← Back
BuildNYC
Four families
2762 KINGSBRIDGE TERRACE
BRONX · BIN 2015521
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6Zoning
2,730 sfGross Floor Area
4Units
Rent Stabilized44 Active Violations ▸
Four families · Owner of record: 2762 Kingsbridge Terrace · 4,206 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFire sprinkler system installation, first, second, third and32p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 3Fire sprinkler system installation, first, second, third and36p · 3 filings · 20 docs
Floor 2Fire sprinkler system installation, first, second, third and37p · 3 filings · 20 docs
Floor 1Unit 139p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2762 Kingsbridge Terrace103/22/2026
Parkbuilders103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2020$1.6M—2762 KINGSBRIDGE LLC → 2762 KINGSBRIDGE TERRACE LLC$586/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect1004/21/2025
Chosen MEP112/21/2021
Vasilios Artemiou PE108/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing2203/21/2026
Redcut Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyward DevelopersScaffold303/21/2026
Power Direct ElectricElectrical403/22/2026
Skyward DevelopersGeneral Contractor303/21/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Skyward Developersspecialty_contractor104/09/2026
Best Mechanical ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161104/21/2025
Building Lifecycle
06/15/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT…
HPD violation · open
06/15/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM…
HPD violation · open
06/15/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1C,…
HPD violation · open
06/15/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY,…
HPD violation · open
06/15/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH AND WEST WALLS IN THE 1st ROOM FROM EAST…
HPD violation · open
258 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSkyward Developers11/18/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/02/2022
DOB NOWConstruction FenceSigned-offSkyward Developers01/31/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating01/12/2022
DOB NOWPlumbingSigned-offBest Mechanical Services01/04/2022
DOB NOWGeneral ConstructionPermit IssuedSkyward Developers09/20/2021
1 project · most recent 04/21/2025
Heating Systems Ventilation Systems
FiledStatusContractorScope
04/21/2025Permit IssuedSkyward DevelopersHeating Systems, Ventilation Systems
1 project · most recent 01/04/2022
General Wiring
FiledStatusContractorScope
01/04/2022CompletePower Direct ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/04/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/02/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2022Fail-Final CND-Occupancy InspectionFailView ↗
01/20/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
05/06/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/06/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/06/2025MeteringFAHAD FATEHenergy_progress
05/06/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/06/2025Interior lighting powerFAHAD FATEHenergy_progress
05/06/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/06/2025Fenestration areasFAHAD FATEHenergy_progress
05/06/2025Maintenance informationFAHAD FATEHenergy_progress
05/06/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/06/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/06/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/03/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/03/2024Fenestration air leakageFAHAD FATEHenergy_progress
12/03/2024MeteringFAHAD FATEHenergy_progress
12/03/2024Fenestration areasFAHAD FATEHenergy_progress
12/03/2024Interior lighting powerFAHAD FATEHenergy_progress
12/03/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/03/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/03/2024Maintenance informationFAHAD FATEHenergy_progress
12/03/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/03/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/03/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/03/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/12/2023Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 84.
72 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account