277 WEST END AVENUE
MANHATTAN · BIN 1030988
💬 Discuss this project
1926Year Built
15Stories
D4Building Class
R10AZoning
203,479 sfGross Floor Area
81Units
LL97 CoveredRent Stabilized2 Active Violations 4 likely answered 4 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Viewest Owners · 16,275 sf lot · 12.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects9th cycle FISP facade repairs1 filing
Floor 14Unit 14C1p · 4 filings · 10 docs
Floor 13
Floor 12
Floor 11Unit 11D1 filing · 10 docs
Floor 10
Floor 9Unit 9B2 filings · 10 docs
Floor 8Unit 8C2 filings · 10 docs
Floor 7Unit 7C, Unit 7D, Unit 7CDUnder Construction5p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3Unit 3D4p · 2 filings · 16 docs
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Viewest13203/22/2026
269 Realty Co1703/21/2026
View West Owners Ltd Orsid Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M Hashas1803/21/2026
Stecc403/21/2026
Nexus Consulting NYC1403/21/2026
AE Design Solution203/21/2026
Michael Zenreich Architect603/21/2026
S M Expediting603/21/2026
JM Zoning603/21/2026
Rand Engineering & Arch203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UbertoGeneral Contractor707/28/2026
Doumas ElectricElectrical403/21/2026
MC SuperstructureScaffold403/21/2026
A.A. Mechanical Solutionsspecialty_contractor303/21/2026
Signore & Sons PlumbingPlumbing207/08/2026
Irwin Electr'l Contractors, IElectrical203/21/2026
Penta Restorationspecialty_contractor207/08/2026
TM Construction of NYGeneral Contractor203/21/2026
Zacco BuildingGeneral Contractor204/09/2026
Aspect Plumbing & Heating CoPlumbing207/08/2026
DNA Plumbing ContractorsPlumbing207/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Mku ElectricElectrical103/22/2026
Premium ElectricElectrical103/22/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Urban-ServwellElectrical103/21/2026
Triumph Electric ServiceElectrical103/21/2026
J C Mechanicalspecialty_contractor107/08/2026
Object DesignGeneral Contractor107/08/2026
A.M.NPlumbing107/08/2026
MCM Plumbing & HeatingPlumbing107/08/2026
A & S Master ElectricalElectrical103/22/2026
Amor ElectricElectrical103/22/2026
Tri Borough ScaffoldingScaffold107/08/2026
JLC Electrical ContractingElectrical103/21/2026
Daven ElectricElectrical103/22/2026
Doumas ElectricElectrical103/22/2026
Adriatic Plumbing & HeatingPlumbing107/08/2026
A & S Master ElectricalElectrical103/21/2026
Dynamic Electric ServiceElectrical103/21/2026
Midway ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael Patino Architectu8170812/22/2025
Charles G Michel Engineering2871102/20/2025
Peter Brotherton Architects3418102/19/2025
Jack Green Associates422112/23/2024
Leo Y Lee Associates2481101/31/2024
Studio Nyandak Architectu8378105/17/2023
Rand Engineering & Architects266204/14/2023
ABS Engineering4835309/27/2021
S&S Architecturtal Design2840304/13/2021
Michael Zenreich Architects1724212/03/2020
P.a.collins Inspections P2168109/30/2019
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 09/18/2025, status Swarmp
07/27/2026
Permit renewed — Mechanical Systems
Renewed without changes
M01005196-S2-MS
07/16/2026
Co-op apartment 5D sold for $2,565,000
05/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/07/2026
Signed off — Alteration
Modification of mechanical system in apartment 3D. Work includes new A/C system, piping and modifications to existing steam radiators as shown on submitted plans. No changes in occupancy, use or egress.
