← Back
Two stories - detached, small or mid-size
2763 CRESTON AVENUE
BRONX · BIN 2017571
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R8Zoning
1,472 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 1,637 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADO S DESIGN604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR HUGO MARTINEZ, PE305/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACS ENVIRONMENTAL CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E.T. ELEC'L CONTR CO INCElectrical103/22/2026
BELFOR LONG ISLAND LLCGeneral Contractor107/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW IMAGE GEN. CONTRACTOR5266305/12/2025
Building Lifecycle
All (22)Filed (3)Permit Issued (2)Signed Off (1)Violation (1)Inspection (3)Special Inspection (12)
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
VICTOR MARTINEZ
05/12/2025
Filed — Alteration
TO REGISTER AN EXISTING GAS FIRED BOILER AND A GAS FIRED HOT WATER HEATER IN THIS ONE FAMILY HOUSE AS PER CON-EDISON REQUEST. PLUS, A MINOR GAS PIPING WORK TO BE DONE,
X01191418-P1
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
VICTOR MARTINEZ
04/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2025
Permit issued — Plumbing
X01191418-I1-PL
03/17/2025
Filed — Alteration
TO REGISTER AN EXISTING GAS FIRED BOILER AND A GAS FIRED HOT WATER HEATER IN THIS ONE FAMILY HOUSE AS PER CON-EDISON REQUEST. PLUS, A MINOR GAS PIPING WORK TO BE DONE,
X01191418-I1
12/10/2024
Signed off — Alteration
Application is filed to repair this 1-Family house, damaged due to firefighting operations. The required work is as per plans.
X01120594-I1
10/21/2024
Permit issued — General Construction
X01120594-I1-GC
10/16/2024
Filed — Alteration
Application is filed to repair this 1-Family house, damaged due to firefighting operations. The required work is as per plans.
X01120594-I1
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Final
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Fenestration air leakage
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Air barrier - visual inspection
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Lighting in dwelling units
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Fenestration areas
VICTOR MARTINEZ
10/01/2024
Special inspection requirement — Insulation placement and R values
VICTOR MARTINEZ
07/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPE PLUMBING INC03/21/2025
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC10/21/2024
1 project · most recent 05/12/2025
Gas
FiledStatusContractorScope
05/12/2025Signed-offCAPE PLUMBING INCGas
1 project · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025Permit IssuedE.T. ELEC'L CONTR CO INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/13/2025Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
05/13/2025Energy Code Compliance InspectionsVICTOR MARTINEZprogress
05/02/2025Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
05/02/2025Energy Code Compliance InspectionsVICTOR MARTINEZprogress
10/01/2024Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
10/01/2024FinalVICTOR MARTINEZprogress
10/01/2024Fenestration air leakageVICTOR MARTINEZenergy_progress
10/01/2024Air barrier - visual inspectionVICTOR MARTINEZenergy_progress
10/01/2024Fenestration and door U-factor and product ratingsVICTOR MARTINEZenergy_progress
10/01/2024Lighting in dwelling unitsVICTOR MARTINEZenergy_progress
10/01/2024Fenestration areasVICTOR MARTINEZenergy_progress
10/01/2024Insulation placement and R valuesVICTOR MARTINEZenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01120594-I1Request digital key ↗
08/19/2026X01191418-I1Request digital key ↗
08/19/2026X01191418-P1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026X01191418-P1Open ↗
08/27/2026X01191418-I1Open ↗
08/23/2026X01120594-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X01120594-I1Open ↗
08/13/2026X01191418-I1Open ↗
08/13/2026X01191418-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026X01191418-P1Open ↗
08/27/2026X01191418-I1Open ↗
08/23/2026X01120594-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026X01191418-P1Open ↗
08/13/2026X01120594-I1Open ↗
08/13/2026X01191418-I1Open ↗