Two family frame
2759 FENTON AVENUE
BRONX · Pelham Gardens · BIN 2054471
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4Zoning
1,404 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/07/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/15/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01341449-I1
01/14/2026
Permit issued — Solar
X01341449-I1-SL
01/07/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01341449-I1
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/07/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/31/2025
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/14/2026
1 project · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 01/07/2026
FiledStatusContractorScope
01/07/2026Signed-offSUNRUN INSTALLATION SVC32 panels, 13.12 kw, 336 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/07/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/07/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
12/31/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/31/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/31/2025FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01341449-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026X01341449-I1Open ↗
08/24/2026X01341449-I1Open ↗
08/24/2026X01341449-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X01341449-I1Open ↗
08/24/2026X01341449-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01341449-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01341449-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01341449-I1Open ↗