← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2765 MATTHEWS AVENUE
BRONX · BIN 2053760
💬 Discuss this project
1929Year Built
6Stories
D1Building Class
R6Zoning
80,681 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized169 Active Violations 7 likely answered 11 old, status unconfirmed ▸
Elevator apt, semi-fireproof without stores · Owner of record: E & O Realty Associates · 13,500 sf lot · 5.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPartial cellar mechanical work1p · 1 filing · 7 docs
Floor 6Gas meter and riser replacement in cellar and apartments3p · 1 filing · 4 docs
Floor 5Unit 5BUnder Construction8p · 2 filings · 15 docs
Floor 4Unit 4AUnder Construction8p · 2 filings · 15 docs
Floor 3Gas meter and riser replacement in cellar and apartments3p · 1 filing · 4 docs
Floor 2Gas meter and riser replacement in cellar and apartments3p · 1 filing · 4 docs
Floor 1Heavy duty sidewalk shed installation7p · 2 filings · 6 docs
CellarPartial cellar mechanical work32p · 7 filings · 20 docs
Site & exteriorFacade repair, window lintels, mortar re-pointing7p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E & O Realty Associates803/22/2026
Jamaica Associates103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CKL Engineering209/18/2026
Roman S. Mardarewich Architect406/16/2025
Asr Engineering107/02/2024
Mje Professional Services105/22/2024
Bazini Engineering507/25/2023
DS Engineering Services211/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY Management Group803/21/2026
Pelican Management203/21/2026
ABC Permit Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SNS OrgnizationGeneral Contractor903/21/2026
Tradeline PlumbingPlumbing307/08/2026
Advanced Plumbing MechanicalPlumbing307/08/2026
MSR ConstructionGeneral Contractor203/21/2026
Indian Head ContractingGeneral Contractor107/08/2026
Cavalry GC&PGeneral Contractor109/25/2026
JascoScaffold107/08/2026
A H Construction CoGeneral Contractor107/08/2026
Clean Tech MechanicalPlumbing110/16/2026
Torres IvanElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605209/18/2026
A&B World Consulting5704104/02/2025
Syed Engineering7054107/02/2024
Bazini Engineering1808507/25/2023
DS Engineering Services1608211/24/2021
Building Lifecycle
10/15/2026
Permit issued — Plumbing
X01462403-S1-PL
09/24/2026
Permit issued — General Construction
X01462403-I1-GC
09/18/2026
Filed — Alteration
INTERIOR RENOVATION FOR APT. 4A AND APT. 5B AS PER PLAN. REMOVEECB VIOLATION # 39197647X AND TO LIFT VACATE ORDER #2446356. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01462403-I1
09/18/2026
Filed — Alteration
INTERIOR RENOVATION FOR APT. 4A AND APT. 5B AS PER PLAN. REMOVEECB VIOLATION # 39197647X AND TO LIFT VACATE ORDER #2446356. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01462403-S1
09/18/2026
Special inspection requirement — Final
Cloud Lee
271 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedClean Tech Mechanical10/15/2026
DOB NOWGeneral ConstructionPermit IssuedCavalry GC&P09/24/2026
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical05/02/2025
DOB NOWMechanical SystemsSigned-offIndian Head Contracting04/08/2025
DOB NOWGeneral ConstructionPermit IssuedA H Construction Co07/08/2024
DOB NOWSidewalk ShedSigned-offJasco05/22/2024
DOB NOWMechanical SystemsSigned-offSNS Orgnization07/18/2023
DOB NOWPlumbingSigned-offTradeline Plumbing02/21/2023
DOB NOWStructuralSigned-offSNS Orgnization09/20/2022
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz09/17/2022
DOB NOWPlumbingSigned-offTradeline Plumbing02/25/2022
DOB NOWGeneral ConstructionSigned-offSNS Orgnization01/28/2022
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz11/03/2021
DOB NOWPlumbingSigned-offTradeline Plumbing11/03/2021
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz08/17/2021
DOB NOWStructuralSigned-offMSR Construction08/02/2021
BISEQISSUEDJJS Builders10/06/2017
BISPLISSUEDTW Plumbing & Heating07/02/2014
BISOTISSUEDPractical Appraising & *06/26/2014
BISOTISSUEDPractical Appraising & *06/04/2014
BISOTISSUEDPower Consulting Svces Co02/11/2009
BISOTISSUEDPower Consulting06/23/2008
1 project · most recent 09/18/2026
Water/Sanitary
FiledStatusContractorScope
09/18/2026Permit IssuedClean Tech MechanicalWater/Sanitary
1 project · most recent 05/23/2024
FiledStatusContractorScope
05/23/2024Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/20/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2025Pass-Final PL - UndergroundPassView ↗
05/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2023Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
10/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/18/2026FinalCloud Leeprogress
09/18/2026Tenant Protection Plan ComplianceJAMES CHUNspecial
09/18/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/18/2026Tenant Protection Plan ComplianceJAMES CHUNspecial
09/18/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
03/27/2025Mechanical SystemsAlexander Bomsteinspecial
03/27/2025FinalROMAN MARDAREWICHprogress
07/02/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
06/24/2024FinalRAFI HAMIDprogress
07/26/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
01/20/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
01/05/2022Fire-Resistant Penetrations and JointsJoseph Bazinispecial
08/05/2021Chimneys and ventsJoseph Bazinispecial
08/05/2021Fire-Resistance Rated ConstructionJoseph Baziniprogress
08/05/2021FinalJoseph Baziniprogress
08/05/2021Mechanical SystemsJoseph Bazinispecial
03/18/2021Structural Stability – Alterations of existing buildingsDaniel Siegelspecial
03/18/2021FinalDaniel Siegelprogress
99 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account