_progress
02/11/2026Fenestration air leakage—energy_progress
Latest 25 of 35.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01358628-I1Request digital key ↗
08/17/2026B01239008-S1Request digital key ↗
08/17/2026B01239008-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature16
08/25/2026B01239008-S1Open ↗
08/25/2026B01239008-S1Open ↗
08/25/2026B01239008-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01358628-I1Open ↗
08/17/2026B01239008-I1Open ↗
08/17/2026B01239008-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01239008-S1Open ↗
08/25/2026B01239008-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B01358628-I1Open ↗
08/17/2026B01239008-S1Open ↗
08/17/2026B01239008-S2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026B01239008-P1Open ↗
08/13/2026B01239008-S1Open ↗