Elevator apt, semi-fireproof with stores
2769 CRESTON AVENUE
BRONX · BIN 2017549
💬 Discuss this project
2023Year Built
9Stories
D7Building Class
R8Zoning
28,128 sfGross Floor Area
45Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 2769 CRESTON LLC · 5,050 sf lot · 5.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 554p · 1 filing · 20 docs
Floor 455p · 1 filing · 20 docs
Floor 354p · 1 filing · 20 docs
Floor 256p · 1 filing · 20 docs
Floor 156p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
781-783 ELSMERE PL4307/08/2026
L A DEVELOPERS GROUP903/22/2026
2769 CRESTON403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2022$3.3M—— → —— not available
06/13/2019$975K—Private party → 2769 CRESTON AVE, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1808/19/2024
KNF SERVICES CROP111/11/2022
BADALY ENGINEERING PLLC303/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING3603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L & A DEVELOPERS GROUP*General Contractor2407/08/2026
N.B.A CONSTRUCTION INCGeneral Contractor407/08/2026
ZAHIR SAKOORElectrical303/21/2026
SOLID STATE ELECTRIC LLC 005180General Contractor303/22/2026
FREEDOM GS INCGeneral Contractor203/21/2026
GALAXY GENERAL CONTRACTINGeneral Contractor207/08/2026
MILL BROOK FIRE PROTECTIONFire Protection107/08/2026
NY PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795908/19/2024
NODE ARCHITECTURE,ENGINEE67991408/19/2024
BADALY ARCHITECT PLLC7137203/18/2022
Building Lifecycle
All (136)Filed (22)Permit Issued (20)Signed Off (8)Violation (13)Inspection (13)Objection (30)Special Inspection (30)
08/21/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S8
08/19/2024
Filed — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-A1
08/19/2024
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
08/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
08/13/2024
Filed — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-A3
08/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
08/13/2024
Special inspection requirement — Exterior lighting power
Radomir Delic
08/13/2024
Special inspection requirement — Insulation placement and R values
Radomir Delic
08/13/2024
Special inspection requirement — Fenestration air leakage
Radomir Delic
08/13/2024
Special inspection requirement — Electrical motors and elevators
Radomir Delic
08/13/2024
Special inspection requirement — Air barrier — testing
Radomir Delic
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
08/13/2024
Special inspection requirement — Fenestration areas
Radomir Delic
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Radomir Delic
08/13/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
08/13/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
08/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
08/13/2024
Special inspection requirement — Metering
Radomir Delic
08/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
08/13/2024
Special inspection requirement — Maintenance information
Radomir Delic
08/13/2024
Special inspection requirement — Lighting controls
Radomir Delic
08/13/2024
Special inspection requirement — Interior lighting power
Radomir Delic
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
08/06/2024
Objection raised — Other
08/06/2024
Objection resolved — Addressed
08/06/2024
Objection raised — Other
08/06/2024
Objection resolved — Addressed
07/26/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Other
07/16/2024
Filed — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-A2
07/02/2024
Special inspection requirement — Lighting controls
Radomir Delic
07/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S9
06/17/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S7
05/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/20/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/20/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/07/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S5
05/02/2024
Filed — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-P8
05/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2024
Signed off — Alteration
X00670651-I1
03/22/2024
Signed off — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
X08022584-I1
03/19/2024
Filed — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-P7
03/08/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S6
03/08/2024
Signed off — New Building
SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING JOB #X00599806-I1 & FOUNDATION JOB #X00599806-S1
X00599806-S4
03/01/2024
Permit issued — Sidewalk Shed
X08022584-I1-SH
03/01/2024
Violation issued (ECB, closed)
Construction
02/26/2024
Permit issued — Structural
X00599806-S6-ST
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offN.B.A CONSTRUCTION INC03/01/2024
DOB NOWStructuralSigned-offL A DEVELOPERS GROUP*02/26/2024
DOB NOWConstruction FenceSigned-offL A DEVELOPERS GROUP*01/29/2024
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*11/30/2023
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*11/29/2023
DOB NOWMechanical SystemsSigned-offL A DEVELOPERS GROUP*06/28/2023
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC06/10/2023
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*04/11/2023
DOB NOWStructuralSigned-offL A DEVELOPERS GROUP*03/01/2023
DOB NOWFoundationSigned-offL A DEVELOPERS GROUP*02/22/2023
DOB NOWPlumbingSigned-offNY PLUMBING & HEATING COR02/15/2023
DOB NOWConstruction FenceSigned-offL A DEVELOPERS GROUP*02/03/2023
DOB NOWEarth WorkPermit IssuedL A DEVELOPERS GROUP*01/31/2023
DOB NOWFoundationSigned-offL A DEVELOPERS GROUP*01/12/2023
DOB NOWEarth WorkPermit IssuedL A DEVELOPERS GROUP*01/12/2023
DOB NOWConstruction FenceSigned-offL A DEVELOPERS GROUP*01/10/2023
DOB NOWSidewalk ShedSigned-offN.B.A CONSTRUCTION INC11/15/2022
DOB NOWFoundationSigned-offGALAXY GENERAL CONTRACTIN06/02/2022
DOB NOWEarth WorkPermit IssuedGALAXY GENERAL CONTRACTIN05/31/2022
DOB NOWConstruction FenceSigned-offFREEDOM GS02/11/2022
BIS—ISSUEDGALAXY GENERAL CONTRACTIN05/10/2022
1 project · most recent 08/19/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2024Signed-offL & A DEVELOPERS GROUP*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MUZ-FS09NA-U1 9,000 BTU · Split System ×54
MXZ-2C20NAHZ4-U1 18,000 BTU · Split System ×36
