Primarily 3 family with 1 store or office
277 MALCOLM X BOULEVARD
BROOKLYN · BIN 3046886
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
R6AZoning
4,290 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations 3 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: C 34 LEGACY, LLC · 1,560 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C 34 LEGACY403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DDG ARCHITECTURE, P.C.605/19/2026
SABRINA ROCHA R.A.106/17/2023
INM ARCHITECTS PC211/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D+DG ARCHITECTURE503/21/2026
ASKON ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
5 MINDS PROPERTY GROUP COGeneral Contractor207/08/2026
PP COUSIN INCPlumbing207/08/2026
BARNETT PLBG & HTG CORPPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252505/19/2026
INM ARCHITECT, P.C.3351211/09/2020
Building Lifecycle
All (92)Filed (9)Permit Issued (5)Violation (27)Inspection (3)Objection (18)Special Inspection (30)
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/13/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Cost
05/19/2026
Filed — Alteration
Installation of new plumbing fixtures at the new toilet room along with relocation of the existing 3-compartment sink and hand sink. Reroute gas piping around existing 1st floor ramp opening area. No change in use, occupancy or egress with this app.
B01205779-P3
05/05/2026
Violation issued (HPD, open)
A
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/14/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/17/2026
Special inspection requirement — Ventilation and air distribution system
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Masonry
03/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/17/2026
Special inspection requirement — Wood – Seismic Resistance
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
03/17/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Structural Steel - Welding
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/17/2026
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
03/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/17/2026
Special inspection requirement — Fenestration areas
03/17/2026
Special inspection requirement — Fenestration air leakage
02/16/2026
Filed — Alteration
Installation of new plumbing fixtures at the new toilet room along with relocation of the existing 3-compartment sink and hand sink. Reroute gas piping around existing 1st floor ramp opening area. No change in use, occupancy or egress with this app.
B01205779-P1
02/15/2026
Special inspection requirement — Fenestration areas
02/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/15/2026
Special inspection requirement — Fenestration air leakage
02/08/2026
Special inspection requirement — Concrete - Cast-In-Place
02/08/2026
Special inspection requirement — Masonry
02/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/08/2026
Special inspection requirement — Structural Steel - Welding
01/26/2026
Filed — Alteration
Installation of new plumbing fixtures at the new toilet room along with relocation of the existing 3-compartment sink and hand sink. Reroute gas piping around existing 1st floor ramp opening area. No change in use, occupancy or egress with this app.
B01205779-P2
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/02/2026
Permit issued — Construction Fence
B01265473-I1-FN
01/02/2026
Violation issued (ECB, open)
Construction
01/02/2026
Violation issued (ECB, open)
Construction
12/01/2025
Objection resolved — Addressed
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2025
Objection raised — Other
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2025
Filed — Alteration
New Construction fence installed onto sidewalk at front facade of commercial space.
B01265473-I1
10/20/2025
Permit issued — Plumbing
B01205779-S1-PL
07/30/2025
Permit issued — Mechanical Systems
B01205779-I1-GC-CX
06/15/2025
Filed — Alteration
Installation of new plumbing fixtures at the new toilet room along with relocation of the existing 3-compartment sink and hand sink. Reroute gas piping around existing 1st floor ramp opening area. No change in use, occupancy or egress with this app.
B01205779-S1
06/10/2025
Violation issued (HPD, closed)
A
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/10/2025
Objection resolved — Addressed
05/10/2025
Objection resolved — Addressed
05/10/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
04/30/2025
Objection raised — Fire_Protection
04/30/2025
Objection raised — Cost
04/30/2025
Objection raised — Fire_Protection
04/30/2025
Objection raised — Other
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit Issued5 MINDS PROPERTY GROUP01/02/2026
DOB NOWPlumbingPermit IssuedBARNETT PLBG & HTG CORP10/20/2025
DOB NOWMechanical SystemsPermit Issued5 MINDS PROPERTY GROUP07/30/2025
DOB NOWPlumbingSigned-offPP COUSIN INC10/29/2020
DOB NOWPlumbingSigned-offPP COUSIN INC01/24/2020
BISOTISSUEDVISION BUILD RENOVATION I05/26/2016
BISMHISSUEDVISION BUILD RENOVATION I05/23/2016
BISPLISSUEDDOVAL PLBG & HTG CORP05/13/2016
BISOTISSUEDUMANA DESIGNS INC04/20/2016
2 projects · most recent 05/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/19/2026Permit IssuedBARNETT PLBG & HTG CORPGas, Water/Sanitary
11/09/2020Signed-offPP COUSIN INCGas
2 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025Permit IssuedNAPSTAR ELECTRIC INCGeneral Wiring
07/24/2024CompleteHIGH IMPACT ELECTRIC CORPGeneral Wiring
1 project · most recent 05/19/2026
Wood
FiledStatusContractorScope
05/19/2026Permit IssuedBARNETT PLBG & HTG CORPWood
1 project · most recent 10/28/2025
Fence
FiledStatusContractorScope
10/28/2025Permit Issued5 MINDS PROPERTY GROUP COFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/14/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/30/2026Tenant Protection Plan Compliance—special
04/22/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/22/2026Tenant Protection Plan Compliance—special
03/17/2026Ventilation and air distribution systemINDARDEO PARBHUNATHenergy_progress
03/17/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
03/17/2026Masonry—special
03/17/2026Structural Steel - High Strength Bolting—special
03/17/2026Wood – Seismic ResistanceINDARDEO PARBHUNATHspecial
03/17/2026Concrete - Cast-In-Place—special
03/17/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
03/17/2026Structural Steel - Welding—special
03/17/2026Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
03/17/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/17/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
03/17/2026FinalNAVEEN KUMARprogress
03/17/2026Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
03/17/2026Interior lighting powerINDARDEO PARBHUNATHenergy_progress
03/17/2026Fenestration and door U-factor and product ratings—energy_progress
03/17/2026Fenestration areas—energy_progress
03/17/2026Fenestration air leakage—energy_progress
02/15/2026Fenestration areas—energy_progress
02/15/2026Fenestration and door U-factor and product ratings—energy_progress
02/15/2026Fenestration air leakage—energy_progress
02/08/2026Concrete - Cast-In-Place—special
Latest 25 of 44.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/27/2026B00872609-I1Request digital key ↗
08/20/2026B01265473-I1Request digital key ↗
08/17/2026B01205779-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00269418-I1Request digital key ↗
08/15/2026B00269418-P1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
06/03/2016321364064Open ↗
05/27/2016321364064Open ↗
05/23/2016321364064Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/28/2016321364064Open ↗
04/14/2016321364064Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026B01205779-S1Open ↗
08/28/2026B00269418-I1Open ↗
08/26/2026B01205779-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/26/2026B01205779-P1Open ↗
08/26/2026B01205779-P1Open ↗
08/26/2026B01205779-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026B01265473-I1Open ↗
08/17/2026B01205779-I1Open ↗
08/17/2026B01205779-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/15/2016321364064Open ↗
08/15/2016321364064Open ↗
04/21/2016321364064Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/14/2016321364064Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/14/2016321364064Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/28/2016321364064Open ↗
04/14/2016321364064Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/14/2016321364064Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01205779-P3Open ↗
08/17/2026B01205779-P2Open ↗
08/17/2026B01205779-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/14/2016321364064Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/14/2016321364064Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSUPERSEDING LETTER1
06/03/2016321364064Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/14/2016321364064Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/14/2016321364064Open ↗