Two family brick
2750 WALLACE AVENUE
BRONX · BIN 2053717
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
3,400 sfGross Floor Area
2Units
Rent Stabilized3 Active Violations ▸
Two family brick · Owner of record: 2750 W LLC · 2,500 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHVAC system installation4p · 1 filing · 20 docs
Floor 2HVAC system installation28p · 1 filing · 20 docs
Floor 1HVAC system installation27p · 1 filing · 20 docs
BasementHVAC system installation26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2750 W LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2025$875K—Private party → 2750 W LLC$257/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Noel Wong902/25/2026
Adb Associates104/22/2025
Vasilios Artemiou203/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JH CrewGeneral Contractor204/09/2026
JH Crewspecialty_contractor104/09/2026
Kishan PlumbingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161102/25/2026
Building Lifecycle
06/26/2026
Objection raised — C/O of existing property requi
06/23/2026
Signed off — Alteration CO
Filing Sprinkler Drawing subsequent to primary job number X01079300-I1
X01079300-S3
06/11/2026
Objection resolved — Resolved
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Other
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJH Crew05/15/2025
DOB NOWSprinklersSigned-offAmb Mechanical05/02/2025
DOB NOWPlumbingSigned-offN and S Plumbing03/17/2025
DOB NOWGeneral ConstructionPermit IssuedJH Crew02/25/2025
DOB NOWMechanical SystemsSigned-offJH Crew02/24/2025
1 project · most recent 02/25/2026
Sprinkler System
FiledStatusContractorScope
02/25/2026Signed-offPrime Piping & HeatingSprinkler System
2 projects · most recent 06/27/2025
General Wiring
FiledStatusContractorScope
06/27/2025CompletePower Direct Electric—
06/24/2025CompletePower Direct ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
07/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/09/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/09/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/09/2025Fenestration areasFAHAD FATEHenergy_progress
07/09/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
07/09/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/09/2025Permanent certificateFAHAD FATEHenergy_progress
07/09/2025Interior lighting powerFAHAD FATEHenergy_progress
07/09/2025MeteringFAHAD FATEHenergy_progress
06/13/2025Permanent certificateFAHAD FATEHenergy_progress
06/13/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/13/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/13/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/13/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/13/2025Maintenance informationFAHAD FATEHenergy_progress
06/13/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/30/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/30/2025Permanent certificateFAHAD FATEHenergy_progress
05/30/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/30/2025Maintenance informationFAHAD FATEHenergy_progress
05/30/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 68.
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account