MUZ-FS12NA-U1 12,000 BTU · Split System ×2
MXZ-SM60NAM2-U1 60,000 BTU · Split System ×2
1 project · most recent 08/19/2024
Storm Water/Sanitary
FiledStatusContractorScope
08/19/2024Signed-offNY PLUMBING & HEATING CORStorm, Water/Sanitary
3 projects · most recent 10/15/2024
General Wiring
FiledStatusContractorScope
10/15/2024CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
07/27/2023CompleteJAM ELECTRICAL CORP—
03/16/2023CompleteRICHARD NEU—
1 project · most recent 08/19/2024
Steel Concrete Masonry
FiledStatusContractorScope
08/19/2024Signed-offL & A DEVELOPERS GROUP*Steel, Concrete, Masonry
1 project · most recent 08/19/2024
Fence
FiledStatusContractorScope
08/19/2024Signed-offL & A DEVELOPERS GROUP*Fence
1 project · most recent 08/19/2024
Earthwork
FiledStatusContractorScope
08/19/2024Signed-offL & A DEVELOPERS GROUP*Earthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/20/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
05/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
08/19/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
08/19/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
08/19/2024FinalMICHAEL KARANTINIDIS, P.E.progress
08/19/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
08/19/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
08/19/2024Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
08/13/2024Energy Code Compliance InspectionsRadomir Delicprogress
08/13/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
08/13/2024HVAC-R and service water piping design and insulationRadomir Delicenergy_progress
08/13/2024Electrical motors and elevatorsRadomir Delicenergy_progress
08/13/2024Air barrier - visual inspectionRadomir Delicenergy_progress
08/13/2024Interior lighting powerRadomir Delicenergy_progress
08/13/2024Lighting in dwelling unitsRadomir Delicenergy_progress
08/13/2024Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
08/13/2024Fenestration areasRadomir Delicenergy_progress
08/13/2024Air barrier — testing Radomir Delicenergy_progress
08/13/2024Fenestration air leakageRadomir Delicenergy_progress
08/13/2024Exterior lighting powerRadomir Delicenergy_progress
08/13/2024Insulation placement and R valuesRadomir Delicenergy_progress
08/13/2024Lighting controlsRadomir Delicenergy_progress
Latest 25 of 100.
▾Documents — 222 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/24/2026X00670651-I1Request digital key ↗
08/23/2026X08022584-I1Request digital key ↗
08/23/2026X00599806-P7Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
01/10/2023240341297Open ↗
12/29/2022240311284Open ↗
11/19/2019220699493Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/10/2023240341297Open ↗
▸BISWORK PERMIT APPLICATION1
05/13/2022220699493Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026X00599806-P6Open ↗
08/13/2026X00599806-P7Open ↗
08/13/2026X00599806-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026X00599806-A2Open ↗
08/13/2026X00599806-A3Open ↗
08/13/2026X00599806-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00599806-I1Open ↗
▸Seals & Professional Certifications116
▸DOB NOWProgress Inspector Seal & Signature70
09/24/2026X00599806-S2Open ↗
09/01/2026X00599806-P2Open ↗
08/26/2026X00599806-A2Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/24/2026X00670651-I1Open ↗
08/23/2026X00599806-P7Open ↗
08/23/2026X00599806-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/24/2026X00599806-S2Open ↗
09/01/2026X00599806-P2Open ↗
09/01/2026X00599806-P3Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/10/2023240341297Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/10/2023240341297Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/19/2019220699493Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026X00599806-P1Open ↗
08/13/2026X00599806-A2Open ↗
08/13/2026X00599806-A3Open ↗
Showing 3 of 6 on file for this type
▸BISGAS CUT-OFF1
05/13/2022220699493Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
05/13/2022220699493Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist6
08/13/2026X00599806-P1Open ↗
08/13/2026X00599806-I1Open ↗
08/13/2026X00599806-P6Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/13/2022220699493Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/19/2019220699493Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/27/2024240341297Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/27/2023240341297Open ↗
▸BISSTREET TREE CHECKLIST1
04/27/2023240341297Open ↗
▸BISSTREET TREE SIGNOFF1
06/27/2024240341297Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/19/2019220699493Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00599806-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00599806-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00599806-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/13/2022220699493Open ↗
▸BISRODENT CONTROL1
05/13/2022220699493Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026X00599806-S7Open ↗
08/13/2026X00599806-S8Open ↗
08/13/2026X00599806-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00599806-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/13/2022220699493Open ↗
05/13/2022220699493Open ↗
05/13/2022220699493Open ↗
Showing 3 of 7 on file for this type
▸BISCONSTRUCTION (OT) SIGNOFF1
07/03/2024240341297Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/13/2022220699493Open ↗
▸BISBPP: FINAL SIGNOFF1
06/28/2024240341297Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
01/10/2023240341297Open ↗
▸BISADDITIONAL INFORMATION1
04/27/2023240341297Open ↗
▸BISEFILING COVER SHEET1
11/19/2019220699493Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial6
08/13/2026X00599806-A2Open ↗
08/13/2026X00599806-I1Open ↗
08/13/2026X00599806-A3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026X00599806-P7Open ↗
08/13/2026X00599806-A2Open ↗
08/13/2026X00599806-A3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/23/2026X00599806-P6Open ↗
08/23/2026X00599806-P7Open ↗
08/23/2026X00599806-A3Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
01/10/2023240341297Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00599806-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00599806-S2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00599806-I1Open ↗