5 Open Violations 1 unresolved · 4 paperwork only▸
DOB06/12/2001WORK WITHOUT A PERMIT. WORK NOTED: AN EXTENSION OF CEMENT BLOCKS AT RIGHT SIDE OF CHURCH. REMEDY: OBTAIN A PERMIT
ECB05/14/2019APPROVED PLACE OF ASSEMBLY PLANS NOT AVAILABLE FOR INSPECTION. REF TO DOB RECORDS C OF O#201587 INDICATES THAT IS BUILDINGS USE AS GROUP 4(CHURCH),PERSONS ACCOMMODATIONS(70). HOWEVER,PLACE OF ASSEMBLY PLANS NOTNothing owed — awaiting certificate of correction
ECB06/12/2001WORK WITHOUT A PERMIT: WORK NOTED: AN EXTENSION OF CEMENT BLOCKS AT RIGHT SIDE OF CHURCH. REMEDY: OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
ECB07/14/1999WORK WITHOUT A PERMIT. WORK NOTED: HAVING ERECTED A 1 STORY EXTENSION TO THE EAST SIDE OF PREMISES. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR REMOVE THE EXTENSION.Nothing owed — awaiting certificate of correction
ECB03/01/1995WORKED WITHOUT A PERMIT:IN THAT AN AREA OF APPX.20 FEET X6 FEET HAS BEEN ADDED TO THE FIRST FLOOR EAST TO FACILITATE A DINING AREA.REMEDY:OBTAIN PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION.STOP ALL WNothing owed — awaiting certificate of correction
Church, synagogue, chapel · Owner of record: MT OLIVE HOLINESS CHURCH · 6,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.