← Back
BuildNYC
One story retail building
2750 BOSTON ROAD
BRONX · BIN 2053816
💬 Discuss this project
1995Year Built
1Stories
K1Building Class
C8-1Zoning
12,000 sfGross Floor Area
1Units
0 Active Violations
One story retail building · Owner of record: 2750 Boston Road · 37,645 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWalgreens11p · 2 filings · 9 docs
Floor 1Walgreens20p · 12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rite Aid1703/21/2026
Hines Interest503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Polarworx104/17/2026
MPW Engineering107/25/2024
David Rhodes107/24/2024
KLH Professional Engineers, PSC111/30/2021
HC Engineering1006/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Light Expediting303/21/2026
J A Expediting203/21/2026
JP Expedite2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger1007/08/2026
D & W ElectricalElectrical503/21/2026
Aero Mechanical of New YOGeneral Contractor103/21/2026
M. Fried Store FixturesGeneral Contractor107/08/2026
Air Exchange Energy Sspecialty_contractor107/08/2026
M Fried Store Fixturesspecialty_contractor107/08/2026
Only in NY Mechanicalspecialty_contractor107/08/2026
Capitol Fire SprinklerFire Protection110/12/1995
Design Plumbing & Heating ServcsPlumbing103/04/1996
J.M. BottoPlumbing109/12/1995
Nurminen Construction of NYGeneral Contractor105/16/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM Engineering2366104/17/2026
Atlas ATC Engineering8011107/25/2024
KLH Engineers, PSC3036111/30/2021
Building Lifecycle
07/14/2026
Signed off — Alteration
REPLACEMENT OF HVAC UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01382712-I1
04/27/2026
Permit issued — Mechanical Systems
X01382712-I1-MS
04/17/2026
Filed — Alteration
REPLACEMENT OF HVAC UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01382712-I1
04/03/2026
Special inspection requirement — Mechanical Systems
steven Giammona
04/03/2026
Special inspection requirement — Maintenance information
steven Giammona
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAir Exchange and Energy S04/27/2026
DOB NOWMechanical SystemsSigned-offM. Fried Store Fixtures09/06/2024
DOB NOWGeneral ConstructionSigned-offM. Fried Store Fixtures09/06/2024
DOB NOWMechanical SystemsSigned-offOnly in NY Mechanical12/14/2021
DOB NOWSignSigned-offSigns Cad06/12/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
DOB NOWSignSigned-offSigns Cad06/11/2019
BISMHISSUEDAero Mechanical of New YO03/20/2014
BISOTISSUEDNurminen Construction05/16/2012
BIS—ISSUEDMauceri Sign03/18/1996
BIS—ISSUEDMauceri Sign03/18/1996
BIS—ISSUEDMauceri Sign03/08/1996
BISOTISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BISOTISSUEDMauceri Sign Co., I NC03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/08/1996
BIS—ISSUEDMauceri Sign03/05/1996
BIS—ISSUEDMauceri Sign03/05/1996
BIS—ISSUEDMauceri Sign03/05/1996
BIS—ISSUEDMauceri Sign03/05/1996
BIS—ISSUEDMauceri Sign03/05/1996
BISPLISSUEDDesign Plumbing & Heating Servcs03/04/1996
BISCCISSUEDMatassa Construction12/21/1995
BISCCISSUEDMatassa Construction12/21/1995
BISCCISSUEDMatassa Construction12/21/1995
BISSPISSUEDCapitol Fire SPKL10/12/1995
BISPLISSUEDJ.M. Botto09/12/1995
BIS—ISSUEDMatassa Construction08/21/1995
BISEQISSUEDMatassa Construction08/21/1995
+ 2 more permits on file
1 project · most recent 04/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/17/2026Signed-offAir Exchange and Energy SHeating and Air Conditioning Systems
11 projects · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025CompleteD & W ElectricalGeneral Wiring
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CancelledAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CancelledAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
07/02/2019CompleteAmpere Electrical Services—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/03/2026Mechanical Systemssteven Giammonaspecial
04/03/2026Maintenance informationsteven Giammonaenergy_progress
04/03/2026HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
04/03/2026HVAC-R and service water heating system controlssteven Giammonaenergy_progress
04/03/2026HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
04/03/2026Energy Code Compliance Inspectionssteven Giammonaprogress
04/03/2026Finalsteven Giammonaprogress
07/17/2024Lighting controlsRONALD GRAPINenergy_progress
07/17/2024Interior lighting powerRONALD GRAPINenergy_progress
07/15/2024FinalRONALD GRAPINprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
05/31/2019FinalHackjong Choiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WalgreensRetailFloor 1, Roof
Project X01382712 Alteration · LOC Issued · 04/17/2026
Project X01080770 Alteration · LOC Issued · 07/24/2024
Project X00630405 Alteration · LOC Issued · 11/30/2021
Project X00174689 Alteration · LOC Issued · 06/10/2019
Project X00174707 Alteration · LOC Issued · 06/10/2019
Project X00174768 Alteration · LOC Issued · 06/10/2019
Project X00174775 Alteration · LOC Issued · 06/10/2019
Project X00174781 Alteration · LOC Issued · 06/10/2019
Project X00174797 Alteration · LOC Issued · 06/10/2019
Project X00174817 Alteration · LOC Issued · 06/10/2019
Project X00174847 Alteration · LOC Issued · 06/10/2019
Project X00174854 Alteration · LOC Issued · 06/10/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account