← Back
Two stories - detached, small or mid-size
277 POTTER AVENUE
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5009263
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
1,828 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · Owner of record: 68 SUNFLOWER GROUP INC. · 4,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Floor 11p · 1 filing · 16 docs
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50-61 46TH STREET NY11507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC507/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415507/13/2023
Building Lifecycle
All (36)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (5)Special Inspection (20)
07/20/2023
Signed off — Alteration
HEREWITH TO PROPOSE RELAMINATE EXISTING WALLS, UPDATE FINISHES AS PER PLANS. INSTALL DUCTLESS MINI SPLIT UNITS. NO CHANGE IN USE OCCUPANCY EGRESS, OR BULK TO EXISTING 2.5 STORY, 1 FAMILY DWELLING.
S00732147-I1
07/20/2023
Signed off — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #S00732147.
S00732156-I1
07/13/2023
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #S00732147.
S00732156-P3
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
07/13/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
07/12/2023
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #S00732147.
S00732156-P2
07/12/2023
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #S00732147.
S00732156-P1
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
06/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/18/2023
Permit issued — Plumbing
S00732156-I1-PL
06/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/17/2022
Permit issued — Plumbing
S00732156-I1-PL
05/17/2022
Permit issued — Mechanical Systems
S00732147-I1-GC-CX
05/11/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #S00732147.
S00732156-I1
05/09/2022
Filed — Alteration
HEREWITH TO PROPOSE RELAMINATE EXISTING WALLS, UPDATE FINISHES AS PER PLANS. INSTALL DUCTLESS MINI SPLIT UNITS. NO CHANGE IN USE OCCUPANCY EGRESS, OR BULK TO EXISTING 2.5 STORY, 1 FAMILY DWELLING.
S00732147-I1
05/06/2022
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
05/06/2022
Special inspection requirement — Insulation placement and R values
DOYUN KIM
05/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
05/06/2022
Special inspection requirement — Fenestration air leakage
DOYUN KIM
05/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
05/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
05/06/2022
Special inspection requirement — Lighting controls
DOYUN KIM
05/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
05/06/2022
Special inspection requirement — Maintenance information
DOYUN KIM
05/06/2022
Special inspection requirement — Permanent certificate
DOYUN KIM
05/06/2022
Special inspection requirement — Interior lighting power
DOYUN KIM
05/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
05/06/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/05/2022
Special inspection requirement — Mechanical Systems
DOYUN KIM
05/05/2022
Special inspection requirement — Final
DOYUN KIM
05/27/2003
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/18/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/17/2022
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO05/17/2022
1 project · most recent 05/10/2023
General Wiring
FiledStatusContractorScope
05/10/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/13/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
07/13/2023Energy Code Compliance InspectionsDOYUN KIMprogress
07/12/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
07/12/2023Energy Code Compliance InspectionsDOYUN KIMprogress
05/06/2022Air barrier - visual inspectionDOYUN KIMenergy_progress
05/06/2022Insulation placement and R valuesDOYUN KIMenergy_progress
05/06/2022Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
05/06/2022Fenestration air leakageDOYUN KIMenergy_progress
05/06/2022HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
05/06/2022HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
05/06/2022Lighting controlsDOYUN KIMenergy_progress
05/06/2022HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
05/06/2022Maintenance informationDOYUN KIMenergy_progress
05/06/2022Permanent certificateDOYUN KIMenergy_progress
05/06/2022Interior lighting powerDOYUN KIMenergy_progress
05/06/2022Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
05/06/2022Energy Code Compliance InspectionsDOYUN KIMprogress
05/06/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/05/2022Mechanical SystemsDOYUN KIMspecial
05/05/2022FinalDOYUN KIMprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00732147-I1Request digital key ↗
08/23/2026S00732156-I1Request digital key ↗
08/23/2026S00732156-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00732156-P2Open ↗
08/23/2026S00732156-P1Open ↗
08/23/2026S00732156-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00732156-P2Open ↗
08/24/2026S00732156-I1Open ↗
08/22/2026S00732147-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S00732156-P2Open ↗
08/24/2026S00732156-I1Open ↗
08/22/2026S00732147-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026S00732156-P1Open ↗
08/23/2026S00732156-I1Open ↗
08/23/2026S00732156-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00732147-I1Open ↗