M01156883-S1
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedUberto07/27/2026
DOB NOWStructuralPermit IssuedUberto04/28/2026
DOB NOWStructuralPermit IssuedUberto04/28/2026
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating04/06/2026
DOB NOWPlumbingSigned-offSignore & Sons Plumbing08/06/2025
DOB NOWMechanical SystemsPermit IssuedUberto07/31/2025
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating05/09/2025
DOB NOWGeneral ConstructionSigned-offUberto04/30/2025
DOB NOWStructuralPermit IssuedUberto04/30/2025
DOB NOWGeneral ConstructionPermit IssuedUberto04/28/2025
DOB NOWPlumbingSigned-offMCM Plumbing & Heating04/08/2025
DOB NOWMechanical SystemsSigned-offZacco Building04/03/2025
DOB NOWGeneral ConstructionSigned-offZacco Building04/01/2025
DOB NOWPlumbingSigned-offSignore & Sons Plumbing03/12/2025
DOB NOWGeneral ConstructionSigned-offObject Design02/12/2025
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration10/10/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure07/05/2024
DOB NOWSuspended ScaffoldPermit IssuedPenta Restoration02/07/2024
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration10/10/2023
DOB NOWPlumbingSigned-offA.M.N08/01/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure07/26/2023
DOB NOWGeneral ConstructionSigned-offTM Construction of NY07/07/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding03/21/2023
DOB NOWMechanical SystemsSigned-offJ C Mechanical01/08/2021
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co10/29/2020
DOB NOWMechanical SystemsSigned-offA.A. Mechanical Solutions09/09/2020
DOB NOWPlumbingSigned-offDNA Plumbing Contractors08/25/2020
DOB NOWPlumbingSigned-offDNA Plumbing Contractors08/20/2020
DOB NOWPlumbingSigned-offAdriatic Plumbing & Heating02/11/2020
BISOTISSUEDF.m.a.construction04/08/2022
BISOTISSUEDF.m.a.construction02/15/2022
BISOTISSUEDArtistic License10/27/2020
BISOTISSUEDF.m.a.construction07/29/2020
BISOTISSUEDFive Star Euro Construction07/17/2020
BISOTISSUEDF.m.a.construction01/07/2020
BISPLISSUEDPrimo Plumbing & HVAC03/05/2019
BISOTISSUEDZen Restoration11/05/2018
BISPLISSUEDR.J.C. Mechanical10/23/2018
BISOTISSUEDCallaghan Construction10/12/2018
BISOTISSUEDF.m.a.construction06/20/2018
+ 39 more permits on file
1 project · most recent 02/20/2025
Air Conditioning Systems
FiledStatusContractorScope
02/20/2025Signed-offZacco BuildingAir Conditioning Systems
2 projects · most recent 12/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/22/2025Permit IssuedOrbit Plumbing & HeatingGas, Water/Sanitary
02/20/2025Signed-offMCM Plumbing & HeatingGas, Water/Sanitary
24 projects · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026CompleteW 8 Electric—
05/28/2026CompleteTriumph Electric ServiceGeneral Wiring
12/30/2025CompleteDoumas ElectricGeneral Wiring
12/30/2025CompleteDoumas ElectricGeneral Wiring
07/23/2025CompleteMku ElectricGeneral Wiring
06/24/2025CompleteAmor ElectricGeneral Wiring
05/05/2025Permit IssuedAlba ElectricGeneral Wiring
02/20/2025CompleteLens Electric—
02/06/2025CompleteDaven Electric—
11/20/2023CompleteArgon ElectricalGeneral Wiring
03/19/2023CompleteNash Electric Services—
09/28/2022Permit IssuedIrwin Electr'l Contractors, IGeneral Wiring
11/10/2021CompleteApollo Electric NYGGeneral Wiring
06/18/2021CompleteGS ElectricGeneral Wiring
02/16/2021CompleteAll Ways Electric Corp.wGeneral Wiring
1 project · most recent 12/22/2025
Masonry
FiledStatusContractorScope
12/22/2025Permit IssuedUbertoMasonry
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
05/01/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/01/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
03/23/2026FinalMichael Patinoprogress
03/23/2026Energy Code Compliance InspectionsMichael Patinoprogress
03/23/2026Duct leakage testing, insulation and designMichael Patinoenergy_progress
03/23/2026Ventilation and air distribution systemMichael Patinoenergy_progress
03/23/2026Mechanical SystemsMichael Patinospecial
12/18/2025Ventilation and air distribution systemMichael Patinoenergy_progress
12/18/2025FinalMichael Patinoprogress
12/18/2025Energy Code Compliance InspectionsMichael Patinoprogress
12/18/2025Mechanical SystemsMichael Patinospecial
12/18/2025Fire-Resistant Penetrations and JointsMichael Patinospecial
12/18/2025Duct leakage testing, insulation and designMichael Patinoenergy_progress
10/22/2025Interior lighting powerMichael Patinoenergy_progress
10/22/2025Maintenance informationMichael Patinoenergy_progress
10/22/2025Lighting controlsMichael Patinoenergy_progress
10/22/2025Lighting in dwelling unitsMichael Patinoenergy_progress
10/22/2025Energy Code Compliance InspectionsMichael Patinoprogress
10/22/2025Post-installed AnchorsMichael Patinospecial
10/22/2025MasonryMichael Patinospecial
10/22/2025Fire-Resistant Penetrations and JointsMichael Patinospecial
10/22/2025FinalMichael Patinoprogress
10/22/2025Fire-Resistance Rated ConstructionMichael Patinoprogress
03/04/2025Fire-Resistant Penetrations and JointsMichael Patinospecial
03/04/2025Fire-Resistant Penetrations and JointsMichael Patinospecial
03/04/2025MasonryMichael Patinospecial
03/04/2025Post-installed AnchorsMichael Patinospecial
Latest 25 of 51.
1,038 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account